Supply Of Materials For School Kitchen Room Work,Villege Jangamanakoppa, Gp Agadi - Lumpsum Material_Ga,Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Material_Ga,Licenced Plumber With Tools_Ga,Lead Or Pvc Connection Pipe 32Mm Dia (For Wash Basin)_Ga,C.I. / M.S. Brackets For Flushing Cistern_Ga,Brass Stop Cock_Ga,Cp Brass Waste 32 Mm Of Standard Pattern_Ga,Cp Brass Chain With Plug_Ga,Copper Plated Brass Piller Tap 15Mm_Ga,White Vitreous China Clay Flat Back Wash Basin Size 630X450mm_Ga,Granite Sink 23Cm Thick_Ga,Vitrified Tiles 600X600 Mm_Ga,White Cement_Ga,Ceramic Tiles 30 X 30 Cms_Ga,Lime_Ga,Add Brush, Putty, Sand Paper At 5% On Cost Of Paint_Ga,Liquid Wood Filler_Ga,Primer_Ga,Add Brush, Putty, Sand Paper, Roller At 1% On Cost Of Paint_Ga,Water Proofing Cement Paint_Ga,Add Brush, Putty, Glue At 5% On Cost Of Paint_Ga,Whitening_Ga,Dry Distemper_Ga,Add Hom Of Welding And Grinding Machine At 2% On Material_Ga,Fabricator_Ga,Thick Plain Glass 5.50 Mm_Ga,Chrominum Plated Screws_Ga,Cleat Angles_Ga,Alluminium Handles - 15 Mm_Ga,Alluminium Tower Bolt - 20 Cm_Ga,Pvc Beading_Ga,Rubber Beading For Shutters Beading_Ga,Nylon Rollers_Ga,Powder Coated 60-70 Micron_Ga,Mason Class I (With Tools)_Ga,Add Brush At 1% On Cost Of Paint_Ga,Enamel Metal Paint_Ga,Add Providing And Removing Scaffolding At 3% On Labour_Ga,Painter Class I_Ga,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint_Ga,Ready Mix Primer Paint (Ready Mix Red Lead Paint)_Ga,Add Hom Of Welding And Grinding Machine At 4% On Material_Ga,Welder Grade I_Ga,Fitter Class I_Ga,Ms Flat_Ga,M.S Rods_Ga,Mathi/Nandi Wood Scantling_Ga,Hom Of Machinaries For Planing_Ga,Add Cutting And Other Wastage 5%_Ga,Mathi/Nandi Wood Planks For Panels 25 Mm Thick_Ga,Add Handling , Loading And Unloading At 1% On Material_Ga,Burnt Bricks Class 35 (Non Modular)_Ga,Add Watering Charges At 1 % On Labour_Ga,Mixer (Concrete Small Used In Culvert)_Ga,Bond Stone 20 X 20 X 45 Cm_Ga,Rubble Stones_Ga,Binding Wire_Ga,Tmt Bars Fe 500_Ga,Casurina Poles 75 - 100 Mm Dia_Ga,Add Handling , Loading And Unloading At 2% On Material_Ga,Casurina Poles 100 - 150 Mm_Ga,Silver Oak Or Equivalent Planks 38 Mm Thick_Ga,Jungle Wood Runners And Planks_Ga,Hom Of Vibrator 0.71 Days_Ga,Plasticizer / Super Plasticizer_Ga,Add Watering Charges At 1 % On Material_Ga,Mixer (Concrete) - 1 Cum Capacity_Ga,Portland Cement_Ga,Coarse Sand (Zone Iii)_Ga,Broken Stone Aggregate 12 Mm To 10 Mm Size_Ga,Broken Stone Aggregate 20 Mm Size_Ga,Broken Stone Aggregate 40 Mm Size_Ga