Tender For 8-Annual Rate Contract (Arc) For Road Furniture Work In Municipal Limits Of Sumerpur . - Providing and laying marking of center line and stop line etc with hot thermoplastic compound 2.5 mm thick on road/ plain surface, including reflectorising glass beads @ 250 gms per sqm area with special applicator machine, as per IRC:35 including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control involved. The finished surface to be level, uniformand free from streaks and holes as per clause 803 ofoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion 2 Providing and fixing “L” type bollard 135cm height made out of 1.25mm thick M.S. sheet welded in conical section having upper dia 15cm and lower dia 20cm with another attachment of 150x150x7mm thick plate and hold fast at bottom, whole body is painted in white stove enamel and red reflective 3 band, each of 7.5cm and one reflective sheet of 15cm dia provided to it complete in all respectincluding all material, labour, diversion. 3 Providing and fixing “SWISS” type bollard 134cm height made out of 1.25mm thick M.S. sheet welded in conical section having upper dia 15cm and lower dia 20cm with another attachment of mandatory 7mm thick plate and fixed with the help of 7cm long, 30cm dia chrome plated MS tube, this part is fixed on the body with another attachment of a cap 30x7cm, whole body is painted in black stove enamel and mandatory plate in azure blue with one compulsory keep left arrow with 10mm border reflective strip each of 7.5cm on body complete in all respect including all material, labour, diversion. 4 Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil 5 Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below 6 Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks 7 Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.Bituminous courses 8 Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.Granular courses 9 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). 10 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing and staircase railing including applying a priming coat of approved steel primer.M.S. tube. 11 Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade : Two or more coats on new work 12 Providing & fixing letters/boarders from reflective tape of approved quality in standardwidth of MoRTH specifications clause 800.Providing & fixing Border (50mm wide) 13 providing & fixing two way reflectrive metal body raised road studs with anchor with shank 100x100x19.8 and 2x43 pieces special reflectrive elements 19 degree tilted etc. complete made by swareflex at 9m m. centre to centre on edge on pedstrai crossing including fixing cost of coneyance of allmaterials to site including labur and hire charges for machineries involved etc. complete as per starndard specifications and directions of the engineer in charge.