| 1 | Taking down carefully unserviceable Ceiling Fan of any size from its position, dismantling blade, opening the fan motor, removing the burnt grease, applying new bearing grease, removing of defective parts such as ball bearing, bush bearing, burnt winding, shaft, split pin, condenser, condenser holder, shackle etc. reassembling after replacement of defective parts including replacement of 3 core 0.75 Sqmm flexible copper cable from ceiling rose to connector, hanging in its position properly complete all as specified and directed.Note:- Replacement of unserviceable spare parts shall be measured and paid separately under respective items of this schedule here-in-after as supply only. |
| 2 | Description all as per Sl item No 1 but for exhaust fan of any size |
| 3 | Description all as per Sl item No 1 butPedestal fan of any size. |
| 4 | Supply only ball bearing of existing size suitable for ceiling fan, exhaust fan, fresh air fan, pedestal fanas that of existing defective one complete all as specified and directed.(Make : Tata/SKF) |
| 5 | Supply only bush bearing of existing size suitable for ceiling fan, exhaust fan, fresh air fan and pedestal fan ofcomplete all as specified and directed. |
| 6 | Supply only condenser 2.5 MFD complete all as specified and directed.(Make : Usha/Keltran/uptran) |
| 7 | Supply only condenser 4 MFD complete all as specified and directed.(Make : usha/Keltran/uptran) |
| 8 | Material and labour for cleaning and preparing the surfaces of ceiling fan, removing the grease, carbon dust over the fans and painting with one coat of synthetic enamel paint of approved colour with brush painting and writing MES number on the fan complete all as specified and directed. |
| 9 | Material and labour for cleaning and preparing the surfaces ofexhaust fan removing the grease, carbon dust over the fans and painting with one coat of synthetic enamel paint of approved colour with brush painting and writing MES number on the fan complete all as specified and directed. |
| 10 | Rewinding the stator complete with super enamelled bare copper conductor with the existing size/gaugeand number of turns as that of the old one, insulating, varnishing and pre heating for ceiling fan 1200mm/1400mm sweep complete all as specified and directed. |
| 11 | Description all as per Sl No 10 .00 here in before but Exhaust fan upto 300mm sweep. |
| 12 | Description all as per Sl No 10 .00 here in before but Exhaust fan above 300mm upto 450mm sweep. |
| 13 | Description all as per Sl No 10 .00 here in before butPedestal fan fan upto 300mm sweep. |
| 14 | Removing the damaged and corroded exhaust fan louvers and replace with new louvers of size up to 300mm sweep complete all as specified and directed. |
| 15 | Removing the damaged and corroded exhaust fan louvers and replace with new louvers of size above 300mm and up to 450mm complete all as specified and directed. |
| 16 | Removing the damaged and corroded exhaust fanblades and replace with new blades of size up to 300mm sweep complete all as specified and directed. |
| 17 | Removing the damaged and corroded exhaust fan blades and replace with new blades of size above 300mm and up to 450mm complete all as specified and directed. |
| 18 | Taking down defective storage water heater of any capacity from buildings after disconnecting carefully water and electric connection, opening the bottom cover replacing the defective parts fixing the cover and refixing in original position reconnecting both water and electric connection and testing complete all as specified and directed.Notes :- Replacement ofspareswill be measured and paid for separately under respective items of the schedule here-in-after as supply only. |
| 19 | Supply only new heating element of capacity 1.5KW with rubber gasket complete all as specified and directed. |
| 20 | Supply onlynew heating element of capacity 2 KW with rubber gasket complete all as specified and directed. |
| 21 | Supply only thermostat suitable for storage type water heater complete all as specified and directed. |
| 22 | Supply only 3 core 2.5 Sqmm copper conductor cable suitable for geysers of any size complete all as specified and directed.(Make : Finolex/Anchor/Plaza) |
| 23 | Supply only Non return valve 15mm dia suitable for geyser complete all as specified and directed. |
| 24 | Supply and fix Metal socket single pole and neutral with two pin and earth socket complete with one single pole MCB 25 Amps complete all as specified and directed.(Make : L&T/Legrand/ ABB/ Siemens/ Schneider/ Havells) |
| 25 | Supply and fix 3 pin plug top suitable for metal socket of capacity 25 Amps complete all as specified and directed.(Make : Standard/Havells/Anchor) |
| 26 | Material and labour preparing external surfaces of water heater, cleaning and painting with one coat of synthetic enamel paint of white colour of approved make with brush and writing MES No. complete all as specified and directed. |
| 27 | Supply onlyApparatus plate assembly suitable to fix thermostate, heating elements as ofgeyser and nuts etc complete all as specified and directed. |
| 28 | Supply only Flexible Pipe hot & cold |
| 29 | Removing thetank from the geyser, brazing to arrest the leakage, reassembling and refixing complete all as specified and directed. |
| 30 | Supply only Bottom inspection chamber cover suitable for 25 Ltrs capacity geyser of any make/model complete all as specified and directed. |
| 31 | Supply only Indication lamp suitable for geyser in round/rectangular shape complete all as specified and directed. |
| 32 | Supply and replace 3 pin plug 15 Amps capacity complete all as specified and directed.(Make : Anchor/Plaza) |
| 33 | Supply onlygeyser tankof capacity 15 Ltrs made out of stainless steel complete all as specified and directed. |
| 34 | Supply onlygeyser tank of capacity 25 Ltrs made out of stainless steelcomplete all as specified and directed. |
| 35 | M&L for testing of old earthing using calibrated earth tester & submitting result to engr -in -charge. Earthing which showing much more results as specified in IS rule and disconnetivity should be replaced with new earthing items are considered as below all as directed.Note : (i) Watering of earthing with 2 Buckets (30Ltrs) water mixed with salt (total 5 Kg) shall be carried outone day before the testing & the cost of the same shall deemed included in unit rate quoted. |
| 36 | Dismantling/taking down old existing unsv lightening conductors & material & labour/fixing for lightening conductor assembly made out of GI pipeMedium grade of size 40 mm bore along with welded flange at one end & GI reducersocket to connect epoxy insulators of suitable size of air termination & connector for earth strip duly fixed with necessary nuts bolts & washers in PCC 1:2:4 type B0 30cm x 30cm x30cm complete all as directed.Note : GI pipe 40mm & air temination shall be measured & paid separately under relevant items |
| 37 | Supply only GI pipe medium grade of size 40 mm borewith all fitting for erection of lightening conductor complete as required and directed. |
| 38 | Supply & Fixing air termination Aluminium rod 12mm dia, 300 mm long for lightening conductor with epoxy insulators of suitable size of air termination complete all as directed. |
| 39 | Supply & Fixing air termination copper rod 12mm dia, 300 mm long for lightening conductor with epoxy insulators of suitable size of air termination complete all as directed. |
| 40 | M&L for Test point terminal block made of gun metal or phosphorus bronze size 75x75x25mm, drilled and screwed including, 3 NOS, 8mm dia 25mm long hex, head screw all as directed. |
| 41 | Dismantling of existing aluminium earthing/lightening conductor strip from wall/roof of bldg & refixing on porcelain insulators after grouting insulators on wall/roof with neccesory fixing arrangement (nuts, bolts & PCC work) all as directed. |
| 42 | M&L for painting on wall with synthetic enameledpaint of black colour of 200 x 150 mm size and writing work for earth test result with date & year all as specified and directed at site. |
| 43 | M & L for New earthing complete with Copper plate earth electrode 600X600X3.15mm thick buried directly in ground (earth pit not less than 2.25 meter below ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to 20x3mm copper strip at two points by means of bolts and nut, check nut and washers including charcoal dust, common salt, necessary excavation in hard/dense soil, returning filling in and removal of surplus soilto a distance up to 50metres, PCC pit in 1:3:6 type CI (using 20mm grade stone aggregate) RCC 1:2:4 type B-1 (using 20mm grade stone aggregate ) 50mm thick pit cover, reinforced with 8mm dia TMTbars 75mm c/c, both ways MS handle 12mm dia, GI funnel, wire mesh and GI watering pipe of 20mm bore GI (light grade) and earth leadprotection pipe 40mm bore (light grade) all as specified, directed and shown in electrical plate No 3 of SSR Part-I including testing complete. Note : Copper strip and protection pipes 40 mm GI light grade up to 7.5 metre is included in unit rate and beyond that the same will be measured separately. |
| 44 | M & L for New earthing complete with galvanised steel plate earth electrode 600X600X6mm thick buried directly in ground (earth pit not less than 2.25 meter below ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to GI strip 25X4mm at two points by means of bolts and nut, check nut and washers including charcoal dust, common salt, necessary excavation in hard/dense soil, returning filling in and removal of surplus soilto a distance up to 50metres, PCC pit in 1:3:6 type CI (using 20mm grade stone aggregate) RCC 1:2:4 type B-1 (using 20mm grade stone aggregate ) 50mm thick pit cover, reinforced with 8mm dia TMTbars 75mm c/c, both ways MS handle 12mm dia, GI funnel, wire mesh and GI watering pipe of 20mm bore GI (light grade) and earth leadprotection pipe 40mm bore (light grade) all as specified, directed and shown in electrical plate No 3 of SSR Part-I including testing complete. Note : GI strip and protection pipes 40 mm GI light grade up to 7.5 metre is included in unit rate and beyond that the same will be measured separately. |
| 45 | M & L for New earthing complete with galvanised steel plate earth electrode 600X600X6mm thick buried directly in ground (earth pit not less than 2.25 meter below ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to GI wire 4mm at two points by means of bolts and nut, check nut and washers including charcoal dust, common salt, necessary excavation in hard/dense soil, returning filling in and removal of surplus soilto a distance up to 50metres, PCC pit in 1:3:6 type CI (using 20mm grade stone aggregate) RCC 1:2:4 type B-1 (using 20mm grade stone aggregate ) 50mm thick pit cover, reinforced with 8mm dia TMTbars 75mm c/c, both ways MS handle 12mm dia, GI funnel, wire mesh and GI watering pipe of 20mm bore GI (light grade) and earth leadprotection pipe 20mm bore (light grade) all as specified, directed and shown in electrical plate No 3 of SSR Part-I including testing complete. Note : GI strip and protection pipes 20 mm GI light grade up to 7.5 metre is included in unit rate and beyond that the same will be measured separately. |
| 46 | Supply & fixing for Copper strip 20x3 mmon wall/batten or recessed or buried in ground all as directed |
| 47 | Supply & fixing for aluminium strip 25x3mm on wall/batten or recessed or buried in ground all as directed |
| 48 | Supply & fixing for GI strip 25x4 mmon wall/batten or recessed or buried in ground all as directed |
| 49 | Supply & fixing for GI wire 4mmon wall/batten or recessed or buried in ground all as directed |
| 50 | Dismantling/taking down old unsv GI pipe from wall/roof of bldg /Trench & Supply and fixing of GI pipe mediam grade of size 15 mm bore for laying in trenches/floors or walls including allfittings for fixing complete as required and directed. |
| 51 | Supply and fixing High density polyethylene pipes (HDPE) of pressure rating 6 kgf/cm2 laid in trenches of size 40 mm borefor erection of lightening conductor and protection for earth strips ete and including short lengths, with all pipe fittings such as ends, elbows, unions, tees, reducing tees, adopters, sockets, plugs, hose clips etc. and fixing to walls etc. complete with saddles (snap clips), wall clips, hooks, protective mild steel tube sleeves and cutting through walls, floors and their making good or laying in trenches and also cutting, screwing and waste complete as required and directed. |
| 52 | Supply and fixing High density polyethylene pipes (HDPE) of pressure rating 6 kgf/cm2 laid in trenches of size 15 mm borefor erection of lightening conductor and protection for earth strips ete and including short lengths, with all pipe fittings such as ends, elbows, unions, tees, reducing tees, adopters, sockets, plugs, hose clips etc. and fixing to walls etc. complete with saddles (snap clips), wall clips, hooks, protective mild steel tube sleeves and cutting through walls, floors and their making good or laying in trenches and also cutting, screwing and waste complete as required and directed. |
| 53 | Dismantling/taking down old unsv GI / Al strip any size and Supply & Fixing FRLS single core cable 10 Sq mm LA to Earth test point complete as required and directed. |
| 54 | Supply and fixing PVC tape of 15 mm bore complete as required and directed. |
| 55 | Dismantling/Taking down and Supply, Installation, Testing and Commissioning of LED aviation light comprising of aluminium housing with polycarbonate enclosure, 302 nos. LED are provided AC Circuit, 230 volts with all components and fixing arragements on pipe necessary flat iron clamps, nuts, bolts & washers etc including necessary wiring circuit all as specified and as directed. Make Bajaj cat No 110731 BGAV 302 LED or equvalant |
| 56 | Dismantling/Taking down and Supply and fix 2 core 2.5 sqmm PVC insulated PVC sheathed weather proof multistranded Copper conductor cable 1100 volts grade including GI conduit on pole,wall etc with MS clamps all as specified and directed. |