Tender For Playground, Oman Gym, Solar Light work in Primary School in Patni - (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M.from the foundation trenches. (where machine cannot move ) As per S.I. No.-251(a) 2 Concrete with 4 cm. gauge Stone ballast, Corse sand. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.As per S.I. No.-281 3 M-150 Brick Work in one white lime & Three Surkhi mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work As per S.I. No.-303 4 M-150 Brick Work in 1:4 (one cement & Four corse Sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the workAs Per S.I. No.- 305(a) 5 12 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work.As Per S.I. No.- 584 6 R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. As per S.I. No.-283 7 R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.50:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra R.C.C. Raft foundation and footing. As per S.I. No.-287(a) 8 Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and aiso including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. (Royality removed by Govt ) for small works/ Abadi area. (where machine can not move ). including cartageAs per Analysis of Rate. 9 R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.50:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wireAs per S.I. No.-289 10 M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.As Per Analysis 11 Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. As Per S.I. No.- As Per S.I. No-660+661 12 M.S. or iron work ofZ Section window excluding Glass panes. including rivetting or welding where necessary. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work Openable panelsFrorM.S. Grills,/Stair Case Railing Etc as per si no-502a 13 Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.As Per S.I. No.-279 (a) 14 Construction of Granular Sub Base by providing Well graded material, spreading in uniform layers with Motor grader/Tractor mounted appropriate equipmenton prepared surface, mixing by mix in place methodwith Rotavator at OMCand compacting with Smooth wheel roller to achieve the desired density complete as per TechnicalSpecification Clouse 401 15 Supply of 60mm thick ISI marked confirming to IS: 15658-2006 I shaped mechanically compressed interloking cement concerete paver blocks, smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibrocompression mechanism. high pressure and control vibration machine having plan dimension 200 x (160+120mm) with minimum 5mm thick topping of O.P. cement mixed with 25% marble powder. The Compressive strength of concerete paver block shall not be less than 40 MPa and weight 4.50 kg per No. confirming to IS: 1565 As Per New Item -13 Ch-20 16 Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer-in-charge Horticulture D.S.R. 2020 item no2.34 17 Supply and fixing of a sign boardincluding necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the workAs Per S.E. (R.E.D.), Saharanpur Sanction