| 1 | Providing storm water Drainage |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrockrequiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 3 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering iffound necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) |
| 4 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 |
| 5 | Laying Plain cement concrete 1:2:4 (One cement,two sand and four aggregates) using 20mm ISS Hard broken granite stone jelly for plain cement concreteworks excluding cost of shuttering, and centering including all labour charges and incidental charges for cost and conveyance of all materials to work site, mixing and laying concrete finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.28) |
| 6 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) |
| 7 | Suppling and fabricating and placing in position MS(or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors. |
| 8 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCCitemsof works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and alsoincluding fixingfan clamps and fixtures in rccworkswherever necessary as directed by departmentalofficer etc., complete. |
| 9 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 10 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. |