Tender For Development Of Taluk Hospital Malayinkeezhu Mgps- 1 Medical Gas Pipeline System 2 MANIFOLD AND PLANT ROOM - OXYGEN SYSTEM Supply,testing and commissioning of Automatic Oxygen Control Panel with minimum flow rate of 1200 LPM,; Fully complying with ISO 10524- 2, ISO 7396-1:2007/HTM02-01 as per technical specifications. The cylinders shall not be included in the quoted price. 3 od324182/2023_2024Supply,testing and commissioning of Oxygen Manifold - 2 banks x8 cylinders, as per technical specifications. The cylinders shall not be included in the quoted price. 4 od324238/2023_2024Supply,testing and commissioning of Cylinder Emergency Oxygen Manifold - 1 Bank x4 Cylinders wih high flow regulator, The cylinders shall not be included in the quoted price. 5 od324254/2023_2024 NITROUS OXIDE SYSTEM: Supply,testing and commissioningof automaticN2O control panel complete set with inlet and outlet connectorsfor fully automatic control panel for both sides with brass hosing and suitable connectors. ½” BSP (M) thread. 6 od324255/2023_2024Supply,testing and commissioning of Nitrous Oxide Manifold - 2 banks x 2 cylinders.as per technical specifications. The cylinders shall not be included in the quoted price. 7 od324256/2023_2024Supply,testing and commissioning of Emergency N2O Out let with Convertion Kit (Convertion Kit 2nos) 8 od324342/2023_2024CARBON DIOXIDE SYSTEM Supply,testing and commissioning of semi automatic CO2 control panel complete set with inlet and outlet with brass housing and suitable connectors. ½” BSP (M) thread. 9 od324481/2023_2024Supply,testing and commissioning of Cylinder CO2 Manifold - 1cylinder x 2 bank with all accessories required as per specification 10 od326986/2023_2024Supply,testing and commissioning of Emergency CO2 Out let with Convertion Kit (Convertion Kit 2nos) 11 od324699/2023_2024MEDICAL AIR SYSTEM: Supply,testing and commissioning of Compressed air plant complete with - 2 compressors, each compressor should have minimum free air delivery of 750 LPM @8.5 bars, 1 air receiver tank of minimum 1000 ltr capacity, filtration and dryer system to ensure medical air quality as per HTM standards (each compressor module should include an inline filter with particle retention of 10 microns), NRV, pressure reducing station,automatic drain valves,pressure guages,ball valves, electrical control panel including circuit breakers, starters, pressure switches, timers, as per technical specifications. 12 od324893/2023_2024VACUUM PLANT: Supply,testing and commissioning of Vacuum plant complete with 1 vacuum pump and one as standby, each vacuum pump should have minimum free air aspirated of 1500 LPM betwen 570 mmHg and 720 mm Hg.min, vaccum receiver tank of minimum 2000 ltr capacity,bacteria double filter, valves,pressure guages,NRV, electrical control panel including circuit breakers, pressure switches, timers, ball valves etc as per technical specifications. 13 od324918/2023_2024Supply,testing and commissioning of Master Plant Alarm Panel ,Complies with HTM 02- 01/ISO 7396-1 Standards. Each Master Alarm should be modular in design and be fitted with required number of master alarm modules. The master alarms should be capable to monitor minimum 25 point. Each point represents an alarm condition that the source equipment might have. When an alarm condition exists, a red-light flashes and the audible alarm sounds. If several alarm conditions occur simultaneously, the most recent alarm light should flash, while the other alarm lights should remain lit. When an alarm condition is generated, an audible alarm should be actuated. A dry contact module should be available to interface with a building management system. The box material should be of gauge steel of requisite thickness and equipped with mounting brackets. The emissions from alarms should conform with EMC standards. Master alarm management system should be designed to display alarm conditions from the source supply units indicating the broad status of the source equipment and manifolds as well as the master distribution status from the source supplies. Depending on the alarm priority, a visual and audible alarm should be initiated to indicate an alarm condition. Each panel shall display and/or input of multi point alarms,including all necessary cabling between mater alarm and floor panels. The master alarm must be able to monitor the following source alarm conditions. as per technical specifications. 14 od324919/2023_2024Combined Electrical Control panel with wiring for Air compressor & vaccum Pump system as per technical specification. 15 od324931/2023_2024Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-12mm x 0.7 mm thick copper pipe. 16 od324932/2023_2024Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-15 mm x 0.9 mm thick copper pipe 17 od324933/2023_2024Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-22 mm x 0.9 mm thick Copper pipe 18 od324934/2023_2024Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-28 mm x 0.9 mm thick Copper pipe 19 od324935/2023_2024Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-35 mm x 1.2 mm thick Copper pipe 20 od324936/2023_2024Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-42 mm x 1.2 mm thick Copper pipe 21 od324992/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-O2 Outlets with Probes 22 od324993/2023_2024Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-N2O Outlets with Probes 23 od324994/2023_2024Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/HTM 02-01/DIN as per technical specifications- Air ( 4 bar) Outlets with Probes 24 od324995/2023_2024Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-Air (7 bar) Outlets with Probes 25 od324996/2023_2024Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-Vacuum Outlets with Probes 26 od324997/2023_2024Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications- CO2 Outlets with Probes 27 od324999/2023_2024Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-3 gas - 1 O2, 1M air, 1 Vac 28 Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-2gas - 1 O2, 1 Vac 29 Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-5 gas- 1O2,1 N2O, IM air , 1 s air, 1 vac 30 od325002/2023_2024Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-6 gas- 1O2,IM air,1 N2O, 1 s air, 1 vac 31 od325099/2023_2024Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specificattions - 15mm 32 od325100/2023_2024Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-22 mm 33 od325101/2023_2024Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-28mm 34 od325102/2023_2024Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-35 mm 35 od325103/2023_2024Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-42 mm 36 od325104/2023_2024Supply,testing and commissioning of class J type Oxygen Gas filled Cylinder etc in complete as per technical specification. 37 od325130/2023_2024Supply,testing and commissioning of J type Nitrous Oxide Gas filled Cylinder as per technical specification. 38 od326890/2023_2024Supply,testing and commissioning of J type CO2 Gas filled Cylinder as per technical specification. 39 od326670/2023_2024Supply and installation of Bed Head 5ft(Horizontal) unit made out of High strength extruded Aluminum Panel of minimum 2.5 mm thickness with powder coated to make it aesthetically appealing and long lasting, the panel should be suitable for accommodating following utilities - Oxygen, Vacuum, Medical Air, Nurse call switch — 1, spare probe, 2 no 5 /15A combined socket with switch outlet — 2 set, provision RJ-45 socket/ Ethernet, shall have monitor holder and equipped with two side rail system to hold different associated accessories like vaccine basket, Holder for vacuum collection jar, examination lamp, IV pole, etc. and all necessary mechanical supports for complete installation as instructed and directed by engineer in- charge. 40 od326825/2023_2024Supply Installation of BPC Oxygen Flow meter as per technical specification. 41 od326826/2023_2024Supply Installation of Ward vacuum unit with 600 ml collection jar asper technical specification. 42 od325148/2023_2024Supply Installation of Theatre Vacuum unit with trolly and 2000 ml collection jar as per technical. . 43 od325149/2023_2024Supply,Installation,testing and commissioning of Anesthesia Pendent Single Arm 44 od326774/2023_2024BHP Suction Clamp 45 od326775/2023_2024BHP IV Stand 46 od326776/2023_2024BHP Monitor Tray 47 od326777/2023_2024Supply,Installation,testing and commissioning of High Pressure Antistatic Hose with color coded.