| 1 | Fixing of Rate Contract for Maintainance/Emergent works of Distribution Network in the jurisdiction of Electric Division-IJPDCL Parade Jammu. For the financial year 2025-26. |
| 2 | Erection ofPCC 8 Mtr Pole |
| 3 | Erection ofPCC 9 Mtr Pole |
| 4 | Erection ofPCC 11 Mtr Pole |
| 5 | Erection ofST 8 Mtr Pole |
| 6 | Erection ofST 9 Mtr Pole |
| 7 | Erection ofST 11 Mtr Pole |
| 8 | Erection ofST 13 Mtr Pole |
| 9 | Dismantling of PCC Pole 8 Mtr Long |
| 10 | Dismantling of PCC Pole 9 Mtr Long |
| 11 | Dismantling of PCC Pole 11 Mtr Long |
| 12 | Dismantling ofST Pole 8 Mtr Long |
| 13 | Dismantling ofST Pole 9 Mtr Long |
| 14 | Dismantling of ST Pole 11 Mtr Long |
| 15 | Dismantling ofST Pole 13 Mtr Long |
| 16 | Unloading of PCC 8 Mtr Pole |
| 17 | Unloading of PCC 9 Mtr Pole |
| 18 | Unloading of PCC 11 Mtr Pole |
| 19 | Unloading of ST 8 Mtr Pole |
| 20 | Unloading of ST 9 Mtr Pole |
| 21 | Unloading of ST 11 Mtr Pole |
| 22 | Unloading of ST 13 Mtr Pole |
| 23 | loading of PCC 8 Mtr Pole |
| 24 | loading of PCC 9 Mtr Pole |
| 25 | loading of PCC 11 Mtr Pole |
| 26 | loading of ST 8 Mtr Pole |
| 27 | loading of ST 9 Mtr Pole |
| 28 | loading of ST 11 Mtr Pole |
| 29 | loading of ST 13 Mtr Pole |
| 30 | Average carriage of PCC 8 Mtr Pole upto 100 Mtr |
| 31 | Average carriage of PCC 8 Mtr Pole upto 100 - 200 Mtr |
| 32 | Average carriage of PCC 9 Mtr Pole upto 100 Mtr |
| 33 | Average carriage of PCC 9 Mtr Pole upto 100 - 200 Mtr |
| 34 | Average carriage of PCC 11 Mtr Pole upto 100 Mtr |
| 35 | Average carriage of PCC 11 Mtr Pole upto 100 - 200 Mtr |
| 36 | Average carriage of ST 8 Mtr Pole upto 100 Mtr |
| 37 | Average carriage of ST 8 Mtr Pole upto 100 - 200 Mtr |
| 38 | Average carriage of ST 9 Mtr Pole upto 100 Mtr |
| 39 | Average carriage of ST 9 Mtr Pole upto 100 - 200 Mtr |
| 40 | Average carriage of ST 11 Mtr Pole upto 100 Mtr |
| 41 | Average carriage of ST 11 Mtr Pole upto 100 - 200 Mtr |
| 42 | Average carriage of ST 13 Mtr Pole upto 100Mtr |
| 43 | Average carriage of ST 13 Mtr Pole upto 100 - 200 Mtr |
| 44 | Installation of Link Set |
| 45 | Installation of DO Set |
| 46 | Installation of HG Set |
| 47 | Installation of GO Set |
| 48 | Installation of LA Set |
| 49 | Average carriage of 25 KVA upto 100 Mtr |
| 50 | Average carriage of 63 KVA upto 100 Mtr |
| 51 | Average carriage of 100 KVA upto 100 Mtr |
| 52 | Average carriage of 25 KVA 100 - 200 Mtr |
| 53 | Average carriage of 63 KVA 100 - 200 Mtr |
| 54 | Average carriage of 100 KVA 100 - 200 Mtr |
| 55 | Average carriage of 250 KVAupto 100 Mtr |
| 56 | Average carriage of 300 KVAupto 100 Mtr |
| 57 | Average carriage of 400 KVAupto 100 Mtr |
| 58 | Average carriage of 500 KVAupto 100 Mtr |
| 59 | Average carriage of 630 KVAupto 100 Mtr |
| 60 | Average carriage of 250 KVA 100 - 200 Mtr |
| 61 | Average carriage of 300 KVA 100 - 200 Mtr |
| 62 | Average carriage of 400 KVA 100 - 200 Mtr |
| 63 | Average carriage of 500 KVA 100 - 200 Mtr |
| 64 | Average carriage of 630 KVA 100 - 200 Mtr |
| 65 | loading of 25 KVA Transformer |
| 66 | loading of 63 KVA Transformer |
| 67 | loading of 100 KVA Transformer |
| 68 | loading of 250 KVA Transformer |
| 69 | loading of 300 KVA Transformer |
| 70 | loading of 400 KVA Transformer |
| 71 | loading of 500 KVA Transformer |
| 72 | loading of 630 KVA Transformer |
| 73 | Unloading of 25 KVA Transformer |
| 74 | Unloading of 63 KVA Transformer |
| 75 | Unloading of 100 KVA Transformer |
| 76 | Unloading of 250 KVA Transformer |
| 77 | Unloading of 300 KVA Transformer |
| 78 | Unloading of 400 KVA Transformer |
| 79 | Unloading of 500 KVA Transformer |
| 80 | Unloading of 630 KVA Transformer |
| 81 | Mounting of 25KVA Transformer |
| 82 | Mounting of 63KVA Transformer |
| 83 | Mounting of 100KVA Transformer |
| 84 | Mounting of 250KVA Transformer |
| 85 | Mounting of 300KVA Transformer |
| 86 | Mounting of 400 KVA Transformer |
| 87 | Mounting of 500 KVA Transformer |
| 88 | Mounting of 630 KVA Transformer |
| 89 | Erection of Guys in HT Line |
| 90 | Erection of Guys in LT Line |
| 91 | Earthing of Substation complete(Poles,Transformer,CT/PT,LA) |
| 92 | Dismantling of Link Set |
| 93 | Dismantling of DO Set |
| 94 | Dismantling of G O Set |
| 95 | Dismantling ofHG Set |
| 96 | Dismantling of LA Set |
| 97 | Dismantling of GO Set |
| 98 | Erection of Jumper SetHT Side |
| 99 | Erection of Jumper Set LT Side |
| 100 | Dismantling of Jumper SetHT Side |
| 101 | Dismantling of Jumper Set LT Side |
| 102 | Dismounting of 25 KVA Transformer |
| 103 | Dismounting of 63KVA Transformer |
| 104 | Dismounting of 100KVA Transformer |
| 105 | Dismounting of 250KVA Transformer |
| 106 | Dismounting of 300KVA Transformer |
| 107 | Dismounting of 400KVA Transformer |
| 108 | Dismounting of 500KVA Transformer |
| 109 | Dismounting of 630KVA Transformer |
| 110 | Erection of ACSRSquirel Conductor |
| 111 | Erection of ACSRWeasel Conductor |
| 112 | Erection of ACSRRabbit Conductor |
| 113 | Erection of ACSRDog Conductor |
| 114 | Dismentling of ACSRSquirrel Conductor |
| 115 | Dismentling of ACSRWeasel Conductor |
| 116 | Dismentling of ACSRRabbit Conductor |
| 117 | Dismentling of ACSRDog Conductor |
| 118 | Tightening of loose conductor Squirrel/Weasel |
| 119 | Tightening of loose conductor Rabbit/Dog |
| 120 | Route clearance for making path for Corridor of 5 mtr./KM |
| 121 | Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) |
| 122 | Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCBwith Box |
| 123 | Dismantling of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCBwith Box |
| 124 | Branch Cutting |
| 125 | Unloading T & Pitems i.eLine materials Substations/HT/LT lines |
| 126 | Loading T & Pitems i.eLine materials Substations/HT/LT lines |
| 127 | Average carriage ofT & Pitems i.eLine materials Substations/HT/LT linesupto 100 Mtr |
| 128 | Average carriage of T & Pitems i.eLine materials Substations/HT/LT lines 100 - 200 Mtr |
| 129 | Survey/Route Alignment |
| 130 | Drilling of Holes /Each |
| 131 | Fixing/Installation of 11 KV Disc Insulators with fittings |
| 132 | Dismentling of 11 KV Disc Insulators with fittings |
| 133 | Fixing of U-Clamps and Shackle Insulators |
| 134 | Dismentling of U-Clamps and Shackle Insulators |
| 135 | Fixing of 11 KV Pin Insulators with Pins |
| 136 | Dismentling of 11 KV Pin Insulators with Pins |
| 137 | Fixing of Top Clamps for Pin Insulators |
| 138 | Dismentling Fixing of Top Clamps for Pin Insulators |
| 139 | Fixing of Braces |
| 140 | Dismentling Fixing of Braces |
| 141 | Fixing of Danger Plates |
| 142 | Dismantling of Danger Plates |
| 143 | Fixing of Anti Climbing DevicesPlates |
| 144 | Dismentling Fixing of Anti Climbing DevicesPlates |
| 145 | Painting of Steel Tubular Poles Including Cross arms clamps etc. (Upto 9 Mtr.) |
| 146 | Painting of Steel Tubular Poles Including Cross arms clamps etc. (Above 9 Mtr.) |
| 147 | Painting of Cross arms and Clamps of PCC/Wooden Poles. |
| 148 | Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole and cross arm etc. |
| 149 | Fixing of Spacers for LV Lines (for 5 Wire System) |
| 150 | Fixing of Spacers for LV Lines (for 4 Wire System) |
| 151 | Fixing of Spacers for LV Lines (for 3 Wire System) |
| 152 | Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto includiung 250 KVA) |
| 153 | Fixing ofMS Channels 4.5/3 feet long along with Braces |
| 154 | Fixing ofM S Angle Iron 9 feet long crossarm |
| 155 | Fixing ofMS Angle Iron 5/4.5/3 feet long crossarm |
| 156 | Unloading of CT/PT Unit |
| 157 | Average carriage of CT/PT Unit upto 100 Mtr |
| 158 | Average carriage of CT/PT upto 100 - 200 Mtr |
| 159 | Erection of CT/PT Unit along with Trivector Meter |
| 160 | Erection of CTPT Unit |
| 161 | Testing and commissioning of CT/PT Unit |
| 162 | Fixing of Suspension/Anchoring Clamps |
| 163 | Laying of HT AB Cable 35 mmsq |
| 164 | Laying of HT AB Cable 50 mmsq |
| 165 | Laying of HT AB Cable 70 mmsq |
| 166 | Laying of HT AB Cable 95 mmsq |
| 167 | Laying of HT AB Cable 120 mmsq |
| 168 | Laying of HT AB Cable 185 mmsq |
| 169 | Laying of HT AB Cable 300 mmsq |
| 170 | Laying of HT AB Cable 400 mmsq |
| 171 | Laying of HT XLPE Cable 35 mmsq |
| 172 | Laying of HT XLPE Cable 50 mmsq |
| 173 | Laying of HT XLPE Cable 70 mmsq |
| 174 | Laying of HT XLPE Cable 95 mmsq |
| 175 | Laying of HT XLPE Cable 120 mmsq |
| 176 | Laying of HT XLPE Cable 185mmsq |
| 177 | Laying of HT XLPE Cable 300 mmsq |
| 178 | Laying of HT XLPE Cable 400 mmsq |
| 179 | Laying of LT AB Cable 35 mmsq |
| 180 | Laying of LT AB Cable 50 mmsq |
| 181 | Laying ofLT AB Cable 70 mmsq |
| 182 | Laying ofLT AB Cable 95 mmsq |
| 183 | Laying ofLT AB Cable 120 mmsq |
| 184 | Laying of LT AB Cable 185 mmsq |
| 185 | Laying of LT AB Cable 300 mmsq |
| 186 | Laying of LT AB Cable 400 mmsq |
| 187 | Laying of LT XLPE Cable 35 mmsq |
| 188 | Laying of LT XLPE Cable 50 mmsq |
| 189 | Laying ofLT XLPE Cable 70 mmsq |
| 190 | Laying ofLT XLPE Cable 95 mmsq |
| 191 | Laying ofLT XLPE Cable 120 mmsq |
| 192 | Laying of LT XLPE Cable 185 mmsq |
| 193 | Laying of LT XLPE Cable 300 mmsq |
| 194 | Laying of LT XLPE Cable 400 mmsq |
| 195 | Dismantling of HT AB Cable 35 mmsq |
| 196 | Dismantling of HT AB Cable 50 mmsq |
| 197 | Dismantling of HT AB Cable 70 mmsq |
| 198 | Dismantling of HT AB Cable 95 mmsq |
| 199 | Dismantling of HT AB Cable 120 mmsq |
| 200 | Dismantling of HT AB Cable 185mmsq |
| 201 | Dismantling of HT AB Cable 300 mmsq |
| 202 | Dismantling of HT AB Cable 400 mmsq |
| 203 | Dismantling of HT XLPE Cable 35 mmsq |
| 204 | Dismantling of HT XLPE Cable 50 mmsq |
| 205 | Dismantling of HT XLPE Cable 70 mmsq |
| 206 | Dismantling of HT XLPE Cable 95 mmsq |
| 207 | Dismantling of HT XLPE Cable 120 mmsq |
| 208 | Dismantling of HT XLPE Cable 185mmsq |
| 209 | Dismantling of HT XLPE Cable 300 mmsq |
| 210 | Dismantling of HT XLPE Cable 400 mmsq |
| 211 | Dismantling of LT AB Cable 35 mmsq |
| 212 | Dismantling of LT AB Cable 50 mmsq |
| 213 | Dismantling ofLT AB/ Cable 70 mmsq |
| 214 | Dismantling ofLT AB Cable 95 mmsq |
| 215 | Dismantling ofLT AB Cable 120 mmsq |
| 216 | Dismantling of LT AB Cable 185 mmsq |
| 217 | Dismantling of LT AB Cable 300 mmsq |
| 218 | Dismantling of LT AB Cable 400 mmsq |
| 219 | Dismantling of LT XLPE Cable 35 mmsq |
| 220 | Dismantling of LT XLPE Cable 50 mmsq |
| 221 | Dismantling ofLT XLPE Cable 70 mmsq |
| 222 | Dismantling ofLT XLPE Cable 95 mmsq |
| 223 | Dismantling ofLT XLPE Cable 120 mmsq |
| 224 | Dismantling of LT XLPE Cable 185 mmsq |
| 225 | Dismantling of LT XLPE Cable 300 mmsq |
| 226 | Dismantling of LT XLPE Cable 400 mmsq |
| 227 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines |
| 228 | Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables ofLT Lines |
| 229 | Dismantling of Pin Insulators |
| 230 | Dismantling ofMS Channels 4.5/3 feet long along with Braces |
| 231 | Dismantling ofM S Angle Iron 9 feet long |
| 232 | DismantlingofMS Angle Iron 5/4.5/3 feet long |
| 233 | Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by department for this item) |
| 234 | Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by Contractor for this item) |
| 235 | Fixing of IPC 120/50mm |
| 236 | Service connection (Domestic/Commercial) |
| 237 | Laying of LT PVC Single Core Cable 95 mmsq |
| 238 | Laying of LT PVC Single Core Cable 185 mmsq |
| 239 | Laying of LT PVC Single Core Cable 300 mmsq |
| 240 | Laying of LT PVC Single Core Cable 400 mmsq |
| 241 | Laying of LT PVC Single Core Cable 630 mmsq |
| 242 | Fixing of Al. Thimbles of different Sizes 95 mmsq |
| 243 | Fixing of Al. Thimbles of different Sizes 185 mmsq |
| 244 | Fixing of Al. Thimbles of different Sizes 300 mmsq |
| 245 | Fixing of Al. Thimbles of different Sizes 400 mmsq |
| 246 | Fixing of Al. Thimbles of different Sizes 630 mmsq |
| 247 | Stone Pad (300 mmx 300 mm x 75 mm) |
| 248 | Fixing of Aluminium Jointing Sleeves |
| 249 | Fixing of Suspension/Tension Clamp with eye hook |
| 250 | Fixing of Wedge connectors/PG Clamps |
| 251 | Fixing of GI Barbed wire for anti climbing |
| 252 | Sundry items like aluminium Lugs, jumpers, binding , Tape. |
| 253 | Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU\"s for Outgoing Circuits |
| 254 | Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU\"s for Outgoing Circuits |
| 255 | Laying of 3 and a half corePVC 95 mmsqLT XLPE Cable/ AB Cable |
| 256 | Fixing of LT Distribution Box for 500/630 KVA DTR with MCCB for incomer & SFU\"s for Outgoing Circuits |
| 257 | Fixing of Nuts & Bolts |
| 258 | Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit |