Tender For Tanka, Pcd, Recharge Shaft - Clearing of forest, including cutting of heavy bushes and plants up to 30 cm height. p.s silora 2022 item 192 70%thick, Excavate soil up to 1.5 depth in foundation, trench, drain, compact the bottom, pour water, improve the side, take out the excavated soil, after filling the foundation, fill the empty spaces again with soil and dispose the remaining soil up to a distance of 50 meters Hard soil4 Excavate soil up to 1.5 depth in foundation, trench, drain, compact the bottom, pour water, improve the side, take out the excavated soil, after filling the foundation, fill the empty spaces again with soil and dispose the remaining soil up to a distance of 50 meters murram kankar5 Excavate soil up to 1.5 depth in foundation, trench, drain, compact the bottom, pour water, improve the side, take out the excavated soil, after filling the foundation, fill the empty spaces again with soil and dispose the remaining soil up to a distance of 50 meters disintigrated rock to a distance of6 In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken)/brick soil in cement-sand mixture in the ratio of 1 cement : 4 sand : 8 aggregate and ram it, including watering.7 Stone masonry for anicut in cement-gravel mixture.8 On cement plaster wall, mix cement-gravel in the ratio of 1:4, scrape the joints and apply watering regularly for 14 days.9 On stone or brick work, put flat or ruled (exposed) tip in cement-gravel mixture in the ratio of 1:3, with watering regularly for 14 days. 10 Cement concrete in aggregate ratio of 1 cement : 2 gravel : 4 stone with aggregate of 12mm nominal size, including pouring, ramming and tamping etc.11 Pitching of single stone cut by hammer 15 to 30cm thick with complete lifting, supply.12 Rolled masonry of stone in foundation and plinth in mortar or dry stone without mortar.13 Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m14 Excavation of soil by JCB machine/tractor with scraper, digging the excavated soil up to 15cm. Compaction of earth or highly weathered strata . By manually or plain roller. (density 90% of Proctor).16 Watering of earth including cost of carriage of water when source of water is beyond 250 m but upto 1Km17 lip cutting and final dressing as per designed section including rehandling and disposal of excavated earth in layers 20 cm on embankments etc with cost of dewatering wherever required and complete in all respect. 18 Excavation of soil upto 1.5 m depth in foundation, trench, drain, tamping of bottom, watering, beautification of sides, removal of excavated soil, filling of empty spaces with soil again after foundation and disposal of remaining soil upto a distance of 50 m. BSR 2A 1.5 m extra lift in item 1.1 in ordinary/soft soil19 Cement Concrete Pouring and supply of reinforced cement concrete of 1:2:4 mixture, pressing of roof slabs, eaves, beams, lintels etc., tamping and leveling of surface with 1:3 cement mortar etc. including scaffolding but cost of steel and shuttering separately. BSR 13A20 Centering/Fixing of shuttering (ply and drapery) for RCC roof, slab, balcony, lintel etc. upto 4.5 meter height and removal etc. as per specifications. BSR 93B21 Supply of stone lintel and fixing it in mortar used in masonry. 100 to 150 mm thickness Unit: Square meter BSR 36 B22 Cutting, bending, fixing and fastening of iron for RCC work along with supply. BSR 6123 Whitewashing work in 3 layers to give even shade on new work. BSR 80 A24 Supply & Fixing of Aluminium Lid 2 x 225 Supply of nylon netto cover screen26 Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strataunconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 andIS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and its packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & its primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.iteamsAjmer phed 2023 iteam 2.1.2200 mm dia27 Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strataunconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 andIS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and its packing as per IS: 2800 (Part I & II) 1979 as amended up to date (thework includes the cost of gravel & its primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly).The work would be completed after obtaining sand free water.Ajmer phed 2023 itam 2.1.2200 mm dia Nominal bore 250 mm dia.28 NB (Thickness of pipe 5.4mm & mass of tube 28.46 Kg/m)(Chapter no 2 ITEM NO 2.11.2 ) BSR PHED Ajmer 2023-24200 mm29 NB (Thickness of pipe 5.4mm & mass of tube 28.46 Kg/m)(Chapter no 2 ITEM NO 2.11.2 ) BSR PHED Ajmer 2023-24 250 mm30 40mm grit of stone(broken by crusher)(cut voids 1/11) BSR silora 2024-2531 20mm grit of stone(broken by crusher)BSR silora 2024-2532 In layers in filter toe Placement of washed coarse gravel along the entire lift in the desired profile. BSR Silora 2024-2533 GI pipe 25 mm diameter(B Class) 179 b BSR silora 2024-2534 Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect.WRD BSR_2022 _ Ch-5/1b,c Hard/dense soil35 Hard soil mixed with Kankar / boulders, Morrum36 Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. WRD BSR_2022 _ Ch-5/2a, 2b Soft / Disintegrated rock37 Hard rock not requiring blasting38 Add extra over item No. 1 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.50 m or part there of including loading and un-loading wherever required WRD BSR_2022 _ Ch-5/1139 Cement Concrete of 1:1.5:3 Mixture Supply and pouring of prestressed cement concrete, pressing in of roof slabs, eaves, beams, lintels etc, plastering and levelling of surface with 1:3 cement mortar etc including scaffolding but cost of steel and shuttering separately. BSR 13B 40 Cement concrete in the ratio of 1 cement : 2 gravel : 4 stone aggregate with 12mm nominal size aggregate including casting, ramming, tamping etc. BSR 1641 Cutting and mounting of iron girders and fixing in place upto 4.5m height. Note :- Analysis BSR 6242 for 6m length and size 300 X 150 mm. (37.7 kg per meter) Roofing with top grade stone slabs, 1:4 ratio with stone arches at joints at top and bottom Filling with cement mortar in 1.5 upto 2.4 m span BSR 45 B43 Cement plaster on wall using cement - gravel in 1:4 ratio, scraping joints and regular watering for 14 days ----- 12 mm. Thickness BSR 77 C44 QkZ ds uhps lq[kk [kajtk gsrq 15 lseh mps iRFkjksa dh vkiwfrZ ,oa [kajtk yxkus dk iw.kZ dk;Z45 Cement concrete 1:2:4 mix having 1 cement in 50 mm thickness 2 Gravel 4 Stone or brick 12 m. Mixing with gravel, pouring, ramming, pressing and leveling etc. BSR 14 A46 Making a ball of 75 x 75 mm. BSR 51 B47 Iron mesh in cement concrete Supply and installation of 125 mm diameter (grating) BSR 18248 Laying of 110 mm diameter PVC pipe along with other necessary materials BSR 18149 Supply & Fixing of Aluminum Lid 2 x 2 & Hand Pump with accessories50 Supply & Fixing iron bar clamp ladder.