|
| 1 | Providing and Fixing of MS Iron framed Structure for Floral arch/ torans of using 75 mm square / rectangular /circular MS Pipe, MS wire mesh, MS flats, etc complete with all the joints, painting /bolting/ welding etc.inclusive of loading/ unloading, transportation, fabrication,excavation and CC 1:2:4 all complete as per drawings & specifications and as per direction of Engineer -In- Charge. Agency must ensure the structural stability of structure. |
| 2 | Providing and Fixing of topiary (human figure) framed Structure for Selfie Points with square MS Pipe/ MS wire mesh/ MS flats/ floral foam/thermocol sheet in any shape etc complete with all the joints, painting, bolting/ welding etc. inclusive of loading/ unloading, transportation, fabrication,excavation and CC 1:2:4 all complete as per drawings & specifications and as per direction of Engineer -In- Charge. Agency must ensure the structural stability of structure. |
| 3 | Providing and Fixing of Floral dolphin of MS Pipe, MS wire mesh, MS flats, floral foam /Thermocol sheet etc complete with all the joints ,painting, bolting/ welding etc. inclusive of loading/ unloading, transportation, fabrication, excavation and CC 1:2:4 all complete as per drawings & specifications and as per direction of Engineer -In- Charge. Agency must ensure the structural stability of structure. |
| 4 | Providing and Fixing of floral topiary (peacock figure) framed Structure for Selfie Points with square MS Pipe/ MS wire mesh/ MS flats/ floral foam/thermocol sheet in any shape etc complete with all the joints, painting, bolting/ welding etc.inclusive of loading/ unloading, transportation, fabrication,excavation and CC 1:2:4 all complete as per drawings & specifications and as per direction of Engineer -In- Charge.Agency must ensure the structural stability of structure. |
| 5 | Providing and Fixing of topiary (honeybees figure) framed Structure for Selfie Points with square MS Pipe/ MS wire mesh/ MS flats/ floral foam/thermocol sheet in any shape etc complete with all the joints, painting, bolting/ welding etc. inclusive of loading/ unloading, transportation, fabrication,excavation and CC 1:2:4 all complete as per drawings & specifications and as per direction of Engineer -In- Charge. Agency must ensure the structural stability of structure. |
| 6 | Providing and Fixing of topiary (palaash 2025 in Hindi and English letter figure ) framed Structure for Selfie Points with square MS Pipe/ MS wire mesh/ MS flats/ floral foam/thermocol sheet in any size/ shape etc complete with all the joints, painting, bolting/ welding etc. inclusive of loading/ unloading, transportation, fabrication,excavation and CC 1:2:4 all complete as per drawings & specifications and as per direction of Engineer -In- Charge. Agency must ensure the structural stability of structure. |
| 7 | Less for correction factor (1.00-0.973) |