Ltsa For Services / Inspection And Refurbishment Of Spares For Gas Turbines 230-Gt-01 / 02 / 03 And 21-Gt-04 / 05 At Cpcl, Manali , Part-A Inspection / Services Charges For Inspection / Services In Cpp & Oph Gas Turbines (230-Gtg-01/02/03, 21-Gtg-04 & 21-Gtg-05) For 1St Year - 2025 As Per Scope Fo Work With Time Schedule And Special Terms & Conditions Attached As Annexures. , Combustion Inspection (Ci), Mechanical , Combustion Inspection (Ci) Instrumentation , Borescope Inspection (Bi) , Major Inspection Of Gt(Mi) Mechanical , Major Inspection Of Gt(Mi) Instrumentation , Auxilary Gear Box (Agb) Inspection , Load Gear Box Inspection , Extended Combustion Inspection / Hot Gas Path Inspection , Mechanical / Control & Instrumentation -Ta (Technical Adviser) - Per Day (8 Hrs) , Mechanical -Ta (Technical Adviser) - Per Hour, Extra Hours Beyond 8 Hrs On Normal Working Days And On Sundays And Public Hoidays , To & Fro Travel Charges (Economy Class), Boarding & Lodging Charges & Local Charges, Per Ta Per Visit, To Be Paid At Actuals On Submission Of Doumentary Proof , Exhaust Plenum Replacement , Igv Relocation Along With Mi , Gt Frame-V Rotor Repair , Part- B Reconditioning Of Spares Charges For Reconditioning Services In Cpp & Oph Gas Turbines (230-Gtg-01/02/03, 21-Gtg-04 & 21-G Tg-05) For 1St Year - 2025 As Per Scope Fo Work With Time Schedule And Special Terms & Conditions Attached As Annexures , Repair Of First Stage Nozzle S1n(1No) , Repair Of 2Nd Stage Nozzle S2n (1No) , Repair Of 1St Stage Shroud (Std) , Repair Of 2Nd Stage Shroud (Std) , Repair Of 2Nd Stage (Honey Comb) Shroud (Set=30Nos) , Repair Of 1St Stage Buckets(1Set= 120 Nos.) , Repair Of 2Nd Stage Buckets (1Set=90 Nos.) , Repair Of Combustion Liners , Repair Of Transition Pieces , Repair, Testing Calibration Of Dual Fuel Nozzle , Repair Of Cross Fire Tubes , Part- C Supply Of Spares For Reconditioning & Repair Charges For Supply Of Parts For Replacement Towards Repair & Reconditioningof Oph Gas Turbines (230-Gtg-01/02/03, 21-Gtg-04 & 21-G Tg-05) For 1St Year - 2025 As Per Scope Fo Work With Time Schedule And Special Terms & Conditions Attached As Annexures. , Hula Seal For Combustion Liner , Cowl Cap For Combustion Liner , Cowl Cap Assembly For Combustion Liner , Xft Collar For Combustion Liner , Aft Sleeve For Combustion Liner , Fixed Seal For Transition Pieces , Floating Seal For Transition Pieces , Transition Piece Assembly For Dual Fuel Nozzle , Air Cone For Dual Fuel Nozzle , Gas Tip For Dual Fuel Nozzle , Gasket For Dual Fuel Nozzle , Lock Plate For Dual Fuel Nozzle , T Connector For Dual Fuel Nozzle , Compressor Rotor Blade Kit With Spacer For Frame-V For Gt Rotor Repair , Marriage Hardware For Frame-V For Gt Rotor Repair , Note: 1. This Ltsa Contract Is Valid From 01.01.2025 To 31.12.2029 2. The Above Mentioned Unit Rates Are For Calendar Year 2025. 3. To Arrive At Unit Rates For Calendar Year 2026 = Unit Rate In 2025 X Fixed Annual Escalation 4. Similarly For 2027, 2028, 2029, The Unit Rates Will Be Calculated As Above On Annual Compounding Basis From 1St January Of Every Year. 5. For Part - A & Part - B, The Fixed Annual Escalation Will Be 6% 6. For Part - C, The Annual Escalation Will Be 4%