Design, manufacturing, supply, installation & Commissioning of Skid Mounted Single Tube Reactor test set-up , Gas Connection Line Of Co2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of H2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of Co Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of N2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Manifold For Connecting 4 Co2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 8 H2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 Co Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 N2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Feed Tank-01 43A-Tt-01 Complete With Manual Feeding Option, Pressure Gauge, Level Transmitter, Temperature Element, Provisions Of N2 Blanketing And Necessary Accessories Viz. Isolation Valve, Pressure Safety Valve, Tubing/Hose, Drain Nozzle With Double Valve Systemetc. , Dosing Pumps 43A-Pa-01 Complete With Inlet/Outlet Isolation Valves For Transfer Of Liquid Feed, Tubing/Hoses, Strainers Etc. , Static Mixture (43A-Sm-01) , Auto Sample Handling And Switchover System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Manual Sampling Handling System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Feed Heater 43A-Fh-01: As Mentioned In Annexure T1 To T3 , Reactor 1 43A-Re-01: As Mentioned In Annexure T1 To T3 , Reactor 2 43A-Re-02: As Mentioned In Annexure T1 To T3 , Thermosyphon Loop: As Mentioned In Annexure T1 To T3 , Product Cooler 43A-Ee-01: As Mentioned In Annexure T1 To T3 , Water Chiller 43A-Wc-01: As Mentioned In Annexure T1 To T3 , Gas-Liquid Separator 43A-Vv-01: As Mentioned In Annexure T1 To T3 , Product Storage Tank-02 43A-Tt-02: As Mentioned In Annexure T1 To T3 , Skid For Single Tube Reactor Unit , All Tubing, Fittings, Valves, Tubing Work: As Mentioned In Annexure T1 To T3 , All Miscellaneous E&I Items: As Mentioned In Annexure T1 To T3 , Power And Control Panel, With Plc & Required Hardware, Software, Cables, Field Equipment And Overall Electrical Work As Mentioned In Annexure T1 To T3 , Installation, Testing And Commissioning Work: As Mentioned In Annexure T1 To T3 , Spares As Mentioned In Section K , Gas Detectors As Mentioned In Annexure – T1 To T3. , Line Heaters As Mentioned In Annexure – T1 To T3