|
| 1 | Boundary Wall |
| 2 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth. sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. |
| 3 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plint |
| 4 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin : a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 5 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) 1 : 1 : 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size). |
| 6 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 7 | Reinforcement of RCC work including bending, binding and placing in position complete. a) TMT bars |
| 8 | Centring and shuttering including strutting, propping etc. and removal of form work for: a) Foundation, footings, bases of columns etc. and mass concrete. |
| 9 | b) Column, pillars, posts and struts etc. |
| 10 | Brick work with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand). |
| 11 | 12 mm thick cement plaster 1:3( 1 cement : 3 fine sand) |
| 12 | Applying one coat of cement primer of approved brand and manufacture on wall surface. |
| 13 | Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade |
| 14 | Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.a) In tees, Angle and channel |
| 15 | b) GI Barbed Wire |
| 16 | Internal Road |
| 17 | Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth,lead upto 50 m) |
| 18 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc.and rerolling the sub grade. |
| 19 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) |
| 20 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. ) |
| 21 | Approach road |
| 22 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) a) By Manual Means:-In area of Area of Lightjungle |
| 23 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)a) Girth from 300 mm to 600 mm |
| 24 | b) Girth from 600 mm to 900 mm |
| 25 | c) Girth from 900 mm to 1800 mm |
| 26 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) |
| 27 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) |
| 28 | Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth,lead upto 50 m) |
| 29 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc.and rerolling the sub grade. |
| 30 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) |
| 31 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. ) |
| 32 | Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408) |
| 33 | Main Gate |
| 34 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 35 | Providing and laying cement concrete1:3:6 (1cement:3 coarses and:6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in a) Foundations and plinth. |
| 36 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 37 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 38 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1: 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smoothand even surface but excluding cost of centering, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 39 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 40 | Centring and shuttering including strutting, propping etc and removal of form work for:a) Foundation, footings, bases of columns etc. and mass concrete. |
| 41 | c) Column, pillars, posts and struts etc. |
| 42 | d) Lintels, beams, girders, bressumers and cantilevers etc. |
| 43 | Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/TMT steel |
| 44 | Brick work with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand). |
| 45 | White glazed tiles 5mm.thick in flooring, skirting, risers of step and dado in 12 mm thick cement plaster 1 : 3(1 cement: 3 coarse sand) painted with white cement slurry. |
| 46 | 12 mm cement plaster 1 : 4 (1 cement : 4 fine sand). |
| 47 | 6 mm cement plaster to ceiling 1 : 3 (1 cement : 3 fine sand). |
| 48 | Applying two or more coat of wall putty as per direction of engineer-in-charge. |
| 49 | Applying one coat of cement primer of approved brand and manufacture on wall surface. |
| 50 | Finishing walls with water proofing cement paint of approved brand and manufacturerequired shade on new work (three or more coats) to give an even shade. |
| 51 | Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.b) In Tees, Angles, Flats and Channels |
| 52 | Footpath with Rcc base, 60 mm thick paver block and kerb stone ending |
| 53 | CC drain |
| 54 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 55 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 56 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth |
| 57 | b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level. |
| 58 | Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete. |
| 59 | b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 60 | Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/ TMT steel |
| 61 | 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand). |
| 62 | Neat cement punning. |
| 63 | RCC Culvert |
| 64 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)i) Ordinary soil-a) Manual Means (Depth upto 3 m) |
| 65 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.) |
| 66 | Plain / Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.PCC Grade M20 (Height upto 5m) |
| 67 | Furnishing and Placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification. RCC Grade M20 (Using Concrete Mixer - Height upto 5m) |
| 68 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification |
| 69 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specfication.a) Square Rubble Coursed rubble masonry (first sort ) |
| 70 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification.a)Granular material |
| 71 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |