|
| 1 | Charges for attending to breakdown /overhaul works of Strong Acid Cation, including consumables and T&Ps |
| 2 | Charges for attending to breakdown /overhaul works of Strong Base Anion, including consumables and T&Ps |
| 3 | Charges for attending to breakdown /overhaul works of Weak Base Anion, including consumables and T&Ps |
| 4 | Charges for overhauling of D.M. water storage tanks in DM plant I and II including consumables and T&Ps |
| 5 | Charges for overhauling (or) attending any breakdown maintenance of pressure sand filter including consumables and T&Ps |
| 6 | Charges for overhauling (or) attending any breakdown maintenance of Activated Carbon Filter including consumables and T&Ps |
| 7 | Charges for overhauling (or) attending any breakdown maintenance of mixed bed including consumables and T&Ps |
| 8 | Charges for attending breakdown / overhaul of contact tank including consumables &T&Ps. |
| 9 | Charges for attending breakdown / overhaul of DG Towers including consumables &T&Ps. |
| 10 | Charges for attending breakdown / overhaul of degassed water storage tanks in DM plant I & II including consumables &T&Ps. |
| 11 | Charges for attending breakdown / overhaul works of Acid tank / Alkali storage tank / Polishing unit / Dilution tanksetc., including consumables and T&Ps |
| 12 | Charges for dismantling the Netralising pit pumps cleaning, replacing wornout parts, reassembling, alignment and commissioning the pump, including consumables and T&Ps. |
| 13 | Charges for overhauling of pumps in DM plant I & II including consumables and T&Ps. |
| 14 | Charges for overhauling of blowers in DM plant I & II including consumables and T&Ps. |
| 15 | Charges for replacing of wornout M.S / MS flanged rubber lined pipes of size 12mm to 80mm NB including transport, consumables, T&Ps. |
| 16 | Charges for replacing of wornout MS / MS flanged rubber lined pipes of size 100mm to 200mm NB including transport, consumables T&Ps. |
| 17 | Charges for fabrication of straight bend and spool pieces with 80 NB to 200 NB M.S. ERW / MS rubber lined pipes having flange at end erection of the same including transport, consumables and T&Ps charges. |
| 18 | Charges for fabrication of ‘Tee’ spool pieces having flange at 3 to 4 ends with 80 NB to 200 NB M.S. ERW / MS flanged rubber lined pipes erection of the same, including transport, consumables and T&Ps charges. |
| 19 | Charges for decoupling the motor during breakdown / overhaul of motor by other agency, alignment of motor and coupling the motor with pump in DMplant I & II. |
| 20 | Charges for replacing worn out valves / NRVs of size 200mm NB including consumables and T&Ps etc. |
| 21 | Charges for replacing worn out valves / NRVs of size 150mm NB includingconsumables and T&Ps etc. |
| 22 | Charges for replacing worn out valves / NRVs of size 100mm NB including consumables and T&Ps etc. |
| 23 | Charges for replacing worn out valves / NRVs of size 80mm NB including consumables and T&Ps etc. |
| 24 | Charges for replacing worn out valves / NRVs of size 50/40mm NB including consumables and T&Ps etc. |
| 25 | Charges for replacing worn out valves / NRVs of size 25/20mm NB including consumables and T&Ps etc. |
| 26 | Charges for replacing the damaged / leaky Neoprene rubber diaphragm / Flap of size 200mm NBincluding consumables and T&Ps etc. |
| 27 | Charges for replacing the damaged / leaky Neoprene rubber diaphragm / Flap of size 150mm NBincluding consumables and T&Ps etc. |
| 28 | Charges for replacing the damaged / leaky Neoprene rubber diaphragm / Flap of size 100mm NBincluding consumables and T&Ps etc. |
| 29 | Charges for replacing the damaged / leaky Neoprene rubber diaphragm / Flap of size 80mm NB including consumables and T&Ps etc. |
| 30 | Charges for replacing the damaged / leaky Neoprene rubber diaphragm / Flap of size 50/40mm NBincluding consumables and T&Ps etc. |
| 31 | Charges for replacing the damaged / leaky Neoprene rubber diaphragm / Flap of size 25/20mm NBincluding consumables and T&Ps etc. |
| 32 | Chargesforcleaning of workshoparea, EOT cranewalk way over EOT crane including consumables etc. |
| 33 | Chargesfor various machining operations in lathe,drilling machine for eight hours duration in work shop |