Supply Of Required Materials For Construction Of Cc Road From Babu Betageri House To Babu Goudra House Of Golihalli Village Of Khanapur Taluk - Tractor 40 Hpp,Tcrushed Stone Course Aggregate 53,Granite Metal- 40Mm Size,Granite Metal 20 Mm Sized,Coarse Sand (Zone- 3),Portland Cement Supply,Crushed Stone Chippings 13.2Mm Size,Supply Of Gravel 2.36 Mm Or Murrum,Providing Water,Vibratory Roller 8 Tonne On Rent,Form Work At1 Percent,Plasticizer Or Superplasticizer,Broken Granite Metal 10 Mm Size,Broken Granite Metal With 20 Mm Size,Broken Stone Aggregate With 40 Mm Size,Concrete Mixer With 0.4/0.28 Cum Capacity,Water Tanker With 6 Kl Capacity,Needled Vibrator,Screed Vibrators,Hiring Of Plate Vibrator,Concrete Joint Cutting Machine For Initial And Final Cut,Polythene Sheet 125Mm Micron Thickness,Bitumen Primer At 200 Ml Per Joint,Bituminous Sealant 800 Ml/Joint For 23 Joints,De-Bonding Strips 3.75 M (Length) X 10 Mm (Width) X 5Mm (Thick) Cut-Out Of Rubber Filler Board Or Similar Material Including 5Percent Wastage,Joint Filler Board 20Mm Thick As Per Is1838,Binding Wire For Bar Binding,Broken Stone Aggregate 12 Mm To 10 Mm Sized,Broken Stone Aggregate 20 Mm Sized,Casurina Poles 100-150 Mm Size,Granite/Trap Broken Metal 100 Mm And Down Sized,Silver Oak / Equivalent Planks 38 Mm Thick,Tmt Bars Fe 500 (Steel),Hom Of Vibarator 0.71 Days,Concrete Mixer With 1 Cum Capacity,Air Compressor (For 1 Hour Initial And For 1 Hour Final),Handling, Loading And Unloading At The Rate Of 2% On Material,Add Watering Charges At The Rate Of 1 % On Labour,Watering Charges At The Rate Of 1 Percent On Material,Bhistii,Carpenter Ii Nd Class,Fitter - Grade1,Mason (Brick Layer) 1 St Class,Mason (Brick Layer )Ii Nd Class,Mistry.,Mali (Semi Skilled)