| 1 | Supply of following material as per RESPO Drawings/standard technical specifications. |
| 2 | ST Pole 13 Mtrs Long |
| 3 | Stone Pad |
| 4 | Cross Arm V Type 33 KV |
| 5 | F Bracket for 33 KV |
| 6 | Cross Arm Holding Clamp |
| 7 | 33 KV Pin Insulator |
| 8 | 33 KV Pin with Nut |
| 9 | Barbed Wire |
| 10 | All. Binding Wire |
| 11 | Number Plate with Clamp & N/B |
| 12 | Danger Board with Clamp |
| 13 | Nut Bolt with Washer |
| 14 | Armour Rod with Farular |
| 15 | All. Paint |
| 16 | Red Oxide Paint |
| 17 | Earth Wire Clamp with N&B |
| 18 | Cross Arm Holding Angle with Clamp with Nut & Bolts for ST Pole 65x65x6 mm 1600 mm |
| 19 | 33 KV MS Top Channel 125x65x3200 mm with 2 Clamps |
| 20 | 33 KV MS Dropper Channel 100x50x3000 mm with 2 clamps |
| 21 | MS Cross Bracing Angle 65x65x6x4300 mm with 02 no. Bracing and 4 Clamps |
| 22 | 33 KV Disc Insulator B&S Type 7000 Kg. |
| 23 | 33 KV Disc Fitting for Dog/Raccon 7000 Kg. |
| 24 | PG Clamp for Dog |
| 25 | E Bracket for 33 KV |
| 26 | 33 KV 3x300 sqmm Outdoor J/K |
| 27 | G.I. Pipe 6\" dia |
| 28 | HDPE Pipe 6\" Dia |
| 29 | Clamp for Fixing of Cable & Cable Box |
| 30 | Clamp for Holding of G.I. Pipe |
| 31 | Erection,installation and commissioning of Single pole 33 KV overhead line by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate. |
| 32 | Erection of Single pole structure of 13 Mtrs. Long ST Pole with all accessories and painting etc. |
| 33 | CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC. |
| 34 | EARTHING COMPLETE by MS Earth rod 6 SWG Earth wire. Work includes all material and labour required for proper completion of work. |
| 35 | Centralized and decentralized materials to be used in above work mentioned below :- |
| 36 | ST Pole 13 Mtrs Long |
| 37 | Stone Pad |
| 38 | Cross Arm V Type 33 KV |
| 39 | F Bracket for 33 KV |
| 40 | Cross Arm Holding Clamp |
| 41 | 33 KV Pin Insulator |
| 42 | 33 KV Pin with Nut |
| 43 | Barbed Wire |
| 44 | All. Binding Wire |
| 45 | Number Plate with Clamp & N/B |
| 46 | Danger Board with Clamp |
| 47 | Nut Bolt with Washer |
| 48 | Armour Rod with Farular |
| 49 | All. Paint |
| 50 | Red Oxide Paint |
| 51 | Earth Wire Clamp with N&B |
| 52 | Cross Arm Holding Angle with Clamp with Nut & Bolts for ST Pole 65x65x6 mm 1600 mm |
| 53 | Erection,installation and commissioning of Double pole structure for overhead line by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate. |
| 54 | Erection of Double pole structure of 13 Mtrs. Long ST Pole with all accessories and painting etc. |
| 55 | CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC. |
| 56 | EARTHING COMPLETE by MS Earth rod 6 SWG Earth wire. Work includes all material and labour required for proper completion of work. |
| 57 | Erection of Stay Complete with Grouting. Work includes all material and labour required for proper completion of work. |
| 58 | Centralized and decentralized materials to be used in above work mentioned below :- |
| 59 | ST Pole 13 Mtrs Long |
| 60 | Stone Pad |
| 61 | 33 KV MS Top Channel 125x65x3200 mm with 2 Clamps |
| 62 | 33 KV MS Dropper Channel 100x50x3000 mm with 2 clamps |
| 63 | MS Cross Bracing Angle 65x65x6x4300 mm with 02 no. Bracing and 4 Clamps |
| 64 | 33 KV Disc Insulator B&S Type 7000 Kg. |
| 65 | 33 KV Disc Fitting for Dog/Raccon 7000 Kg. |
| 66 | 33 KV Pin Insulator |
| 67 | 33 KV Pin with Nut |
| 68 | PG Clamp for Dog |
| 69 | E Bracket for 33 KV |
| 70 | Barbed Wire |
| 71 | All. Binding Wire |
| 72 | Number Plate with Clamp & N/B |
| 73 | Danger Board with Clamp |
| 74 | Nut Bolt with Washer |
| 75 | All. Paint |
| 76 | Red Oxide Paint |
| 77 | Earth Wire Clamp with N&B |
| 78 | Erection,installation, Laying and commissioning of 33 KV Cable for Underground line by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate. |
| 79 | Complete Laying and commissioning of 33 KV 3x300 sqmm XLPE Cable in HDPE Pipe by HDD method. Work includes making of loops, connection with double pole etc. |
| 80 | Inatallation of 33 KV 3x300 sqmm Outdoor J/K |
| 81 | Centralized and decentralized materials to be used in above work mentioned below :- |
| 82 | 33 KV 3x300 sqmm XLPE Cable |
| 83 | 33 KV 3x300 sqmm Outdoor J/K |
| 84 | G.I. Pipe 6\" dia |
| 85 | HDPE Pipe 6\" Dia |
| 86 | Clamp for Fixing of Cable & Cable Box |
| 87 | Clamp for Holding of G.I. Pipe |