}

Auction Sale Of Used Miscellaneous Scraps No Longer-Odisha

TP Southern Odisha Distribution Limited has published Auction Sale Of Used Miscellaneous Scraps No Longer. Submission Date for this Tender is 14-01-2025. Scrap Tenders in Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

47095541
Auction Sale Of Used Miscellaneous Scraps No Longer
Open Tender
Indian
Odisha
14-01-2025

Tender Details

Auction Sale Of Used Miscellaneous Scraps No Longer 1 LOT 1-POWER TRANSFORMER 1.6 MVA 33/11KV W/O OIL BERHAMPUR EA 19 18% 1% NO 500,000.00 2 LOT 2-POWER TRANSFORMER 5.0 MVA 33/11 KV W/O OIL BERHAMPUR EA 2 18% 1% NO 200,000.00 3 LOT 3-POWER TRANSFORMER 3.15 MVA 33/11KV W/O OIL BERHAMPUR EA 3 18% 1% NO 200,000.00 4 LOT 4-POWER TRANSFORMER 1 MVA 33/11KV W/O OIL BERHAMPUR EA 1 18% 1% NO 50,000.00 5 LOT 5-POWER TRANSFORMER 630KVA 33/11KV CU W/O OIL BERHAMPUR EA 5 18% 1% NO 50,000.00 6 LOT 6-TRANSFORMER 16KVA 11/.4KV (CU) W/O OIL BERHAMPUR EA 32 18% 1% NO 10,000.00 7 LOT 7-TRANSFORMER 250KVA 11/.4KV (AL) W/O OIL BERHAMPUR EA 18 18% 1% NO 10,000.00 8 LOT 8-TRANSFORMER 100KVA 11/.4KV (AL) W/O OIL BERHAMPUR EA 70 18% 1% NO 25,000.00 9 LOT 9-TRANSFORMER 63KVA 11/.4KV (AL) W/O OIL BERHAMPUR EA 80 18% 1% NO 10,000.00 10 LOT 10-TRANSFORMER 25KVA 11/.4KV (CU) W/O OIL BERHAMPUR EA 70 18% 1% NO 10,000.00 11 LOT 11-TRANSFORMER 16KVA 11/.23KV (CU) W/O OIL BERHAMPUR EA 20 18% 1% NO 5,000.00 12 LOT 12-TRANSFORMER 16KVA 11/.23KV (AL) W/O OIL BERHAMPUR EA 29 18% 1% NO 5,000.00 13 LOT 13-TRANSFORMER 10KVA 11/.23KV (CU) W/O OIL BERHAMPUR EA 200 18% 1% NO 10,000.00 14 LOT 14-STATION TRANSFORMER 100KVA 33/.4KV (CU) W/O OIL BERHAMPUR EA 2 18% 1% NO 10,000.00 15 LOT 15-SCRAP MU DIFF CURRENT RATING W/O OIL BERHAMPUR EA 50 18% 1% NO 10,000.00 16 LOT 16-SCRAP-CABLE MISCELLANEOUS (AB, PVC, XLPE, ARM) BERHAMPUR KG 10,000 18% 1% NO 50,000.00 17 LOT 17-CR PANELS (WITH/ WITHOUT ACCESSORIE) BERHAMPUR EA 28 18% 1% NO 10,000.00 18 LOT 18-SCRAP AB SWITCH & HG FUSE (W/O PIPE) BERHAMPUR EA 225 18% 1% NO 10,000.00 19 LOT 19-SCRAP-OIL DRUM EMPTY (MS) BERHAMPUR EA 200 18% 1% NO 5,000.00 20 LOT 20-SCRAP MIX INSULATOR WITH / WITHOUT PIN (Pin Insulator, Disc Insulator, LA, Bushing, HW/F ETC) BERHAMPUR EA 1,500 18% 1% NO 2,000.00 21 LOT 21-SCRAP AAA CONDUCTOR DIFFT. SIZE BERHAMPUR KG 5,000 18% 1% NO 25,000.00 22 LOT 22-SCRAP-DIST BOX LT DIFFERENT SIZE BERHAMPUR EA 20 18% 1% NO 10,000.00 Page 4 of 16 23 LOT 23-SCRAP ACSR & AAA CONDUCTOR DIFFT. SIZE BERHAMPUR KG 28,000.00 18% 1% NO 100,000.00 24 LOT 24-SCRAP-MS IRON (CONSISTING OF JOIST POLE, RAIL POLE, RUSTED MS CLAMP, EMPTY O-D VCB, EMPTY CR PANNEL, OIL DRUM, RUSTED NUT AND BOLT, CROSS ARM, WINDOW GRILLS, IRON TABLE, IRON CHAIR, BARBED WIRE, CTPT JUNCTION BOX, TUBELIGHT FRAME, RUSTED DISTRIBUTION BOXES, RUSTED MS ANGLE - CHANNEL ETC) BERHAMPUR KG 25,000.00 18% 1% NO 20,000.00 25 LOT 25-SCRAP-METERING CUBCLE 11KV ASSORTED RATIO BERHAMPUR EA 9 18% 1% NO 1,000.00 26 LOT 26-SCRAP METER 1PH/3PH WITH / WITHOUT BOX BERHAMPUR KG 30,152.51 18% 1% NO 50,000.00 27 LOT 27-INDOOR TYPE VCB (11KV/33KV) WITH TROLLEY BERHAMPUR EA 8 18% 1% NO 1,000.00 28 LOT 28-SCRAP RESIN CAST CT-PT ASSORTED BERHAMPUR EA 35 18% 1% NO 1,000.00 29 LOT 29-SCRAP CONTROL CABLE VARIOUS SIZE BERHAMPUR KG 500 18% 1% NO 1,000.00 30 LOT 30-SCRAP COIL COPPER SEDPC BERHAMPUR KG 500 18% 1% NO 1,000.00 31 LOT 31-SCRAP COIL ALUMINIUM SE-DPC BERHAMPUR KG 1500 18% 1% NO 1,000.00 32 LOT 32-SCRAP BRASS DIFF TYPE BERHAMPUR KG 150 18% 1% NO 1,000.00 Page 5 of 16 Payment and Lifting Terms: Annexure-II SL. NO. LOT DESCRIPTION STORE LOCATION UOM QTY Payment terms Lifting Terms 1 LOT 1-POWER TRANSFORMER 1.6 MVA 33/11KV W/O OIL BERHAMPUR EA 19 10 working days from SO 20 working days from DO 2 LOT 2-POWER TRANSFORMER 5.0 MVA 33/11 KV W/O OIL BERHAMPUR EA 2 10 working days from SO 20 working days from DO 3 LOT 3-POWER TRANSFORMER 3.15 MVA 33/11KV W/O OIL BERHAMPUR EA 3 10 working days from SO 20 working days from DO 4 LOT 4-POWER TRANSFORMER 1 MVA 33/11KV W/O OIL BERHAMPUR EA 1 10 working days from SO 20 working days from DO 5 LOT 5-POWER TRANSFORMER 630KVA 33/11KV CU W/O OIL BERHAMPUR EA 5 10 working days from SO 20 working days from DO 6 LOT 6-TRANSFORMER 16KVA 11/.4KV (CU) W/O OIL BERHAMPUR EA 32 10 working days from SO 20 working days from DO 7 LOT 7-TRANSFORMER 250KVA 11/.4KV (AL) W/O OIL BERHAMPUR EA 18 10 working days from SO 20 working days from DO 8 LOT 8-TRANSFORMER 100KVA 11/.4KV (AL) W/O OIL BERHAMPUR EA 70 10 working days from SO 20 working days from DO 9 LOT 9-TRANSFORMER 63KVA 11/.4KV (AL) W/O OIL BERHAMPUR EA 80 10 working days from SO 20 working days from DO 10 LOT 10-TRANSFORMER 25KVA 11/.4KV (CU) W/O OIL BERHAMPUR EA 70 10 working days from SO 20 working days from DO 11 LOT 11-TRANSFORMER 16KVA 11/.23KV (CU) W/O OIL BERHAMPUR EA 20 10 working days from SO 20 working days from DO 12 LOT 12-TRANSFORMER 16KVA 11/.23KV (AL) W/O OIL BERHAMPUR EA 29 10 working days from SO 20 working days from DO 13 LOT 13-TRANSFORMER 10KVA 11/.23KV (CU) W/O OIL BERHAMPUR EA 200 10 working days from SO 20 working days from DO 14 LOT 14-STATION TRANSFORMER 100KVA 33/.4KV (CU) W/O OIL BERHAMPUR EA 2 10 working days from SO 20 working days from DO 15 LOT 15-SCRAP MU DIFF CURRENT RATING W/O OIL BERHAMPUR EA 50 10 working days from SO 20 working days from DO 16 LOT 16-SCRAP-CABLE MISCELLANEOUS (AB, PVC, XLPE, ARM) BERHAMPUR KG 10,000 10 working days from SO 20 working days from DO 17 LOT 17-CR PANELS (WITH/ WITHOUT ACCESSORIE) BERHAMPUR EA 28 10 working days from SO 20 working days from DO 18 LOT 18-SCRAP AB SWITCH & HG FUSE (W/O PIPE) BERHAMPUR EA 225 10 working days from SO 20 working days from DO 19 LOT 19-SCRAP-OIL DRUM EMPTY (MS) BERHAMPUR EA 200 10 working days from SO 20 working days from DO Page 6 of 16 20 LOT 20-SCRAP MIX INSULATOR WITH / WITHOUT PIN (Pin Insulator, Disc Insulator, LA, Bushing, HW/F ETC) BERHAMPUR EA 1,500 10 working days from SO 20 working days from DO 21 LOT 21-SCRAP AAA CONDUCTOR DIFFT. SIZE BERHAMPUR KG 5,000 10 working days from SO 20 working days from DO 22 LOT 22-SCRAP-DIST BOX LT DIFFERENT SIZE BERHAMPUR EA 20 10 working days from SO 20 working days from DO 23 LOT 23-SCRAP ACSR & AAA CONDUCTOR DIFFT. SIZE BERHAMPUR KG 28,000.00 10 working days from SO 20 working days from DO 24 LOT 24-SCRAP-MS IRON (CONSISTING OF JOIST POLE, RAIL POLE, RUSTED MS CLAMP, EMPTY O-D VCB, EMPTY CR PANNEL, OIL DRUM, RUSTED NUT AND BOLT, CROSS ARM, WINDOW GRILLS, IRON TABLE, IRON CHAIR, BARBED WIRE, CTPT JUNCTION BOX, TUBELIGHT FRAME, RUSTED DISTRIBUTION BOXES, RUSTED MS ANGLE - CHANNEL ETC) BERHAMPUR KG 25,000.00 10 working days from SO 20 working days from DO 25 LOT 25-SCRAP-METERING CUBCLE 11KV ASSORTED RATIO BERHAMPUR EA 9 10 working days from SO 20 working days from DO 26 LOT 26-SCRAP METER 1PH/3PH WITH / WITHOUT BOX BERHAMPUR KG 30,152.51 10 working days from SO 20 working days from DO 27 LOT 27-INDOOR TYPE VCB (11KV/33KV) WITH TROLLEY BERHAMPUR EA 8 10 working days from SO 20 working days from DO 28 LOT 28-SCRAP RESIN CAST CT-PT ASSORTED BERHAMPUR EA 35 10 working days from SO 20 working days from DO 29 LOT 29-SCRAP CONTROL CABLE VARIOUS SIZE BERHAMPUR KG 500 10 working days from SO 20 working days from DO 30 LOT 30-SCRAP COIL COPPER SE-DPC BERHAMPUR KG 500 10 working days from SO 20 working days from DO 31 LOT 31-SCRAP COIL ALUMINIUM SE-DPC BERHAMPUR KG 1500 10 working days from SO 20 working days from DO 32 LOT 32-SCRAP BRASS DIFF TYPE

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail