Construction Of Fire Protection Wall In Between Pt I And Iii And Ii And Iii In Mettupalayam 11022 Kv Ss , A) In Between Power Transformer I & Iii Dismantling And Removing The Existing Plain Cement Concrete Including Cost Of Labour Charges, Lead, Lift, Etc., Complete As Per Standard Specification. , Earth Work Excavation In Hard Gravelly Soil, Stiff Black Cotton Soil, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth Mixed With Small Sized Boulders Etc., Complete As Per Standard Specification. , Filling With M.Sand For Foundation Includingcost Of Sand, Filling Charges, With All Leads And Lifts, Watering, Consolidation Etc., Complete. , Plain Cement Concrete In Cc 1:3:6, Using 20Mm Hbg Metal, For Foundation Including Cost Ofall Materials, Labour Charges Including Consolidation, Curing, All Leads, Lifts Etc., Complete. , Reinforced Cement Concrete 1:1.5:3 Mix Using 12Mm To 20Mm Hbg Downgraded Metal Machine Crushed For Raft Foundation Including Cost All Materials, Labour, Curing, Lead, Lift, Cost Of Shuttering Etc., Complete But Excluding Cost Of Steel Reinforcement. , Reinforced Cement Concrete 1:1.5:3 Mix Using 12Mm To 20Mm Hbg Downgraded Metal Machine Crushed Below Ground Level Including Cost Ofall Materials, Labour, Curing, Lead, Lift, Cost Of Shuttering Etc., Complete But Excluding Cost Of Steel Reinforcement. , Providing Steel Reinforcement With Ms/Rts Rods Of Reputed Approved Make For Reinforced Concrete Works, Including Cost Of Steel Ms/Rts Rods, Binding Wire, Minor T&Ps Labour Charges For Cutting, Straightening Bending As Per Type Design Drawing, Placing Aligning And Tying Properly With All Leads And Lift Etc., Complete As Per Standard Specification. , Refilling With Excavated Earth Other Than Sand With An Initial Head Load Of 100M And Depositing The Earth As Directed By The Officer In Charge, Well Rammed, Watered And Consolidation Etc., Complying With Standard Specification. , Brick Work In Cm 1:5 Using Chamber Burntclass Ii Bricks/Fly Ash Bricks, Including Cost Of All Materials, Labour, Scaffolding, Curing, All Leads And Lifts Etc., Complete. , Plastering In Cm 1:5, 12 Mm Thickincluding Cost Of All Materials, Scaffolding Charges,Labour Charges, Lead, Lift Etc., Complete. , Painting Two Coats With Exterior Emulsion Paint Over One Coat Ofwhite Cement Of Best Qualityincluding Cost Of All Materials, Scaffolding Charges, Labour, Lead, Lift Etc., Complete. , Disposal Of Excess Of Surplus Earth Away In Low Lying Area With A Head Load Lead 100M And Lorry Lead Of 5 Km Including Spreading, Levelling, Labour, Leads, Lifts Etc., Complete. , B) In Between Power Transformer Ii & Iii Dismantling And Removing The Existing Plain Cement Concrete Including Cost Of Labour Charges, Lead, Lift, Etc., Complete As Per Standard Specification. , Earth Work Excavation In Hard Gravelly Soil, Stiff Black Cotton Soil, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth Mixed With Small Sized Boulders Etc., Complete As Per Standard Specification. , Filling With M.Sand For Foundation Includingcost Of Sand, Filling Charges, With All Leads And Lifts, Watering, Consolidation Etc., Complete. , Plain Cement Concrete In Cc 1:3:6, Using 20Mm Hbg Metal, For Foundation Including Cost Ofall Materials, Labour Charges Including Consolidation, Curing, All Leads, Lifts Etc., Complete. , Reinforced Cement Concrete 1:1.5:3 Mix Using 12Mm To 20Mm Hbg Downgraded Metal Machine Crushed For Raft Foundation Including Cost All Materials, Labour, Curing, Lead, Lift, Cost Of Shuttering Etc., Complete But Excluding Cost Of Steel Reinforcement. , Reinforced Cement Concrete 1:1.5:3 Mix Using 12Mm To 20Mm Hbg Downgraded Metal Machine Crushed Including Cost Ofall Materials, Labour, Curing, Lead, Lift, Cost Of Shuttering Etc., Complete But Excluding Cost Of Steel Reinforcement. , Providing Steel Reinforcement With Ms/Rts Rods Of Reputed Approved Make For Reinforced Concrete Works, Including Cost Of Steel Ms/Rts Rods, Binding Wire, Minor T&Ps Labour Charges For Cutting, Straightening Bending As Per Type Design Drawing, Placing Aligning And Tying Properly With All Leads And Lift Etc., Complete As Per Standard Specification. , Refilling With Excavated Earth Other Than Sand With An Initial Head Load Of 100M And Depositing The Earth As Directed By The Officer In Charge, Well Rammed, Watered And Consolidation Etc., Complying With Standard Specification. , Brick Work In Cm 1:5 Using Chamber Burntclass Ii Bricks/Fly Ash Bricks, Including Cost Of All Materials, Labour, Scaffolding, Curing, All Leads And Lifts Etc., Complete. , Plastering In Cm 1:5, 12 Mm Thickincluding Cost Of All Materials, Scaffolding Charges,Labour Charges, Lead, Lift Etc., Complete. , Painting Two Coats With Exterior Emulsion Paint Over One Coat Ofwhite Cement Of Best Qualityincluding Cost Of All Materials, Scaffolding Charges, Labour, Lead, Lift Etc., Complete. , Disposal Of Excess Of Surplus Earth Away In Low Lying Area With A Head Load Lead 100M And Lorry Lead Of 5 Km Including Spreading, Levelling, Labour, Leads, Lifts Etc., Complete. , Sgst To Be Quoted In Percentage (Value Alone)Ex. 9%, It Should Be Entered As 9 Only , Cgst To Be Quoted In Percentage (Value Alone) Ex. 9%, It Should Be Entered As 9 Only , Inter-State Gst @18% For Other Than Tamil Nadu Supplier. If The Contractor Is Within Tamil Nadu May Be Quoted As 0 Only