| 1 | Dead Body PlatformSite Clearance |
| 2 | Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m. dressing of sides and bottom and backfiling in trencher with excavated suitable material. (PWD SOR No. 251) |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m with normal lead upto 50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2as per technical specification clause 301.5. |
| 4 | Sand filling in plinth including suppy of necessary of sand from a distance not exceding 8 kms. From the site of work and including watering. Dressng etc rate to include cost off all materials labour T & P etc required for proper completion of work (PWD- 255+Local Sand) |
| 5 | Provinding and laying cement concrete 1:4;8 (1 Cement:4 coarse and: 8 Stone ballast 40 mm nominal Size) including supply of all materials, labour T&P etc required for proper completion of the work and curing complete also including cost of formwork in foundation & Floors. (PWD-281) |
| 6 | First Class brick work in 1 : 6 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. (PWD-303+305b-305a) |
| 7 | Providing and laying Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stones ballast 20 mm. nominal size) including supply of all materials, labour and T & P etc.required for proper completionof the workand curing complete, also including cost of formwork in foundation and floors.PWD 279(b) |
| 8 | 12mm. Thick plaster with cement mortar in proportion of 1:2 cement & fine sand of 1.25 F.M. PWD 580 |
| 9 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade. including supply of all materials, labour and T&P etc. required for proper completion of work.PWD 660+661 |
| 10 | Seating PlatformSite Clearance |
| 11 | Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m. dressing of sides and bottom and backfiling in trencher with excavated suitable material. (PWD SOR No. 251) |
| 12 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m with normal lead upto 50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2as per technical specification clause 301.5. |
| 13 | Sand filling in plinth including suppy of necessary of sand from a distance not exceding 8 kms. From the site of work and including watering. Dressng etc rate to include cost off all materials labour T & P etc required for proper completion of work (PWD- 255+Local Sand) |
| 14 | Provinding and laying cement concrete 1:4;8 (1 Cement:4 coarse and: 8 Stone ballast 40 mm nominal Size) including supply of all materials, labour T&P etc required for proper completion of the work and curing complete also including cost of formwork in foundation & Floors. (PWD-281) |
| 15 | First Class brick work in 1 : 6 cement and fine sand of 2.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. (PWD-303+305b-305a) |
| 16 | Providing and laying Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stones ballast 20 mm. nominal size) including supply of all materials, labour and T & P etc.required for proper completionof the workand curing complete, also including cost of formwork in foundation and floors.PWD 279(b) |
| 17 | 12mm. Thick plaster with cement mortar in proportion of 1:2 cement & fine sand of 1.25 F.M. PWD 580 |
| 18 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade. including supply of all materials, labour and T&P etc. required for proper completion of work. |
| 19 | P/F of Asbestus sheet roofing with truss (MR) |
| 20 | Cost of ConstructionGround Floor |
| 21 | Add for Internal water Supply & Sewerage system work |
| 22 | Add for Internal Electrical work |