| 1 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 2 | 17.14.1]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix methodConstruction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 3. Grading I material [Through Rate] |
| 3 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Materialwith water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve thedesired density as per technical clause 406 of MORT&H specifications |
| 4 | [17.25.1]Prime Coat @ 0.85kg per sqm 1. Prime Coat @ 0.60kg per sqm Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer atthe rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications |
| 5 | [17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications |
| 6 | 17.30.2-Dense Graded Bituminous Macadam withBatch Type HMP 2. Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Note-If bitumen required is more than 4.5% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work.Applied Note: 3. The through rates of road items are based on the rates of bitumen from Panipat Refinery as on 15.04.2021 and rates of aggregates at the quarry site. The through rates for each road work will be worked out based on the rate of the bitumen on that date and overall lead of quarry materials from nearest quarry from shortest route. |
| 7 | 17.31.2-Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work.Applied Note: 3. The through rates of road items are based on the rates of bitumen from Panipat Refinery as on 15.04.2021 and rates of aggregates at the quarry site. The through rates for each road work will be worked out based on the rate of the bitumen on that date and overall lead of quarry materials from nearest quarry from shortest route. |
| 8 | 17.6-Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. |
| 9 | 20.63.1-`Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISImarked K-9 grade SandS pipes as per 15:8329-2000(amended up to date), with internal cement mortar lining forpotable water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning asper Technical Specifications and as per direction of Engineer.Note: E/W to be measured and paid separately.` 1. 100 mm i/d Applied Note: 000,2. The rates for stringing out cast iron, A.C., P.V.C. and hume pipes and their specials etc. provided under this chapter which are in the wider sense labour rates in case of which the material is generally issued to the constructions free of cost from the stores of the engineer in-charge or the nearest Railway station include the carriage of material within a radious of 5 Km of the site of works. |
| 10 | [21.84.3]Constructing brick masonry inspection Chamber sizes as given below up to 0.60 metre average depth in cement mortar 1:5 lime concrete with 40 per cent lime mortar 2:3 in foundation cement concrete 1:2:4 benching12mm thick cement plaster 1:2 with a floating coat of 1 mm thick of neat cement R.C.C. 1:2:4 slab 100 mm thick/cement concrete topping, 50mm thick with 455mmx455mm / 455mm x610mm inside light duty C.I. inspection chamber cover and frame weight as per I.S.I.specification painted with 3 coats of black bitumastic superior paint complete as per standard design. 3. Size 600 mm X900 mm inside (with 455 mm x 455 mm cover andframe light duty single seal weighing 20 kg with R.C.C.slab) |
| 11 | [21.85.3]Extra for every 0.30 metre depth of Inspection chamber 3. 600 mm x 900 mm inside |
| 12 | [21.87.1.1]Constructing brick masonry road gullychambers as per standard drawings (as persizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as perspecified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coatof neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coaltar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 1.1. Single roadgully chamber - Size: 610mm x 457mm x 800mm |
| 13 | [21.90.4.1]Construction of rectangular standard brick masonry manhole chambers to standard drawings on S.W.pipe sewers or other circular pipe sewers up to the requireddepth in 1.5 cement sand mortar, lime concrete in bed andsides of pipe sewer and cement concrete 1:2:4 in benching,12 mm thick water tight 1:2 cement sand plaster with a floating coat of neat cement and finished with 2 coats of sodium silicate on interior surface where required, reinforced cement concrete slab 180mm thick fixing 560mm internal diameter C.I. manhole cover and frame weight not less than 2.5 quintal painted with 3 coats of black bitumen paint, fixing galvanised malleable iron stepsembedded in 1:2 cement sand mortar complete. the ratecovers the cost of M.S. steel for R.C.C. slab labour for fixing and carriage of C.I. manhole frame and cover and malleable iron steps from the stores of the Engineer-incharge of the works to the site of works. The rate alsoinclude the cost of accurately planned and fitted centring, supports for all works as well as for all curves and special work, cleaning out their beds etc. sodium silicate shall be supplied free of cost at the stores of the Engineer-incharge. 4.1. On 200 mm internal diameter pipe sewer - |
| 14 | 21.95.2-Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigotand socketed joints manufactured with ISI marked sulphateresistance cement as per ISI 12330 with rubber rings ISImarked antiternmite as required at site in to trenches for alldepths and laying out the same to correct alignment gradientsand levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing withrubber rings in trenches and jointing with 1:3/2 cement sandmortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree withfaces of spigot of socket joints cutting and finishing the cutsurface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. theinternal diametric of the sewer being: 2. 400 mm |
| 15 | [21.96.2]Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour,sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer.Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 2. 225 mm Outside Dia |
| 16 | [34.11.2]Informatory sign board 900x600 rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheetinghaving aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steelsection post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as perclause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming toclause 6.7 of IRC 67-2012 2. Using high intensity Microprisomatic grade retro reflective Sheeting Class B as per IRC 67 2012 |
| 17 | 34.26-Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 18 | 4.1-Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 19 | 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer in-charge. 1. All kinds of soil |
| 20 | 4.16.1.2-Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.2. All kind of soil Pipes, cables etc, exceeding 80 mm dia but not exceeding 300 mm dia. |
| 21 | [6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |