| 1 | Initial Rehabilitation |
| 2 | Cutting of shurbfrom the road way or with in R.O.Wincluding disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORDas per direction of the Engineer in charge. |
| 3 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 4 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 5 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 6 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Meansand disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. |
| 7 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 8 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 9 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 10 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MORD technical specifications Clause 1915as per direction of the Engineer in charge. |
| 11 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 12 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 13 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 14 | Reinforced cement concrete M15grade kilometre stoneof standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MORD technical Specification Clause 1703as per direction of the Engineer in charge |
| 15 | 200 mtr Stone |
| 16 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 17 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 18 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 19 | KM Stone |
| 20 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 21 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 22 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 23 | Providing and fixing of retro reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.2.3 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 300,800,1700 as per direction of the Engineer in charge.(600 mmcircular) |
| 24 | Informatory Board 800x600 mm |
| 25 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 26 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 27 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 28 | Cautionary Sign Board 600 mm Circular |
| 29 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 30 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 31 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 32 | Cautionary Sign Board 600 mm Triangular |
| 33 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 34 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 35 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 36 | Place Identification Board (600x600) mm |
| 37 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 38 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 39 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 40 | Construction of RCC Guide Posts of 250mm dia M15 grade cast-in-situ with 20mm nominal size aggregate,true to line and grade,tolerance of vertical RCC Posts not to exceed 1 in 500 as per drawing and Technical Specification clause 1608.2. |
| 41 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 42 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 43 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 44 | Construction of subgrade / Earthern shoulder with approved materials obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement as per MORD technical Specification Clause 303 with all leads & lift as per direction of the Engineer in charge (By mechanical means). |
| 45 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 46 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 47 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 48 | Earthwork in excavationfor foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitablematerial upto 3mt.as per direction of Engineer-in-Charge. |
| 49 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 50 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 51 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 52 | Providingand constructing well compacted drainage layer above the subgrade of roadwork with approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002. |
| 53 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 54 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 55 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 56 | Providing concrete for plain / reinforced concrete of M15 garde in open foundation complete as per drawing andMORD technical specification Clause 800,1100,1200and as per direction of Engineer-in-Charge. |
| 57 | In Foundation |
| 58 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 59 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 60 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 61 | Upto Bed level |
| 62 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 63 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 64 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 65 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORDtechnical specification Clauses 614, 709, 1204and as per direction of the Engineer in charge. |
| 66 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 67 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 68 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 69 | Construction of Un-Reinforced, Plain Cement Concrete Pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. |
| 70 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 71 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 72 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 73 | Periodic Renewal |
| 74 | Providing and applying PRIMER COAT With Bitumen Emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as perMORD Technical Specification Clause 502 for low porosity surface and as per direction of Engineer-in-Charge. |
| 75 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 76 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 77 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 78 | Providing and applying TACK COAT With Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 of MoRD & as per direction of Engineer-in-Charge. |
| 79 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 80 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 81 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 82 | Providing & Laying SEMI DENSE BITUMINOUS CONCRETE(SDBC) with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MOSRT&H Specification for Road & Bridge works (4th Revision)(A/R-2006 page-175 item No-47). |
| 83 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 84 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 85 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 86 | Emergency works(Work to be taken up as per the requirement & separate work order to be issued by PIU) |
| 87 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 88 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 89 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 90 | Routine Maintenance (After Renewal Coat) |
| 91 | BT Pavement |
| 92 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 93 | For 1st Year |
| 94 | For 2nd Year |
| 95 | For 3rd Year |
| 96 | For 4th Year |
| 97 | For 5th Year |
| 98 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 99 | For 1st Year |
| 100 | For 2nd Year |
| 101 | For 3rd Year |
| 102 | For 4th Year |
| 103 | For 5th Year |
| 104 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 105 | For 1st Year |
| 106 | For 2nd Year |
| 107 | For 3rd Year |
| 108 | For 4th Year |
| 109 | For 5th Year |
| 110 | CC Pavement |
| 111 | (A) L084-Bhejaput to Hanjaraguda Via Charangul (OR-19-ADB-123) |
| 112 | For 1st Year |
| 113 | For 2nd Year |
| 114 | For 3rd Year |
| 115 | For 4th Year |
| 116 | For 5th Year |
| 117 | (B) L070-Doraput to Jharaput (OR-19-241) |
| 118 | For 1st Year |
| 119 | For 2nd Year |
| 120 | For 3rd Year |
| 121 | For 4th Year |
| 122 | For 5th Year |
| 123 | (C) L074-PWD Road to Jagamput (OR-19-493) |
| 124 | For 1st Year |
| 125 | For 2nd Year |
| 126 | For 3rd Year |
| 127 | For 4th Year |
| 128 | For 5th Year |