Construction Of Various Works Package-01/2024-25 Kums Deoli Distt. Tonk - Covering of Existing open platform at Sub Yard Jahajpur under kums Deoli 2 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. 3 Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. 4 Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar. 5 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils 6 Add extra for foundation/trenches/drains for every additional lift of 1.5 Mtr. or part thereof in All kinds of soil 7 Supplying and Filling in plinth with river sand under floors including watering ramming consolidating and dressing complete including cost of sand 8 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). 9 Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings,strap beam, raft , bases of columns etc. 10 Providing and laying in position specified grade ofcement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcementfor Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix 11 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (Original producers who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) 12 Plaster on new surface on walls in cement sand mortar 1:4 including rackingofjointsetc. complete fine finish : 13 Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding. New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). 14 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal MixM20 grade Nominal Mix1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stoneaggregate 20mm nominal size). 15 Cutting of construction joint/ longitudinal joint 4 to 6 mm. wideusing mechanical concrete cutter including cost of diamond bit cutting wheel and filling of bitumen sealingcompound in groove including cost of sealing compound. 75 mm depth 16 Steel work in built up tubular trusses including cutting, hoisting ( height upto 10 m)fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. Hot finished welded type tubes. 17 Structural steel work riveted,bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: 18 Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : Two or more coats on new work 19 Extra for providing and fixing wind ties of 40x 6mm flat iron section. 20 Supply and installation of Multi Rib Proofing/cladding Sheet Manufacture out of0.50mm TCT (Total Coated Thickness) high tensile Zinc aluminum alloy coated galvalume steel (as per 150gsm zinc aluminum coated 550Mpa tuekd strength) confirming to IS: 1397/astm A-792 sheet to have wide pens 30mm high NB at 250 centre and centre width of 1020mm sheets be casted with regular modified polyster system on a continuous with line on centre for face and with a polyster coating respectively sheet shall have proportionality with siphoned plate made to prevent leakage sheet shall be fixed by more of sell drilling lift tapping hot dip zinc coated hox head fasterner of size 12x14x55mm long. The sheet shall be supplied in cost one length and for a minimum up to 12mts with all scaffolding. Add extra for 0.60mm TCT (Total Coated Thickness) high tensile Zinc aluminum alloy coated galvalume steel sheet in place of 0.50mm thick 21 Grading roof for water proofing treatment withwater proffing compound Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 22 Providing and fixing steel glazed doors windows and ventilator shutters of standard rolled steel section (IS 1038-1983) joints mitred and welded with steel lugs 13x3mm, 10cm. long embedded in cement concrete block 15x10x10cm. of 1:3:6 (1cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) or with wooden plugs and screws or rawl plugs and screws with fixing clips or with bolts and nuts as required including providing and fixing of plain glass panes 4mm thick with cooper glazing clips and special metal sash putty of approved make or metal beading with screws complete including priming coat of approval steel primer, excluding the cost of metal beading and other fitting except necessary hinges of pivots steel handles peg stay etc. as required : Partly fixed and partly openable [ fixed area not to exceed 33%] 23 Providing and fixing Square bars or other flat welded to window, ventilatiors etc. 24 Supplying and fixing fixed wire gauge of 14 mesh x 24 gauge to the metal frame of rolled section by metal beading 20x3mm with suitable screw at not exceeding 150mm distance. 25 Providing and fixing external grade board solid core single leaf flush door shutters ISI 2202-67 marked using Phenol formal dehyderesinin glue both sides with approved steel fittings complete as per annexure A: 35 mm thick . Decorative teakveneer One side 26 Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. Rajasthan Black Above 3601 Cm2 Slabs 27 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2coarse sand : 4 stone aggregate 10mm and down gauge) includingfinishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : 28 Providing and fixing 1st quality standard white, grey, ivory, fume red brown, light green, light blue and other light shades glazed tiles confirming to IS : 13753 & IS :15622 of size 200mm x 300mm in walls, floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (excluding the cost of cement plaster on walls and pillar). 29 Providing and fixing 1st quality MAT finished ceremic tile size 300x300mm confirmingto IS : 13755 and IS : 15622 colour such as white, grey, ivory, fume red brown, light green, light blue and other light shades in floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (including the cost of cement mortar bed 1:4). 30 Providing, hoisting and fixing up to floor five level precast cement concrete Jali 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6mmnominal size) reinforced with 1.6 mm dia Mild steel wire including centring and shuttering, roughening cleaning, fixing and finishing in cement mortar 1 : 3 (1 cement : 3 fine sand ) etc complete as per approved design excluding plastering of jambs, sills and soffits40 mm thick 31 Providing and fixing 1mm thick M.S. sheet garrage door shutters with frame of 40 x 40 x 6mm. angle iron 3mm M.S. gusset plates at the junction and corners including all fittings and applying a coat of approved steel primer : (Excluding cost of frames) Using M.S. angles 40 x 40 x 6mm for diagonal braces. 32 Providing and Fixing Chiken wire mesh at the joint of masonry members/ R.C.C. Memberswith Nails complete in all respect. 33 Kota stone slab flooring 25 mm thick over 20 mm (average) thickbase laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing completewith base of cement mortar 1 : 4 (1 cement : 4 coarse sand) For area of each slab from 2001 to 5000 Sq.Cm 34 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding: Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. 35 Removing dry or oil bound distemper by scrapping sand papering and preparing surface smooth including necessary repairs to scratches by sandla/loi and all scaffolding (for colour changing only) 36 Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand) 37 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete. 75mmthickwith20mmthicknominalsizeaggregate. 38 P & F PVC Storage Tank ISI Marked (IS : 12701) indicating theBIS license No),of approved make with cover, 25mm dia 1M long G.I. over-flow pipe & 25 Cm. long wash out pipe with plug & socket, including making connection etc., complete of approved design: 500 litres capacity. 39 P & F Ball Cock (IS :1703 Mark) with Rod & P.V.C. Ball complete : Brass wt. Not less than 300 gm, 15mm. 40 2-Const. of Remaining C.C. Road Back to Block A under kums Deoli 41 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplingsand trees girth up to 300 mm, removal of stumps of trees cut earlierand disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 By mechanical Means. In area of light jungle 42 Earth work in cutting with lead up to 50 Meter. And lift up to 1.50 Meter.includingfinishingofformationtorequiredcamberand grade disposed soil to be leveled and dressed in Ordinary Soil 43 Providing and laying granular sub-base material having P.I. not more than 6 including spreading in layers not exceeding 150 mm compactedthickness andconsolidationby8-10tonnepower rollerto required camber and grade including cost of water and hire charges of machinery including T&P with all lead (Compacted thickness to be measured).asper MoRTH specification table 400-1, 400-2, For grading-III with CBR value not less than 20.to attain 100% proctor density. 44 ConstructionofdryleancementconcreteSub-baseovera prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not tobelessthan10Mpaat7days, mixedinabatchingplant, transportedtosite,laidwithapaverwithelectronicsensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per IRC:SP:49-2014 45 Construction of un-reinforced, dowel jointed, plain cement concretepavementoverapreparedsubbasewith43grade cement @ 400 kg per cum, coarse and fine aggregate conformingtoIS383,maximumsizeofcoarseaggregatenot exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation includingprovisionofcontraction,expansion,constructionand longitudinal joints, joint filler, separation membrane (125 micron), sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixturesasapproved,curingcompoundincludingvaccume dewatering process, finishing to lines and grades as per drawing CC design mix grade M30 46 3-Const. of C.C. Road infornt of Block D under kums Deoli 47 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplingsand trees girth up to 300 mm, removal of stumps of trees cut earlierand disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 By mechanical Means. In area of light jungle 48 Earth work in cutting with lead up to 50 Meter. And lift up to 1.50 Meter.includingfinishingofformationtorequiredcamberand grade disposed soil to be leveled and dressed in Ordinary Soil 49 Providing and laying granular sub-base material having P.I. not more than 6 including spreading in layers not exceeding 150 mm compactedthickness andconsolidationby8-10tonnepower rollerto required camber and grade including cost of water and hire charges of machinery including T&P with all lead (Compacted thickness to be measured).asper MoRTH specification table 400-1, 400-2, For grading-III with CBR value not less than 20.to attain 100% proctor density. 50 ConstructionofdryleancementconcreteSub-baseovera prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not tobelessthan10Mpaat7days, mixedinabatchingplant, transportedtosite,laidwithapaverwithelectronicsensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per IRC:SP:49-2014 51 Construction of un-reinforced, dowel jointed, plain cement concretepavementoverapreparedsubbasewith43grade cement @ 400 kg per cum, coarse and fine aggregate conformingtoIS383,maximumsizeofcoarseaggregatenot exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form paver, spread, compacted and finished in a continuous operation includingprovisionofcontraction,expansion,constructionand longitudinal joints, joint filler, separation membrane (125 micron), sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixturesasapproved,curingcompoundincludingvaccume dewatering process, finishing to lines and grades as per drawing CC design mix grade M30