Tender for Year 2024-25 Road Safety Long Term Improvement Work Of Kaiserpur Tiraha Black Spot Located At Km 61 Of Moradabad Gawan Bulandshahr Road (Including Anupshahr Dibai Part) Sh-148, A Black Spot Identified In Accident Prone Area In Sambhal District. - Dismantling brick work or stone work in lime or cement mortar and including stacking or materials as directed by the Engineer-in-charge with in a distance of 60 meter (200 feet). SI No 692 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 2 Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately 2.05, 202 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 3 Dismantling reinforced cement concrete or reinforced brick work including stacking of materialsas directed by the Engineer-in-charge with in a distance of 60 meter (200 feet).SI No 694 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 4 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 5 Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 6 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 7 Providing and applying primer coat with SS -1 grade bitumen emulsionon prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 8 Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 9 Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 10 Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 11 Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. SI No- 509 complete in all respects 12 Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 13 Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawingandincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 14 Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 450 mm high in M 20 gradeon M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 15 Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floorsand incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for propercompletion of the work. SI No- 281 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 16 M-150 Brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour, curing and T&P etc. required for proper completion of the work. S.I. No. 307 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 17 2.5cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm Graded approved stone grit laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and including 8cm thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4cm gauge in the proportion of 1:4:8 and removing any over lapping mortar and the joints of the panels if any and giving then uniform finishing including supply of all materials, labour and T&P etc. required for proper completion of the work. SI No 601 andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 18 R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost. SI No- 283 (A) andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 19 Mild steel or iron in plain work such as but of fabrication of gril and stair case railing (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel . SI No 502(c) andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 20 Supply and fixing Galvanized corrugated iron roofing 24 B.W.G. in position including supply of all materials, labour, Tools &plants etc. required for proper completion of the work and including wastage.(S.I. No. 536) andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 21 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications 13.06, Section 1600 & 2200andincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. 22 Painting first coat over priming coat (including cost of priming coat & wall Putty) on wood or steel and other metal surface with superior synthetic enamel paint of standared make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand paparing and stripping including cost matter and scoured with wire brushes fine steel/ wood scrappers sand papering and knotting including coat ofallandincluding all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. SI No chp 15 New Item 1 a+2+12