}

Tender For Construction Of New Road Starting From Shri Prabhunath Pandeys House To Jwalamukhi Colony - Excavation For Roadwork In Soil With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers,Trimming Bottom And Side S, varanasi-Uttar Pradesh

Public Works Department has published Tender For Construction Of New Road Starting From Shri Prabhunath Pandeys House To Jwalamukhi Colony - Excavation For Roadwork In Soil With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers,Trimming Bottom And Side S. Submission Date for this Tender is 25-02-2025. Road Work Tenders in varanasi Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47843256
Tender For Construction Of New Road Starting From Shri Prabhunath Pandeys House To Jwalamukhi Colony - Excavation For Roadwork In Soil With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers,Trimming Bottom And Side S
Open Tender
NCB
Uttar Pradesh
Varanasi
25-02-2025

Tender Details

Tender For Construction of new road starting from Shri Prabhunath Pandeys house to Jwalamukhi Colony - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 2 Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 3 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smooth wheel roller to achieve the desired density,complete as per Technical Specification clause 401.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 4 Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 5 Construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade) coarse and fine aggregates confoming to IS:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.Asdirectionby theE/I, (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 6 Construction ofSubgrade and earthen shoulders with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 7 M-150 brick work in 1:6 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect.As in item 303 above but in 1:6 cement and coarse sand mortar.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 8 Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work.but excluding cost of collor (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 9 PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 12 to 24) 10 1st year- maintainance cost 0%CC &Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 11 2nd year- maintainance cost 0.25 % CC &Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 12 3rd year- maintainance cost 0.5 %CC &Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 13 4th year- maintainance cost 0.75 % CC &Drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 14 5th year- maintainance cost 1 % CC &Drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

Key Value

Document Fees
INR 2714 /-
EMD
INR 340000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail