Tender For The Misc. Works Of Repair/Rectification, Fab., Erect.And Strength. Of Auxiliaries Of Chd-Ii Along With Data Entry, Typing Etc. Of Btps Committee Room, Obra. miscellaneous works of repair/rectification, fabrication, erection and strengthening of Trolley Track Channel & foundation stool of conveyor pulleys, platforms of Stackers/Reclaimers, gravity take up channel, Erection of Take-up boxes, Trippers and others auxiliaries, rollers stool and pits of Wagon Tippler of CHP, BTPS, Obra along with data entry, typing etc. of BTPS committee room, Obra Sl. No. Item Description 1 The work of Dismantling, Fabrication and Erection of trolley track channel of Conveyor 16 and strengthening of foundation stool of Pulley of Conveyor 16, K-10, Platform of Old/New Stacker/Reclaimer and gravity take-up channel of K-10 of CHP, BTPS 2 Dismantling of tension trolley track and base channel of Conv. 16. 3 Strengthening/fabrication works of tension trolley track and base channel of Conv. 16.(01 Job = 10000 mm x 150mm x 7mm) 4 Erection of tension trolley track channel of Conv. 16. (01 Job = 10000mm x 150mm x 7 mm) 5 Repairing/Strengthening of foundation stool of pulley of Conv. 16 & K-10. 6 Repairing/Strengthening of damaged platform of old/new S/R. 7 Repairing/Strengthening of gravity take-up channel of Conv. K-10 & 17. 8 Repairing/Fabrication/Replacement/Erection of Take-up boxes, Trippers and other auxiliaries of Conveyor system of CHP, BTPS, Obra 9 Fabrication & Erection of take-up Boxes of conveyor system 10 Repairing & Strengthening of damaged/bent rail line structure ofTripper 11 Replacement of damaged channel of Tripper frame 12 Replacement of damaged guide channel for gravity take-up box of conveyor system 13 Replacement of damaged tie bar ( angle & channel both) of Conv./ Rail line structure for Tripper. 14 Replacement of damaged tripper rail line with base channel and vertical support ( 01 Job= worn of 10m length of rail) 15 Replacement of Low Speed/geared coupling of Conveyor system 16 The work of Strengthening, Fabrication, Dismantling and Erection of drive end stool foundations, roller slide stools and pit platforms of Wagon Tippler No. 1 of CHP, BTPS. 17 Fabrication work of Non drive end stool of Wagon tippler. 18 Fabrication work of roller slide stool of Wagon tippler. 19 Fabrication work of Wagon tippler pit platform. 20 Dismantling work of Non drive end stool foundation of Wagon Tippler. 21 Dismantling work of roller slide stool of Wagon Tippler. 22 Dismantling work of Wagon Tippler pit platform 23 Erection work of Non drive end stool of Wagon tippler. 24 Erection work of roller slide stool of Wagon Tippler. 25 Erection work of Wagon Tippler pit platform. 26 The work of Data Entry, Typing, Printing, Report preparation etc., in BTPS committee room, Obra. 27 The work of Data Entry, Typing, Printing, Report preparation etc., in BTPS committee room, Obra.Providing of one set computer system with printer and other peripherals Hardware and software etc. (One Job means The work of Data Entry, Typing, Printing, Report preparation etc.(One Job means The work of Data Entry, Typing, Printing, Report preparation etc., for one Month)