}

Tender For Increasing Capacity Of 33/11 Kv Substation Shakti Chauraha From 2X10 Mva To 2X10+1X5 Mva And Other Associated Works” Sl. No. Item Description 1 Dragging, Loading, Carriage And Unloading Of Following Store Materials With Proper Stacking Fr, Lucknow-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Increasing Capacity Of 33/11 Kv Substation Shakti Chauraha From 2X10 Mva To 2X10+1X5 Mva And Other Associated Works” Sl. No. Item Description 1 Dragging, Loading, Carriage And Unloading Of Following Store Materials With Proper Stacking Fr. Submission Date for this Tender is 24-01-2025. Substation Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47229811
Corrigendum : Tender For Increasing Capacity Of 33/11 Kv Substation Shakti Chauraha From 2X10 Mva To 2X10+1X5 Mva And Other Associated Works” Sl. No. Item Description 1 Dragging, Loading, Carriage And Unloading Of Following Store Materials With Proper Stacking Fr
Open Tender
Indian
Uttar Pradesh
Lucknow
24-01-2025

Tender Details

tender for Increasing capacity of 33/11 KV Substation Shakti Chauraha from 2X10 MVA to 2X10+1X5 MVA and other associated works” Sl. No. Item Description 1 Dragging, loading, carriage and unloading of following store materials with proper stacking from ESC Daliganj to JE dumps store and from JE dump store to work site within municipal area. 2 33 KV 3x300 sqmm XLPE Cable 3 33 KV 3x300 sqmm Jointing Kit O/D 4 33 KV VCB 800 Amp. 750 MVA 5 33 KV Control Pannel single circuit Transformer 6 33 KV Lightening Arrester 7 33 KVBus Isolator 8 33KVCurrent Transformer 200/100/1 9 11 KV Bus Coupler 10 11 KV Incoming VCB 600/300/5A, 350 MVA 11 11 KV Outgoing VCB 200/100/5A, 350 MVA 12 ACSR Panther Conductor for Bus Bar 13 11 KV 3x300mm2 XLPE Cable 14 11 KV3x300mm2Outdoor Termination Kit 15 11 KV3x300mm2Indoor Termination Kit 16 11 KV3x185mm2 XLPE Cable 17 11 KV3x185mm2Outdoor Termination Kit 18 11 KV3x185mm2Indoor Termination Kit 19 11 KV3x185mm2Straight though 20 Copper Control Cable 2x2.5 Sq. mm. 21 Copper Control Cable 4x2.5 Sq. mm. 22 Battery charger 24 Volt 23 Battery set 24 Volt 24 ST pole 11 mtr long 25 M.S.channel 100x50 sq mm 26 M.S.Angle 65x65x6 sq mm 27 11 kv pin insulator 28 M S Earthing Rod 20x2500 mm 29 11 kv pin with nut 30 1x240 LT XLPE Cable 31 MS Channel 125x65mm 3.5m long 4 Nos Pieces 14M@13.1 Kg. Mtr. With wastage 32 MS Angle 75x75x6, 2.6M 2 Nos Total 5.2@6.8 Kg./M with wastage 33 MS Round of 32 mm dia for laying of main earthmat in switch yard & for panel earthing bridge 550m@6.21 Kg./M 34 MS Round of 32mm dia for making MS earth electrode 32x3000mm. 78No.x3.0M@6.21 Kg./M 35 Earthing of substation Switchyard. 36 Earthing of substation Switchyard complete by round bar 32 mm dia exavation of earth for laying of earth mat 750mm deep and proper leveling after laying of earth mat Complete as per specification and connecation of all switchyard equipment by GI Flat 50x6 mm (The contractor shall arrange all the material except MS Round Bar 32 MM) 37 Cutting ,fabrication and driving of earth electrode of size 32x3000 mm 38 Cutting shaping, laying and welding of riser strip size 50x6mm G.I strip of size 50x6 mm in between earth mat and equipments /structure/body of T/F for earthing (two nos Riser for each structure equipment individually GI strip shall be provided contractor ) 39 Earthing of Indoor Equipment by making of 2 Nos. Quard of round bar 32 mm dia as per norms. 40 Fabrication & Erection of cable stand made of two nos MS channel 100x50x3 mtr. Long jointed to each other by means of 05 nos MS strip 50x6 mm of size 150 mm Long each by welding at equal distance interval as per norms and grouting in block of 300x300x700 completely providing two nos cable clamp also.(All materials will provide by contractor except MS channel). 41 Painting of all structures equipment. 42 Construction of Power T/F plinth suitable for 33/11KV 05 MVA power T/F of size 4x3x1.3 having 0.4 mtr height above ground level. The work includes excavation of foundation base concreting in cc ratio 1:6 Mas 12 1st class brick work in ratio 1:4 with coarse sand ,foundation cc in ratio 1:4:8using M.S bar of 12 mm dia for reinforcementthe work includes laying of 2 nos rail pieces 4 mtr long as per drawing/practice the plinth shall be finished in all respect. (only rail piece and M.S angle provided by the department) 43 Construction of masonry type plinth for 33KV VCB of size 1.6x1.6x1 M brick, sand, cement and stone grit including grouting of 4 Nos foundation Bolts for erection of 33KV VCB. 44 Fabrication & erection of 11 KV cable exposure type double pole with the provission ofcable with fixing of necesory clamps and other acessories like danger board,number plate,barbed wire,2 no. channels 100x50mm (1600mm each),1 no.MS channel 100x50mm(3200mm in length) for supporting the hoisting of cable & poles.its jumpering by single core PVC aluminium cable with proper size Al.lug after making three phase busbar with help of 11 KV pin,pin insulator and PVC cable. (all material arranged by contractor except steel,pole & insulator).as per RESPO norms. 45 Isolator Structure-Fabrication of Isolator structure minimum 3.5 mtr overall height and 2.5 mtr above ground level as per RESSPO drawing, with help of M.S channel 125x65 mm two pieces of M.S channel joined to each other by M.S flat 50x6 mm, diagonally at the interval of 0.5 mtr and top & bottom of the structure. Grouting of Isolator structure in CC (cement ,coarse sand and stone grit of 20 mm gauge) including supply of necessary T&P and painting os structure complete.(only M.S channel and angle provided by the deptt) 46 Lightning Arrestor/ CT structure : - Fabrication of lightning arrestor/CT structureas per RESSPO drawing with the help of 2 nos M.S channel 125x65 mm minimum 3.5 mtr long grouting 1 mtr deep from ground level in cc in ratio 1:4:8. complete in all respect. 47 Erection of structures, grouting, plinthing of ALL structuresequipment. 48 Mounting of accessories/equipment on fabricated structure complete work with making proper alignment and tightening the work includes fabrication work if required for proper operation of equipment . 49 33 KV VCB 50 CT 200/100/1-A 51 33 KV lightning Arrestors 52 Bus/Line Isolator 53 Fabrication & Erection of Neutral Stand structure with foundation 54 Erection, commissioning and Testing of 05 MVA T/F mounting of radiator conservator tank exposure vent etc. Filling of T/F oil in radiator conservator tank with complete work as per RESPO Norms. 55 Jumpering complete T/F bay with ACSR panther Cond. and required clamp with nut & Bolts from 33KV existing bus bar to T/F & other all required work. ( Except Panther Conductor all required material provided by Contractor.) 56 Jumpering complete Line bay with ACSR panther Cond. and required clamp with nut & Bolts from 33KV existing bus bar to cable stand & other all required work. ( Except Panther Conductor all required material provided by Contractor.) 57 Laying ofDouble circuit 11 KV 3x300 sq mm XLPE cable in normal soil/allready Constructed trench/As per Site Condition by digging of suitable size of trench as per site condition cable should be covered by bricks and sand with cleaning of Existing Trench. 58 Hoisting, jumpering, clamping of 11KV 3x300 sq mm XLPE cable on cable stand, panelwith proper taping with the help of empire tape. PVC tape and connectors. 59 Hoisting of 11KV3X185 sqmm XLPE cable on double pole with MS pipe/GI pipe of size 5/6 dia 3 M longincluding its jumpering complete with clamps, nuts and bolts(all material arranged by contractor). 60 Laying of Single circuit 11 KV 3x185 sq mm XLPE cable in normal soil/already Constructed trench/As per Site Condition by digging of suitable size of trench as per site condition cable should be covered by bricks and sand with cleaning of Existing Trench. 61 Hoisting, jumpering, clamping of 11KV 3x185 sq mm XLPE cable on 11 KV panelswith proper taping with the help of empire tape. PVC tape and connectors. 62 Construction of Control cable trench of size 150 mm wide 300 mm deep with brick work along with provision trench cover M.S strip at the interval of 0.30 M and M.S angle at both the edge of the trench. 63 Construction and fixing of trench cover0.5 M wide 0.75 mm thick with cement, coarse sand & stone grit in ratio 1:2:4 for covering of cable trench150 mm wide with provision of M.S Angle as per RESPO Norms 64 Laying of copper control cable of following sizes its proper dressing ,ferruling and connection with the system as per Site Condition with cleaning of Existing Trench.( except control cable all the material shall be provided by contractor) as per norms 65 Copper Control Cable 2x2.5 Sq. mm. 66 Copper Control Cable 4x2.5 Sq. mm. 67 Pipe boring type earthing minimum 20 mtr deepfrom ground level or upto water level with B class G.I. pipe 2 dia. Connection of equipment with earthing by GI strip 50x6 mm included in the job as per specification/norms for power transformer, VCB, CT/LA and other. (All materials will be Provided by contractor) 68 PG Clamp Panther 69 Dragging of following panels (Control and feeder pannel) from unloading place upto control room and placement erection and grouting, commissioning & testing of the same as per RESPO Norms 70 33 KV T/F Control panel 71 11 KVBus coupler, 350 MVA 72 11 KV Incoming VCB 600/300/5A 73 11 KV Out going VCB 200/100/5A 74 Supply of following auxiliary material 75 Rabber mat 2x1.5 Mtr. 76 Erection of 24 V batteries set with charger including stand (except 24 V batteries set with charger all the material & stand shall be provided by contractor) & initial charging complete set. 77 High Pressure Testing 78 Interloking Soling and gravels in switch yard as per Norms. 79 Supply and installation of fire extinguisher Co2 type 4.5 Kg at suitable place as per RESPO Norms 80 Provide bucket with bucket stand as per norms (3nos bucket for sand & 3 nos bucket for water in one set.) 81 Provided NOC from Electrical Safety department beforEnergization of 5 MVA Transformer. (The amount willl be reimbursed as per actual expenditure/receipt issued by concerned department upto maximim limit of Rs. 50000.00) 82 Return balance material to LESA store daliganj and other work in site area

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 21-01-2025 Date Extension 01 Date 24-01-2025

Key Value

Document Fees
INR 3540 /-
EMD
INR 30000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail