Auction Sale Of Released Condemned And U/S Scrap Old Station Buildings And Quarters Of Vrg And Mgg Under Custody Of Sse-Works-I-Ujn, {(1) Old Station Building- 01Unit, Location- Vrg, Consisting (I) Ms Scrap(Door, Window, Round Bar, Reinforcement Bar In Slab, Gi Pipe, Flates, Angle, Ms Grills, Wire Mesh Grills) Qty- 7584.61 Kg Approx (Ii) Rail(60R/41.25R), Qty- 138.41 Kg Approx, (Iii) Wooden Scrap(Door, Window, Wooden Frame, Vents), Qty- 442.76 Kg Approx, (Iv) Pvc Tank 5000 Ltr- 1Number, (V) Debries (Concrete, Brick, Stone), Qty- 261.17 Cum Approx, (2) Old Station Building- 01Unit, Location- Mgg Consisting, (I) Ms Scrap(Door, Window, Round Bar, Reinforcement Bar In Slab, Gi Pipe, Steel Grills, Aluminium Window), Qty- 7869.55 Kg Approx (Ii) Rail (50R/75R/41.25R) Qty- 2072.55 Kg Approx, (Iii) Wooden Scrap (Door, Window, Vents), Qty- 380.00 Kg Approx, (Iv) Pvc Tank 5000 Ltr- 2 Number, (V) Debries (Concrete, Brick, Stone), Qty- 279.08 Cum Approx, (3) Old Adst Office- 01Unit, Location- Vrg, Consisting (I) Ms Scrap (Door, Window, Reinforcement Bar In Slab, Gi Pipe, Angle, Wire Mesh Grill, Aluminium Window), Qty- 4044.25 Kg Approx, (Ii) Wooden Scrap (Door), Qty- 180.00 Kg Approx, (Iii) Debries (Concrete, Brick, Stone), Qty- 115.81 Cum Approx, (4) Quarter Nbre 11 A To D - 04Unit, Location- Vrg, Consisting (I) Ms Scrap(Door, Window, Vents, Reinforcement Bar In Slab, Gi Pipe, Angle, Ms Grill, Flats) Qty- 8217.36 Kg Approx (Ii) Wooden Scrap (Wooden Frame), Qty- 36.76 Kg Approx, (Iii) Pvc Storage Tank 5000 Ltr, Qty- 1 Number, (Iv) Debries (Concrete, Brick, Stone), Qty- 190.57 Cum Approx}, (5) Quarter Nbre 8/Ab- 02Unit, Location- Vrg, Consisting (I) Ms Scrap(Door, Reinforcement Bar In Slab, Gi Pipe, Angle, Ms Grill) Qty- 3613.75 Kg Approx (Ii) Wooden Scrap(Door, Window, Vents), Qty- 276.00 Kg Approx, (Iii) Debries (Concrete, Brick, Stone), Qty- 172.43 Cum Approx}, (6) Quarter Nbre 7/Ab - 02Unit, Location- Vrg, Consisting (I) Ms Scrap(Door, Window, Vents, Reinforcement Bar In Slab, Ms Pipe, Angle, Ms Grill) Qty- 4506.10 Kg Approx (Ii) Debries (Concrete, Brick, Stone), Qty- 97.92 Cum Approx},Total? 11 Unit. Mode Of Delivery By Lot Basis And On As Is Where Is Basis, Custodian- Sse-Works-I-Ujn, Fdp- 50 Days. Note- (1) Fencing Of Rails, Tie Bar, Tie Bar Fencing, Wooden Blocks, Rails, Gi Sheets, Angles, Ss Railing, Barricading Posts Are Not Included In This Structure, (2) All Type Of P. Way Materials Laying Surrounding The Structure Are Not Included In This Lot, (3) Cutting Will Be Allowed From Ground Level Only, (4) Other Than Jvr Assessed Materials Will Not Be Delivered To Firm.