}

Tender For Quotation For Different Items Work For Museum Area At Pandit Deen Dayal Museum At Lucknow , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigera, lucknow-Uttar Pradesh

Irrigation Department has published Tender For Quotation For Different Items Work For Museum Area At Pandit Deen Dayal Museum At Lucknow , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigera. Submission Date for this Tender is 04-02-2025. Bolts Tenders in lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47465810
Tender For Quotation For Different Items Work For Museum Area At Pandit Deen Dayal Museum At Lucknow , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigera
Open Tender
NCB
Uttar Pradesh
Lucknow
04-02-2025

Tender Documents

Tender Details

Quotation For Different Items Work For Museum Area At Pandit Deen Dayal Museum At Lucknow , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 41.1 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 34.9 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 28.6Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 22.2 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 19.1 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 15.9 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 12.7 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 9.5 Mm , Low Side Refrigerant Piping Supply, Installation , Testing And Commissioning Of Interconnectingrefrigerant Copperpipe Work Suitable For R-410A Refrigerant With (19Mm / 13Mm Thick) Closed Cell Elastomeric Nitrile Rubber Tubular Insulation Between Each Set Ofindoor & Outdoor Units As Per Specifications, All Piping Inside The Room.All Pipingshall Be Properly Supported With Ms,Gi Studs / Clamps / Hangers. All Piping Shall Be Pressure Tested For 1.5 Times The Working Pressure. The Refregerant Pipes Running In Vertical Shaft Shall Be Supported On Ms Angle And Wooden Saddle At Every 1200 Mm Distance And The Pipes Which Are Running Horizontally Above The False Ceiling Should Be Supported On Ms Angle/Slotted Angle At Every 1200 Mm Distance. (Make :- Mandev, Mexflow) 6.4 Mm , Refrigerant Piping Y-Joints Or Headers As Required To Connect The Above Outdoor Units And Indoor Units. (Make :- Daikin, Bluestar, Mitsubhishi) Supply Of Y-Joint Indoor Unit , Refrigerant Piping Y-Joints Or Headers As Required To Connect The Above Outdoor Units And Indoor Units. (Make :- Daikin, Bluestar, Mitsubhishi) Supply Of Y-Joint Outdoor Unit , Low Side Control Wiring Supply, Installation, Testing And Commissioning Of 2C X 1.5Sqmm Control Cum Transmission Wiring/Power/Control Cabling With Pvc Insulated, Pvc Sheathed, Multicore Copper Conductor Control Cable In Suitable Conduits Between Indoor And Outdoor Units And Its Remote Controllers. (Make :- Anchor, Havels, Rr) , Drain Piping Supply, Installation , Testing And Commissioningof Hard Pvc Drain Piping Of Complete With U Trap Fittings And Elbows From The Indoor Unit Point To The Nearest Drain Point Complete With Fittings, Supports, Valve And 6 Mm Thick Closed Nitrile Rubber Foam Insualtion As Per Specifications & Drawings. (Make :- Prince, Supreme, Astral) 50 Mm , Drain Piping Supply, Installation , Testing And Commissioningof Hard Pvc Drain Piping Of Complete With U Trap Fittings And Elbows From The Indoor Unit Point To The Nearest Drain Point Complete With Fittings, Supports, Valve And 6 Mm Thick Closed Nitrile Rubber Foam Insualtion As Per Specifications & Drawings. (Make :- Prince, Supreme, Astral) 40 Mm , Drain Piping Supply, Installation , Testing And Commissioningof Hard Pvc Drain Piping Of Complete With U Trap Fittings And Elbows From The Indoor Unit Point To The Nearest Drain Point Complete With Fittings, Supports, Valve And 6 Mm Thick Closed Nitrile Rubber Foam Insualtion As Per Specifications & Drawings. (Make :- Prince, Supreme, Astral) 32 Mm , Drain Piping Supply, Installation , Testing And Commissioningof Hard Pvc Drain Piping Of Complete With U Trap Fittings And Elbows From The Indoor Unit Point To The Nearest Drain Point Complete With Fittings, Supports, Valve And 6 Mm Thick Closed Nitrile Rubber Foam Insualtion As Per Specifications & Drawings. (Make :- Prince, Supreme, Astral) 32 Mm , Supply, Installation, Testing And Commissioning Of Flexible Canvass Cloth Connection At Oulet Of Each Ducted Indoor Unit With Zipper To Facilitate Temperature Measurement , Supply, Installation, Testing And Commissioning Of Flexible Canvass Cloth Connection At Oulet Of Each Ducted Indoor Unit With Zipper To Facilitate Temperature Measurement , Dome Work 12Mm Thick Polycarbonate Sheet Including Aluminium Fitting Top & Bottam, Rubber Sheet Etc. Complete

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail