Shipping Boards / Undertakings / PSU Closing in 0 days TDR #46928506

Tender For Miscellaneous Jobs Navy Vessel Rm0807

Issued by Boards / Undertakings / PSU · karwar, Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
02 Jan 2025
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
karwar → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Miscellaneous Jobs Navy Vessel Rm0807; 1 SYSTEM 1 2 Domestic fresh water system (SERVICE COST) 3 1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR. 4 Domestic fresh water system (MATERIAL COST) 5 1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR. 6 SYSTEM 2 7 Domestic Sea water system (SERVICE COST) 8 Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure 9 Domestic Sea water system (MATERIAL COST) 10 Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure 11 SYSTEM 3 12 Chilled Water System (SERVICE COST) 13 1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator. 14 Chilled Water System (MATERIAL COST) 15 1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator. 16 SYSTEM 4 17 Fire main system (SERVICE COST) 18 1.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10 19 Fire main system (MATERIAL COST) 20 1.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10 21 SYSTEM 5 22 OXYGEN PLANT (SERVICE COST) 23 1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly 24 OXYGEN PLANT (MATERIAL COST) 25 1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly 26 SYSTEM 6 27 Chemical Fire Smothering System (07 stations) (SERVICE COST) 28 1.18.5 Check automatic and remote start of system without HALON release from the extinguishers 29 Chemical Fire Smothering System (07 stations) (MATERIAL COST) 30 1.18.5 Check automatic and remote start of system without HALON release from the extinguishers 31 SYSTEM 7 32 Foam Fire Fighting System (SERVICE COST) 33 1.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System 34 Foam Fire Fighting System (MATERAIL COST) 35 1.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System 36 SYSTEM 8 37 Drainage Pump (SERVICE COST) 38 1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary. 39 Drainage Pump (MATERIAL COST) 40 1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary. 41 SYSTEM 9 42 Bekas (Work Boat) ( SERVICE COST) 43 1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. 44 Bekas (Work Boat) ( MATERIAL COST) 45 1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. 46 SYSTEM 10 47 OFB (Officers Boat) (SERVICE COST) 48 1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02 49 OFB (Officers Boat) (MATERIAL COST) 50 1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02 51 SYSTEM 11 52 GAS ANALYSER FOR FUEL & OXYGEN (SERVICE COST) 53 Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required . 54 GAS ANALYSER FOR FUEL & OXYGEN (MATERIAL COST) 55 Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required . 56 SYSTEM 12 57 Electromagnetic bleed valve (SERVICE COST) 58 Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30 59 Electromagnetic bleed valve (MATERIAL COST) 60 Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30 61 SYSTEM 13 62 Resistor-E (SERVICE COST) 63 3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system 64 Resistor-E (MATERIAL COST) 65 3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system 66 SYSTEM 14 67 Gas detection system (SERVICE COST) 68 rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective 69 Gas detection system (MATERIAL COST) 70 rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective 71 SYSTEM 15 72 Vent Flap (SERVICE COST) 73 Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications. 74 Vent Flap (MATERIAL COST) 75 Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.

BOQ

Name of Work: MISCALLENEOUS JOBS IN NAVY VESSEL (RM.0807)
Sl. No. Item Description
1SYSTEM 1
2Domestic fresh water system (SERVICE COST)
31.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR.
4Domestic fresh water system (MATERIAL COST)
51.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR.
6SYSTEM 2
7Domestic Sea water system (SERVICE COST)
8Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure
9Domestic Sea water system (MATERIAL COST)
10Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure
11SYSTEM 3
12Chilled Water System (SERVICE COST)
131.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator.
14Chilled Water System (MATERIAL COST)
151.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator.
16SYSTEM 4
17Fire main system (SERVICE COST)
181.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10
19Fire main system (MATERIAL COST)
201.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10
21SYSTEM 5
22OXYGEN PLANT (SERVICE COST)
231.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly
24OXYGEN PLANT (MATERIAL COST)
251.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly
26SYSTEM 6
27Chemical Fire Smothering System (07 stations) (SERVICE COST)
281.18.5 Check automatic and remote start of system without HALON release from the extinguishers
29Chemical Fire Smothering System (07 stations) (MATERIAL COST)
301.18.5 Check automatic and remote start of system without HALON release from the extinguishers
31SYSTEM 7
32Foam Fire Fighting System (SERVICE COST)
331.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System
34Foam Fire Fighting System (MATERAIL COST)
351.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System
36SYSTEM 8
37Drainage Pump (SERVICE COST)
381.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary.
39Drainage Pump (MATERIAL COST)
401.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary.
41SYSTEM 9
42Bekas (Work Boat) ( SERVICE COST)
431.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks.
44Bekas (Work Boat) ( MATERIAL COST)
451.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks.
46SYSTEM 10
47OFB (Officers Boat) (SERVICE COST)
481.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02
49OFB (Officers Boat) (MATERIAL COST)
501.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02
51SYSTEM 11
52GAS ANALYSER FOR FUEL & OXYGEN (SERVICE COST)
53Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required .
54GAS ANALYSER FOR FUEL & OXYGEN (MATERIAL COST)
55Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required .
56SYSTEM 12
57Electromagnetic bleed valve (SERVICE COST)
58Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30
59Electromagnetic bleed valve (MATERIAL COST)
60Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30
61SYSTEM 13
62Resistor-E (SERVICE COST)
633.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system
64Resistor-E (MATERIAL COST)
653.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system
66SYSTEM 14
67Gas detection system (SERVICE COST)
68rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective
69Gas detection system (MATERIAL COST)
70rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective
71SYSTEM 15
72Vent Flap (SERVICE COST)
73Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.
74Vent Flap (MATERIAL COST)
75Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.

AI Tender Summary

OUR REF NO 46928506
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 02-01-2025
Authority
Authority Name Cochin Shipyard Limited
Work Description Tender For Miscellaneous Jobs Navy Vessel Rm0807; 1 SYSTEM 1 2 Domestic fresh water system (SERVICE COST) 3 1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR. 4 Domestic fresh water system (MATERIAL COST) 5 1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR. 6 SYSTEM 2 7 Domestic Sea water system (SERVICE COST) 8 Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure 9 Domestic Sea water system (MATERIAL COST) 10 Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure 11 SYSTEM 3 12 Chilled Water System (SERVICE COST) 13 1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator. 14 Chilled Water System (MATERIAL COST) 15 1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator. 16 SYSTEM 4 17 Fire main system (SERVICE COST) 18 1.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10 19 Fire main system (MATERIAL COST) 20 1.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10 21 SYSTEM 5 22 OXYGEN PLANT (SERVICE COST) 23 1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly 24 OXYGEN PLANT (MATERIAL COST) 25 1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly 26 SYSTEM 6 27 Chemical Fire Smothering System (07 stations) (SERVICE COST) 28 1.18.5 Check automatic and remote start of system without HALON release from the extinguishers 29 Chemical Fire Smothering System (07 stations) (MATERIAL COST) 30 1.18.5 Check automatic and remote start of system without HALON release from the extinguishers 31 SYSTEM 7 32 Foam Fire Fighting System (SERVICE COST) 33 1.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System 34 Foam Fire Fighting System (MATERAIL COST) 35 1.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System 36 SYSTEM 8 37 Drainage Pump (SERVICE COST) 38 1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary. 39 Drainage Pump (MATERIAL COST) 40 1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary. 41 SYSTEM 9 42 Bekas (Work Boat) ( SERVICE COST) 43 1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. 44 Bekas (Work Boat) ( MATERIAL COST) 45 1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. 46 SYSTEM 10 47 OFB (Officers Boat) (SERVICE COST) 48 1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02 49 OFB (Officers Boat) (MATERIAL COST) 50 1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02 51 SYSTEM 11 52 GAS ANALYSER FOR FUEL & OXYGEN (SERVICE COST) 53 Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required . 54 GAS ANALYSER FOR FUEL & OXYGEN (MATERIAL COST) 55 Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required . 56 SYSTEM 12 57 Electromagnetic bleed valve (SERVICE COST) 58 Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30 59 Electromagnetic bleed valve (MATERIAL COST) 60 Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30 61 SYSTEM 13 62 Resistor-E (SERVICE COST) 63 3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system 64 Resistor-E (MATERIAL COST) 65 3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system 66 SYSTEM 14 67 Gas detection system (SERVICE COST) 68 rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective 69 Gas detection system (MATERIAL COST) 70 rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective 71 SYSTEM 15 72 Vent Flap (SERVICE COST) 73 Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications. 74 Vent Flap (MATERIAL COST) 75 Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.
Basic Detail
Tender No CSL/SR1/VKD435
Bidding Type Tender
Location
City karwar
State Kerala
Key Dates
Publish Date 27 Dec 2024
Submission Date 02 Jan 2025
Open Date 03 Jan 2025
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
6fa22dce-9edf-4fb0-8ac8-fac17defdfd1.html
BOQ_246738.xls
TD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 27, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 02, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 03, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

6fa22dce-9edf-4fb0-8ac8-fac17defdfd1.html

xls

BOQ_246738.xls

pdf

TD.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender