}

Tender For Deposit Work In The Area Of Edsd-Raya Under Edd-Laxminagar, Mathura - Carriage Of 8.5/9 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The R, mathura-Uttar Pradesh

Government Departments has published Tender For Deposit Work In The Area Of Edsd-Raya Under Edd-Laxminagar, Mathura - Carriage Of 8.5/9 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The R. Submission Date for this Tender is 24-01-2025. Electric Pole Tenders in mathura Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47273413
Tender For Deposit Work In The Area Of Edsd-Raya Under Edd-Laxminagar, Mathura - Carriage Of 8.5/9 Mtr Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The R
Open Tender
Indian
Uttar Pradesh
Mathura
24-01-2025

Tender Documents

Tender Details

Deposit Work In The Area Of Edsd-Raya Under Edd-Laxminagar, Mathura - Carriage of 8.5/9 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 2 Carriage of 11/13 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 3 Carriage of 10/16 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends 4 Carriage of 25/63 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends 5 Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cableincluding loading & unloading at both ends. 6 Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cableincluding loading & unloading at both ends. 7 Carriage of Line material i.e. conductor, G.I. wire, TPMO, stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. 8 Erection of single pole structure 8.5/9 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 9 Erection of single pole structure 11/13 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 10 Erection of Double pole structure 8.5/9 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 11 Erection of Double pole structure 11/13 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. 12 Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. 13 Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. 14 Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. 15 Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. 16 Laying, sagging stringing and binding of Arial Bunch Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. 17 Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual. 18 Laying of 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/HDPE pipe by making trench/diggingand re-dressing of trench after laying of XLPE Cablefor proper completion of work as per direction of supervising engineer. 19 Laying of overhead 11 KV XLPE 3x70 mm2/3x120 mm2 as per direction of supervising engineer. 20 Laying of overhead 11 KV XLPE 3x185 mm2/3x300 mm2 as per direction of supervising engineer. 21 Laying of 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/HDPE pipe by making trench/digging and re-dressing of trench after laying of XLPE Cablefor proper completion of work as per direction of supervising engineer. 22 Filing of cable box as suitable size as per direction of supervising engineer. 23 filing of Straight through as suitable size as per direction of supervising engineer. 24 Chopping of Tree branches to Clear the route properly. 25 Mounting of 10/16 KVA Transformer on the Double pole/Plinth structures and connections thereof. 26 Mounting of 25/63 KVA Transformer on the Double pole/Plinth structures and connections thereof. 27 Cutting of CC Road for making depth foundation for erection of pole. 28 Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.) 29 Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms. 30 Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. 31 Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion. 32 Fixing of Distribution Box on erected PCC Pole.

Key Value

Document Fees
INR 590 /-
EMD
INR 5000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail