Repair To Drr 2224 Sc-DRR 2224:- Complete overhauling of the engine by way of removing the Engine foundation bolts and extracting the engine by crane. Dismantling the engine and removing the damaged/ worn out parts. P/f of cylinder lining-4Nos., Piston assembly along with piston rings-4Nos. P/f of big end and small end bearings to the connecting rod, gudgeon pin-4Nos., connecting rod bolts along with nut 8Nos. P/f of crank bearing, head gasket along with complete gasket set. P/f of timing gear set along with oil seal. P/f of inlet and outlet valves along with valve guide 08Nos. P/f of circlip-1set, exhaust valve 4Nos. along with springs. P/f of camshaft bush and cam shaft bearing, rocker arm. P/f of fly wheel ring, complete water body assembly .The job also includes grinding of crank shaft to the required size, fitment of new cylinder liner, setting of crank shaft for free rotation , line boring of cylinder block& fitting of cylinder lining, grinding of cam shaft bush ,fitment of cam shaft, grinding of valve & valve seat to match each other, fitment of valve guides , facing of cylinder head,fitment of small end bush to connecting rod, P/f of oil filter-1 no., fuel filter set-1no., high pressure injector pipe-4 nos., fuel pipe main (fuel tank to feed pump)-01no.,fuel pipe main (feed pump to filter)-01no.,fuel pipe( filter to FIP pump) -01no., fuel pipe return (FIP to fuel tank)-01no.,pipe oil pressure-01no.,oil pressure gauge -01no., water temp. gauge-1 no., fan belt-1 no. Complete assembling of the engine with new parts, testing it and mounting on the machine. P/f of engine sump studs-12Nos.The job includes cost of material and labour charges . 2 DRR 2224:- Repairs to the 1st inter shaft of the machine bydismantling it from the machine and then removal of damaged/worn out parts cleaning with k.oil and then P/f of new parts i.e 1st inter shaft pinion 9p5- 01No., retaining screw 9p1- 01No., lock washer 9p2- 01No., spiral bevel wheel 9p3- 01No., bearing 9p4- 01No., 1st inter shaft & (pinion integrated) 9p7- 01No., distance washer 9p8- 01No., shim set 9p10-01set, circlip seeger 9p12- 01No. Assembling the gear box. Testing at site. Job includes cost of material, taxes and labour charges as per site conditions.. 3 DRR 2224:- Repairs to the 2nd Inter Shaft of the machine by way of dismantling the gear box and removing the damaged parts and p/f of new parts 2nd inter shaft & pinion (integrated) 9p19-01 No, bearing 9p15-01 No., pinion ist and 2nd speed 9p22-01 No., bearing 9p25-01 No. assembling the gear box of the machine.Testing at site. Job includes cost of material, taxes and labour charges as per site conditions. 4 Rebate on account of old parts (absolute)