Boards / Undertakings / PSU has published A),,General A.1: Tag: 04-Tv-4001A A.2: Service: To Desuperheat Hp Steam B) Process Condition B.1: Process Fluid Inlet Condition B.1.1: Process Fluid To Be Desuperheated: Superheated Hp Steam B.1.2: Flow Rate (Tones/Hour):0.2 To 8 T/H (Depending On The Do. Submission Date for this Tender is 18-07-2013.General A.1: Tag: 04-Tv-4001A A.2: Service: To Desuperheat Hp Steam B) Process Condition B.1: Process Fluid Inlet Condition B.1.1: Process Fluid To Be Desuperheated: Superheated Hp Steam B.1.2: Flow Rate (Tones/Hour):0.2 To 8 T/H (Depending On The Down Stream Load). B.1.3: Pressure (Kg/Cm2g): Normal-41.0 B.1.4: Temperature (Degc): Normal-460.0 C.1: Coolant Inlet Conditions: C.1.1: Coolant: Boiler Feed Water (Bfw) C.1.2: Flow Rate (Kg/Hour): Maximum:-800. C.1.3: Pressure (Kg/Cm2g): Normal-53.5 C.1.4: Temperature (Degc): Normal-111.0; Design: 155.0 B.1: Process Outlet Condition B.1.1: Desuperheated Process Fluid: Hp Steam B.1.2: Flow Rate (Tones/Hour): 0.2 To 8 T/H (Depending On The Down Stream Load). B.1.3: Pressure (Kg/Cm2g): Normal-40.0 B.1.4: Temperature (Degc): Normal-250.0 C) Process Line Size/Rating And Line Class: 6/600#; D2d (Line No: 6 Sh 4032 D2d Ih) D) Coolant Line Size/Rating And Line Class: 1.5/600#; D2a (Line No: 1.5 Wb 4011 D2a Ih) E) Type Of Desuperheater Required: Ds Type-Ii E.1: With Integral Actuator: Yes E.2: Actuation: Pneumatic E.3: Air Supply Available: 3.5-5 Kg/Cm2g E.4: On Air Supply Fail: Close. E.4: Manual Handwheel: Yes F) Desuperheater Construction Material: F.1: Body: Astm A 217 Gr. Wc6 F.2: Seat: Stellite No. 6 F.3: Stem/Disc: Aisi Ss 410 (Chrome Plated) F.4: Spray Cylinder: Aisi Ss 410 F.5: Vortex Nozzle: Aisi Ss 416 F.6: Packing: Grafoil G) Connection On Process Line: Steam Flange 3-600# Rf Tenders in Assam. Bidders can get complete Tender details and download the document.
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail