Supply Of Materials To Gwm Work At Chamanalli 9 Works In Yadgir Tq. - Portland Cement.Ydg,Coarse Sand (Zone Iii).Ydg,Granite Metal 40Mm Ydg,Granite Metal 20Mm Ydg,Broken Granite Metal 10Mm Yad,Masaon Class 1 ( With Tools),Add Formwork At 4 Percentage Out Of Material And Labour Yadgi,Tmt Bars Fe 500.Ydg,Binding Wire.Ydg,Add Sundries Charges At 1 % On Material.Ydg,Jungle Wood Runners And Planks Yad,Silver Oak Or Equivalent Planks 38 Mm Thick Yad,Casurina Poles 100 - 150 Mm.Ydg,Add Handing Loading And Unloading At 2 Percentage On Material Yad,Add Sundries Charges At 2 % On Material.Ydg,Broken Stone Aggregate 20 Mm Size.Ydg,Broken Stone Aggregate 12 Mm To 10 Mm Size.Ydg,Plasticizer / Super Plasticizer Yad,Mixer (Concrete) - 1 Cum Capacity.Ydg,Hom Of Vibrator 0.71 Days.Ydg,Add Watering Charges At 1 % On Material.Ydg,Hydraulic Excavator 0.9 Cum Bucket Capacity At 60 Cum Per Hour.Ydg,Tipper 5.5 Cum With 10 Tonne Capacity.,Loading Of Earth As Per Item 1.1 (Ii).,Unloading Of Earth As Per Item 1.1 (Iv).,Dozer D-50 For Spreading At 200 Cum Per Hour.Ydg,Motor Grader At 50 Cum Per Hour.Ydg,Water Tanker 6 Kl Capacity.Ydg,Three Wheel 80-100 Kn Static Roller.Ydg,Water.Ydg,Compensation For Earth Taken From Private Land.Ydg,Brick Yad,Mixer (Concrete Small Used In Culvert).Ydg,Add Handling , Loading And Unloading At 1% On Material.Ydg,Add Providing And Removing Scaffolding At 3% On Labour.Ydg,Pvc Pipe Of 10 Kg Cum 90 Mm Yad,Mild Steel 6 Mm Dia Yad,Table Moulded Bricks Of Class Designation 50 Non Modular Ydg,C.I Manholes Cover With Frame Yad,Foreman Grade 1 Yad,Cost Of Centering At 1 Percentage On Material Yad,Filter Media Stone Aggeragates.,Laboratory Asst ( Sslc Passed) Mate/Supervisor,Stone Aggragate (Single Size) 40 Mm Nominal Size.Ydg,Stone Aggragate (Single Size) 20 Mm Nominal Size.Ydg,Name Board Yadgir