Providing Vrc / Vrf Centralized Ac System In District Office Complex Building For Finance Department At Srikakulam Municipality In Srikakulam District , Supply, Installation And Testing Of Refrigerant Piping For 41.30Mm Dia-Elec-5.620 (A),Lifting, Shifting, Positioning, Testing And Commissioning Indoor Units,Lifting, Shifting, Positioning, Installation, Testing And Commissioning Of Indoor Units,Lifting, Shifting, Positioning, Installation, Testing And Commissioning Of Indoor Units For Low Side Installation,Lifting, Shifting, Positioning And Testing Of The Odus For Low Side Installation,Supply Of Indoor Units For 0.65Tr (Model:Fxfaq20pve) - Elec-5.6.6 (A),Supply Of Indoor Units For 1.04Tr (Model:Fxfaq32pve) - Elec-5.6.6 (A),Supply Of Indoor Units For 1.32Tr (Model:Fxfaq40pve) - Elec-5.6.6 (B),Supply Of Indoor Units,Simple Wireless Remote Controller To Control The Idus,1.65Tr (Model:Fxfq50avm) - Elec-5.6.8 (B),2.08Tr (Model:Fxfq63avm) - Elec-5.6.8 (C),2.65Tr (Model:Fxq80avm) - Elec-5.6.8 (D),3.31Tr (Model:Fxfq100avm) - Elec-5.6.8 (E),4.15Tr (Model:Fxfq125avm) Elec-5.6.8 (G),Supply And Installation Of Multi Connection Joint / Ref Nets For Idus-Elec-5.6.5,Ref Nets For Double Odu Connections - Elec-5.6.3,20Hp (Model Exq20ary6) Elec-5.6.1 (H),18Hp (Model Rxq18ary6) Elec-5.6.1 (G),16Hp (Model Rxq16ary6) Elec-5.6.1 (F),Supply, Installation, Testing And Commissioning Of Stand Alone, Intelligent Touch Controller,Supply Of Isi Marked Heavy Grade Rigid Pvc Conduite - Elec-1.2.2 (C),Supply Of Isi Marked Heavy Grade Rigid Pvc Conduit - Elec 1.2.1 (B),Supply And Installation Of Control Cum Transmission Wiring For 1.0 Sqm - Elec 1.5.1 (A),Supply And Transportation Of R 410A Gas - Elec5.6.22,Providing Pressure Testing - Elec-5.6.23,Supply, Installation And Testing Of Refrigerant Piping For 6.40Mm Dia- Elec-5.6.20 (H),Supply, Installation And Testing Of Refrigerant Piping For 9.50Mm Dia - Elec-5.6.20 (G),Supply, Installation And Testing Of Refrigerant Piping For 12.70Mm Dia - Elec-5.6.20 (F),Supply, Installation And Testing Of Refrigerant Piping For 15.90Mm Dia - Elec-5.6.20 (E),Supply, Installation And Testing Of Refrigerant Piping For 19.10Mm Dia - Elec-5.6.20 (D),Supply, Installation And Testing Of Refrigerant Piping For 22.20Mm Dia - Elec-5.6.20 (C),Supply, Installation And Testing Of Refrigerant Piping For 28.60Mm Dia- Elec-5.6.20 (B),Supply, Installation And Testing Of Refrigerant Piping For 34.90Mm Dia - Elec5.6.20 (A)