Tender For Hpsebl/Edhmr/E/2024-25/132 Providing New 11/0.4 Kv, 63 Kva Substation At Swahal A/W Ht And Lt Line In Es Kale Amb Uesd Hpsebl, Tauni Devi. T.S. No. 166/2023-24 (W.B.S. 32100257-001-Hmr-S/S-113 New Wbs 2100257-001-Hmr-S/S-169). - 1 63KVA, 11/0.4KV SUB-STATION Muffs (2000 mm) with concerete filling 2 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incommer line 3 MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 4 X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch 5 Transformer Bed, Belting & Knee Bracing X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed 6 X-Arm [Channel Iron (100x50x6 mm), Length : 460mm x 2 Nos for supporting Main Channel of Transformer] 7 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 8 MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos 9 MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing 10 Transformer LT Distribution Box and GO Switch fixing Assembly MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 11 MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 12 GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm 13 Prov. GO switch 14 D.O Fuse Unit 15 Surge Arrester, 9 kV Station Class(Porcelain Type) 16 Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) 17 Stay set complete 18 Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) 19 Prov. Pipe Earthing Set 20 6 SWG GI wire For Earthing 21 LTDistribution panel box with MCCB. For 63 KVA 22 Prov. Half Clamp (M.S. Flat 50X6 mm) 23 Prov. Full Clamps (M.S. Flat 50X6 mm) 24 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 25 Prov. Aluminium Thimble 26 Prov. Copper Thimble 200 Amp 27 Prov. Danger Plate 28 Prov. Barbed Wire 29 Prov. LT Cable (3.5 Core) 120 mm² , PVC (1.1KV,3½Core, Aluminium, Unarmoured) . 30 Prov.LT Energy Meter (3-ɸ, 4 wire CToperated Static Tri-Vector meter ) (CT-200/5 A)for 63 KVA T/F 31 a) Prov. Aluminium Paint. 32 b) Prov. Red oxide 33 LT Switched Capacitors 9- KVAr for 63 KVA (rate per 27KVAr) 34 Chain Link fencing , Angle Iron ,Gate etc for transformer fencing 35 HT LineAAAC (50mm²) conductor{Includes 6 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage} 36 RCC Muff 2000mm Long withconcrete filling material 37 MS Channel Iron X-Arm:[Size (100*50*6)mm, Length : 2800 mm 38 MS Angle Iron: 50x50x6, Length : [(750) mm 39 Half clamps made of MS Flat size 50x6mm for X-Bracing Set (4Nos per Set) . 40 Discs insulator sets (comprising 1 No. Disc: (Polymeric Disc Insulator BS, 12 kV, 90 kN, CD- 320mm) including Ball Cleave, Bend Stapple, Dead End Clamps etc.) 41 11 kV Pin Insulators (Polymeric 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure) 42 Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). 43 HT Earthing Set complete in all respect. 44 Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)}including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] at road crossings {0.102 kg/m} 45 Danger Plate (250X200X1.6 mm) 46 M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)] 47 Barbed Wire 48 Aluminium Paint 49 LT Line AAAC 7/3.15mm (50mm²) conductor{Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage} . 50 RCC Muff 2000 mm long with concrete filling material 51 Angle Iron (50x50x6 mm), Length: 950 mm 52 Shackle Insulator (16 kN) 53 D-Iron (U- Clamps)made of MS Flat 50x6mm. 54 LT Stay Set Complete i/c Egg Insulator, Guy Assembly and Helicallyfittings) 55 Stay wire 7/3.15 mm (6.00 kg. per stay set) 56 Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). 57 Half Clamp made of MS Flat 50x6mm 58 Egg Insulator 59 LT Earthing Set complete in all respect 60 Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengthsand Additional 1% (Sag and wastage)}{0.102 kg/m} 61 Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)] 62 Aluminium Paint 63 LT Cable 3*50+35+35 mm2 64 Erection of S/Stn.Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing ofGO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc.,Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets, Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect. 65 HT Line ERECTION PART Erection of Single Pole Run through Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paintetc.Complete in all respect. 66 Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. 67 Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same andprov. earthing connectioncomplete in all respect. 68 Laying of Conductor, Stringing, Sagging ofACSR, 80/100mm² /6/1/4.72mm² and binding with Insulators (3 wires) and fixing of jumper. 69 Laying ofEarth wire with GI Wire 8SWG , Stringing, Sagging ofand binding with Insulators. 70 Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set). 71 Erection of LT Line Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paintetc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL. 72 Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. 73 Erection of LT Earthing as per latest standard practices /specification of REC / HPSEBL including digging of pit fixing of LT Earth Set, refilling the same andprov. earthing connectioncompletein all respect. 74 Laying of Conductor, Stringing, Sagging ofAAAC, 50mm² and binding with Insulators (3 wires) and fixing of jumper. 75 Laying ofEarth wire with GI Wire 8SWG , Stringing, Sagging ofand binding with Insulators. 76 Laying ofLT cable andStringing, Sagging ofand binding with Poles /Insulators. 77 Add charges for loading material at central store & unloading at site of work including manual carriage, route clearance for complete job. 78 Add Testing & Commissioning Charges DTR HT LT 79 Labour cess @1% on (Material Cost +Erection + Transportation+ GST + Testing & Commisioning Charges) etc.