|
| 1 | Laying and termination of 3.5C x 120 Sqmm LT Aluminium Armoured cable in over head and part under ground including digging of soil as per instructions of engineer in charge. |
| 2 | Supply of 3.5C x 120 Sqmm LT Aluminium Armoured cable. Make. Polycab/ Finolex/ Havells/ Gloster / KEI / KEC |
| 3 | Removal of existing 1.5 to 4 Sqmm aluminium wiring from the existing conduits |
| 4 | Supply of 1.5 Sqmm Cu flexible wire Make. Polycab/ Finolex/ Havells/ Gloster / KEI / KEC |
| 5 | Laying and termination of 1.5 Sqmm Cu flexible wire Make. Polycab/ Finolex/ Havells/ Gloster / KEI / KEC |
| 6 | Installation of Earth Pits as per IS-3043 Standards |
| 7 | Installation of 10SWG GI Wire from earth pits to dedicated locations as per instructions of engineer in charge |
| 8 | Supply of 10 SWG GI Wire |
| 9 | Supply of PDB as per the Annexure – 1 |
| 10 | Installation and cable termination of PDB as per the instructions of engineer in charge |
| 11 | Supply of 45W bay lights, Make. Crompton/ Bajaj / Havells |
| 12 | Installation and wiring of 45W bay lights in the existing shed of 15Mtrs height as per instructions of engineer in charge |
| 13 | Supply of 45/50W LED Street lights, Make. Crompton / Bajaj / Havells |
| 14 | Installation of 45/50W LED street lights as per the instructions of engineer in charge, on boundary walls with Angular Bends pipe of suitable size, Supply of Bend pipe in scope of Party |
| 15 | Supply , wiring and termination of 6Way TPN MCB DB, with 32A 4 Pole MCB-1 Nos, 6 to 16 Amps, 1 P, MCB 15 No’s Make- L&T,Havells/Schneider |
| 16 | Installation of 6Way TPN MCB DB, with 32A 4 Pole MCB-1 Nos, 6 to 16 Amps 1 P, MCB 15 No’s Make- L&T,Havells/Schneider |
| 17 | Supply of 1200MM Sweep ceiling fan, Make. Crompton / Bajaj / Havells |
| 18 | Installation and wiring of 1200MM Sweep ceiling fan, with supply of Fan rod of suitable length |
| 19 | Removal and dismantle of Old Lighting DBs as per instructions of engineer in charge, size Max 500x1000mm, metal/wooden |