}

Tender For Operation And Maintenance Of Package Acs, Window Acs And Split Acs At Cauvery Basin Refinery, Cbr Township, Muttam Terminal And Muttam Township For Cpcls Cbr Project In Nagapattinam, nagapattinam-Tamil Nadu

Boards / Undertakings / PSU has published Tender For Operation And Maintenance Of Package Acs, Window Acs And Split Acs At Cauvery Basin Refinery, Cbr Township, Muttam Terminal And Muttam Township For Cpcls Cbr Project In Nagapattinam. Submission Date for this Tender is 24-01-2025. Air Conditioner Tenders in nagapattinam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

47279852
Tender For Operation And Maintenance Of Package Acs, Window Acs And Split Acs At Cauvery Basin Refinery, Cbr Township, Muttam Terminal And Muttam Township For Cpcls Cbr Project In Nagapattinam
Open Tender
Indian
Tamil Nadu
Nagapattinam
24-01-2025

Tender Documents

Tender Details

Operation And Maintenance Of Package Acs, Window Acs And Split Acs At Cauvery Basin Refinery, Cbr Township, Muttam Terminal And Muttam Township For Cpcls Cbr Project In Nagapattinam , Operation And Maintenance Of Package Plant Air-Conditioning Units Operation And Maintenance Of Package Air-Conditioning Units At Administration Building (4 * 22 Tr) And Om&S Control Room (3 * 7.5 Tr) As Per Scope Of Work. The Amc Will Include Replacement Of Any/All Part(S) If Found Defective During The Amc Period. I.E., The Amc Is Comprehensive In Nature. Manpower Shall Be Deployed As Below : One (01) Operator In Morning (06:00 A.M. To 02:00 P.M.) & Evening Shift (02:00 P.M. To 10:00 P.M.) With One Reliever. Reliever Will Come In General Shift On Four Days And On Balance Two Days, He Will Relive Shift Operators On Their Off Day. One (01) Supervisor Cum Technician In General Shift (8.30 A.M. To 05:00 P.M.). Maintenance Of Window & Split Air-Conditioner Up To 2.0 Ton In Cpcl-Cbr, Nagapattinam : This Job Will Be Executed Through O&M Manpower And No Additional Manpower Required. List Of Installedwindow, Split Air Conditioners Is Attached. Details Of Maintenance Is Given Below:- Routine, Regular And Breakdown Maintenance Of Window Ac, Split Ac Of Different Make & Different Capacities. Installed At Various Location Of Within The Refinery Premises, Refinery Township And Iocl Muttam. Job Includes Attending The Complaints Of Machines As Per The Complaint Register And Instruction Of Site Engineer. Job Includes Checking Of Machines, Identification Of Defect, Repair/Replacement Of Defective Component. Replacement Of Thermostat, Blower, Fan Blade, Electrical Switches, Control Knob,Wires. Cleaning Of Air Filter, Removal Of Dust From Cooling Coil & Condenser By Removing The Machine From Location, If Required. Repair/ Replacement Of Defective Bush/Bearing Of Blower Motor Including Lubrication Of Blower Motor, Tightening Of All The Electrical Connection.Materials Required For Routine Maintenance Of Window And Split Air Conditioners Is In Scope Of Owner. Routine Service Of Installed Window, Split Air Conditioners To Be Carried Out Once In Three (03) Months. , Overhauling Of Window Ac, Split Ac Of Different Make & Different Capacities Located At Various Location : Job Includes Removal Of Machines From Location, Dismantling, Cleaning, Washing By Jacketing Of Indoor Unit, Chemical Cleaning Of Condenser & Cooling Coil, Overhauling, Lubrication Of Blower Motor. Cleaning Of Coil & Condenser To Be Done With Wire Brush. Defective/Damage Insulation To Be Replaced. All The Electrical Wires Must Be Dressed Properly. Cleaning/Replacement Of Filter By Nylon Filter. Re-Assembly Of Machine, Shifting To Location & Testing Of Machine. Job Complete In All Respect Defective Compressor Either At Site Or At Workshop After Transportation Of Machine To Workshop. Materials Required For Overhauling Of Window And Split Air Conditioners Is In Scope Of Owner. Overhauling Of Installed Window, Split Air Conditioners To Be Carried Out Once In A Year. , Operation And Maintenance , Supply And Fixing Of Plywood Sheet In Window Ac Opening Supply Of Plywood Sheet 4Mm Thick, Cutting To Required Size For Covering The Wac Opening Ofdifferent Make And Fixing With Nails. Job To Be Done Withmanpower & Material And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Supply, Fixing, Gas Charging, Testing And Commissioning Of Following Condenser Coils Suitable For Different Make & Different Capacity Window Air Conditioner. Job Includes Dismantling Of Old Damaged Condenser Coil, Supply & Fixing New Condenser Coil, Gas Charging, Testing & Commissioning. Job To Be Done With Manpower & Material Including Refrigerant Gas And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. Note : Old Damaged Condenser Coil Shall Be Retained By The Department. , Supply, Fixing, Gas Charging, Testing And Commissioning Of Following Coolingcoils Suitable For Different Make & Different Capacity Window Air Conditioner. Job Includes Dismantling Of Old Damaged Cooling Coil, Supply & Fixing New Cooling Coil, Gas Charging, Testing & Commissioning. Job To Be Done With Manpower & Material Including Refrigerant Gas And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge.Note: Old Damaged Cooling Coil Shall Be Retained By The Department. , Front Grill For Window Ac Supply & Fixing Of Pvc Make Front Grill Suitable For Window Airconditioner (Voltas/ Carriers/ Bluestar/ Fedderslloyds/ Usha, Etc.).Job To Be Done With Manpower & Material And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Gi Overflow / Waste Water Pipe Supply, Fixing, Cutting, Threading Of Gi Pipe Of Following Dia Including Bend, Elbow, Union, For Fixing In Window And Split Acs. Job To Be Done With Manpower & Material And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , 15 Mm Dia. Nominal Bore , 20 Mm Dia. Nominal Bore , 25 Mm Dia. Nominal Bore , Servicing Of Pcb Board For Window And Split Air Conditioner (1.5 Tr /2.0 Tr).Job To Be Done With Manpower & Material And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Supply And Replacement Of Rotary Compressor For 1.5 Tr Window/ Split Air Conditioner. Job To Be Done With Manpower & Material And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Supply And Replacement Of Rotary Compressor For 2.0 Trwindow/ Split Air Conditioner. Job To Be Done With Manpower & Material And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Leak Arresting And Gas Charging Of 1.5 Tr Window Air Conditioner. Job To Be Done With Manpower & Material Including Refrigerant Gas And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Leak Arresting And Gas Charging Of 1.5/2 Tr Split Air Conditioner. Job To Be Done With Manpower & Material Including Refrigerant Gas And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge. , Shifting Of Split Air Conditioner From One Location To Other Location (Dismantling, Installation And Commissioning Including All Acessories Like Copper Pipe, Insulation Foam, Etc.). Job To Be Done With Manpower & Material Including And As Per Direction & Instruction Of The Site Engineer / Engineer-In-Charge.

Key Value

Document Fees
Refer document
EMD
INR 17000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail