Establishment Of Lan At Waste To Energy Plant Bidadi - Installation, Commissioning, Testing, Project Management, Documentation & Handing Over Charges,Excavating Mud, Rcc Road, And Filling It With Mud And Cement.,T-Copper 10G Sfp Trancieve Sfp Module.,Sm 10G Sfp Trancieve Sfp Module.,Gigabit 48-Port L2 Smart Manageable Switch.,Gigabit 24-Port L2 Smart Manageable Switch.,Fully Loaded 6U Rack With All Necessary Accessories.,Fully Loaded 9U Rack With All Necessary Accessories.,Gi Pipe.,Hdpe Coupling Coupler 25-25Mm,Minium 6 Core Outdoor Armored Single Mode Ofc,Hdpe Pipe 25Mm,Lc To Lc Sm Fiber Ofc Patch Cord, 3 Meter,Fully Loaded 12-Port Liu With Splice Tray, Pigtails,Adapter, Splice Protectors, Including All Fiber Splicing, Fiber Testing (Olts).,Fully Loaded 24-Port Liu With Splice Tray, Pigtails, Adapter, Splice Protectors, Including All Fiber Splicing, Fiber Testing (Olts).,Cat-6, 24 Port Fully Loaded Jack Panel,Miscellaneous Materials (Tie, Ferrule, Sticker Label, Ms Saddle, Screw, Fluke Utp Testing Etc.,),Gray Pvc Saddle 25Mm,Gray Pvc Bend 25Mm,Gray Pvc Pipe 25Mm,Cat-6A Utp Patch Card. Length 1Mtr,Cat-6A Utp Keystone,Cat-6A Stp Cable,Dual Port Face Plate With Back Box,Single Port Face Plate With Back Box,Cat-6 Utp Patch Cord 2Mtr,Cat 6 Utp Patch Cord 1Mtr,Cat 6 Utp Keystone,Cat 6 Utp Cable Roll Of 305M Per Box