Construction Of 5 Nos Of Percolation In Pottangi Block Supplying All Materials Labour T P For Construction Of 5 Nos Of 6.00 Mtr Dia 13.50 Mtr Depth Rr Stone Masonry Percolation Well With Mscover Etc. Complete In Connection With Pws Schemes To Kotia Pottangi Zone2 Bedagada Pukali Pottangi Zone1 Siura- 1 PWS to Kotia 2 CONSTRUCTION OF PERCOLATION WELL 6.0 mtr dia and 13.50 mtr depth 3 Supplying all materials, labour T&P for providing Earth work excavation in foundation in all kinds of soilwith all lead & lift including dressing the sides & levelling the bed of the foundation to required width & depth& stacking the excavated materials away from the working areas as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. 4 1st depth of 1.50m 5 2nd depth of 1.50m 6 3rd depth of 1.50m 7 4th depth of 1.50m 8 5th depth of 1.50m 9 6th depth of 1.50m 10 7th depth of 1.50m 11 8th depth of 1.50m 12 9th depth of 1.50m 13 Supplying all materials, labour, T&P providing rough dry Stone packingwith granite stone of 15cm. to 30cm (1 cuft) and above weighing 140 lbs. to 160 lbs./cuft quarried, free from weathered surface of approved quarry including splays cutting, moulding where necessary & including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 14 Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 15 Supplying all wirks labour T&P for making of concrete road with CC(1:2:4) work using 12 mm size hard blaxk broken granite stone chips including cost, conveyance, royalty & taxes etc, completed in all respect but excluding cost of MS rods or Tor steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer in Charge. 16 Supplying all labour T & P and materials for providing rigid and smooth centering and shuttering for RCC works including flase work and dismentalling them after casting etc complete as per the direction of the Engineer in Charge. 17 Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge. 18 Supplying all materials, labour, T&P and providing 20mm (3/4) thick cement plaster (1:4) finished smooth to out side of stone work after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P ,all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge. 19 Supplying all labour, T&P and materials and providing 20mm. thick cement flush pointing in cement mortar (1:3) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge. 20 Supplying all labour, T&P material for re-filling in foundation & plinth withexcavated earth after laying of pipes properly laid in stoney earth including watering and ramming as per the directionEngineer-in-charge. 21 Supplying all materials, labour, T&P and welding machine for making cover of the dry R.R Masoanry well with MS plate of 16 gauge including fixing of 100 x 100 mm angle iron main support and cross supports etc, all complete including painting the cover with anti corrosive paint and fixing rigidly to the top of well staining with provision of chain pully stand and door at the top below the pully stand including locking arrangementetc, all complete as per direction of the Engineer-in-charge. 22 Dewatering during excavation including hire, carriage, running charges of diesel pump. ( to be paid as per actual) 23 Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metalwith cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge. 24 PWS to Sisaguda 25 CONSTRUCTION OF PERCOLATION WELL 6.0 mtr dia and 13.50 mtr depth 26 Supplying all materials, labour T&P for providing Earth work excavation in foundation in all kinds of soilwith all lead & lift including dressing the sides & levelling the bed of the foundation to required width & depth& stacking the excavated materials away from the working areas as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. 27 1st depth of 1.50m 28 2nd depth of 1.50m 29 3rd depth of 1.50m 30 4th depth of 1.50m 31 5th depth of 1.50m 32 6th depth of 1.50m 33 7th depth of 1.50m 34 8th depth of 1.50m 35 9th depth of 1.50m 36 Supplying all materials, labour, T&P providing rough dry Stone packingwith granite stone of 15cm. to 30cm (1 cuft) and above weighing 140 lbs. to 160 lbs./cuft quarried, free from weathered surface of approved quarry including splays cutting, moulding where necessary & including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 37 Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 38 Supplying all wirks labour T&P for making of concrete road with CC(1:2:4) work using 12 mm size hard blaxk broken granite stone chips including cost, conveyance, royalty & taxes etc, completed in all respect but excluding cost of MS rods or Tor steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer in Charge. 39 Supplying all labour T & P and materials for providing rigid and smooth centering and shuttering for RCC works including flase work and dismentalling them after casting etc complete as per the direction of the Engineer in Charge. 40 Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge. 41 Supplying all materials, labour, T&P and providing 20mm (3/4) thick cement plaster (1:4) finished smooth to out side of stone work after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P ,all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge. 42 Supplying all labour, T&P and materials and providing 20mm. thick cement flush pointing in cement mortar (1:3) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge. 43 Supplying all labour, T&P material for re-filling in foundation & plinth withexcavated earth after laying of pipes properly laid in stoney earth including watering and ramming as per the directionEngineer-in-charge. 44 Supplying all materials, labour, T&P and welding machine for making cover of the dry R.R Masoanry well with MS plate of 16 gauge including fixing of 100 x 100 mm angle iron main support and cross supports etc, all complete including painting the cover with anti corrosive paint and fixing rigidly to the top of well staining with provision of chain pully stand and door at the top below the pully stand including locking arrangementetc, all complete as per direction of the Engineer-in-charge. 45 Dewatering during excavation including hire, carriage, running charges of diesel pump. ( to be paid as per actual) 46 Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metalwith cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge. 47 PWS to Bedagada 48 CONSTRUCTION OF PERCOLATION WELL 6.0 mtr dia and 13.50 mtr depth 49 Supplying all materials, labour T&P for providing Earth work excavation in foundation in all kinds of soilwith all lead & lift including dressing the sides & levelling the bed of the foundation to required width & depth& stacking the excavated materials away from the working areas as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. 50 1st depth of 1.50m 51 2nd depth of 1.50m 52 3rd depth of 1.50m 53 4th depth of 1.50m 54 5th depth of 1.50m 55 6th depth of 1.50m 56 7th depth of 1.50m 57 8th depth of 1.50m 58 9th depth of 1.50m 59 Supplying all materials, labour, T&P providing rough dry Stone packingwith granite stone of 15cm. to 30cm (1 cuft) and above weighing 140 lbs. to 160 lbs./cuft quarried, free from weathered surface of approved quarry including splays cutting, moulding where necessary & including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 60 Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 61 Supplying all wirks labour T&P for making of concrete road with CC(1:2:4) work using 12 mm size hard blaxk broken granite stone chips including cost, conveyance, royalty & taxes etc, completed in all respect but excluding cost of MS rods or Tor steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer in Charge. 62 Supplying all labour T & P and materials for providing rigid and smooth centering and shuttering for RCC works including flase work and dismentalling them after casting etc complete as per the direction of the Engineer in Charge. 63 Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge. 64 Supplying all materials, labour, T&P and providing 20mm (3/4) thick cement plaster (1:4) finished smooth to out side of stone work after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P ,all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge. 65 Supplying all labour, T&P and materials and providing 20mm. thick cement flush pointing in cement mortar (1:3) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge. 66 Supplying all labour, T&P material for re-filling in foundation & plinth withexcavated earth after laying of pipes properly laid in stoney earth including watering and ramming as per the directionEngineer-in-charge. 67 Supplying all materials, labour, T&P and welding machine for making cover of the dry R.R Masoanry well with MS plate of 16 gauge including fixing of 100 x 100 mm angle iron main support and cross supports etc, all complete including painting the cover with anti corrosive paint and fixing rigidly to the top of well staining with provision of chain pully stand and door at the top below the pully stand including locking arrangementetc, all complete as per direction of the Engineer-in-charge. 68 Dewatering during excavation including hire, carriage, running charges of diesel pump. ( to be paid as per actual) 69 Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metalwith cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge. 70 PWS to Pottangi 71 CONSTRUCTION OF PERCOLATION WELL 6.0 mtr dia and 13.50 mtr depth 72 Supplying all materials, labour T&P for providing Earth work excavation in foundation in all kinds of soilwith all lead & lift including dressing the sides & levelling the bed of the foundation to required width & depth& stacking the excavated materials away from the working areas as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. 73 1st depth of 1.50m 74 2nd depth of 1.50m 75 3rd depth of 1.50m 76 4th depth of 1.50m 77 5th depth of 1.50m 78 6th depth of 1.50m 79 7th depth of 1.50m 80 8th depth of 1.50m 81 9th depth of 1.50m 82 Supplying all materials, labour, T&P providing rough dry Stone packingwith granite stone of 15cm. to 30cm (1 cuft) and above weighing 140 lbs. to 160 lbs./cuft quarried, free from weathered surface of approved quarry including splays cutting, moulding where necessary & including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 83 Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 84 Supplying all wirks labour T&P for making of concrete road with CC(1:2:4) work using 12 mm size hard blaxk broken granite stone chips including cost, conveyance, royalty & taxes etc, completed in all respect but excluding cost of MS rods or Tor steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer in Charge. 85 Supplying all labour T & P and materials for providing rigid and smooth centering and shuttering for RCC works including flase work and dismentalling them after casting etc complete as per the direction of the Engineer in Charge. 86 Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge. 87 Supplying all materials, labour, T&P and providing 20mm (3/4) thick cement plaster (1:4) finished smooth to out side of stone work after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P ,all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge. 88 Supplying all labour, T&P and materials and providing 20mm. thick cement flush pointing in cement mortar (1:3) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge. 89 Supplying all labour, T&P material for re-filling in foundation & plinth withexcavated earth after laying of pipes properly laid in stoney earth including watering and ramming as per the directionEngineer-in-charge. 90 Supplying all materials, labour, T&P and welding machine for making cover of the dry R.R Masoanry well with MS plate of 16 gauge including fixing of 100 x 100 mm angle iron main support and cross supports etc, all complete including painting the cover with anti corrosive paint and fixing rigidly to the top of well staining with provision of chain pully stand and door at the top below the pully stand including locking arrangementetc, all complete as per direction of the Engineer-in-charge. 91 Dewatering during excavation including hire, carriage, running charges of diesel pump. ( to be paid as per actual) 92 Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metalwith cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge. 93 PWS to Siura 94 CONSTRUCTION OF PERCOLATION WELL 6.0 mtr dia and 13.50 mtr depth 95 Supplying all materials, labour T&P for providing Earth work excavation in foundation in all kinds of soilwith all lead & lift including dressing the sides & levelling the bed of the foundation to required width & depth& stacking the excavated materials away from the working areas as directed by the Engineer-in-charges complete as per specification & direction of the E-I-C. 96 1st depth of 1.50m 97 2nd depth of 1.50m 98 3rd depth of 1.50m 99 4th depth of 1.50m 100 5th depth of 1.50m 101 6th depth of 1.50m 102 7th depth of 1.50m 103 8th depth of 1.50m 104 9th depth of 1.50m 105 Supplying all materials, labour, T&P providing rough dry Stone packingwith granite stone of 15cm. to 30cm (1 cuft) and above weighing 140 lbs. to 160 lbs./cuft quarried, free from weathered surface of approved quarry including splays cutting, moulding where necessary & including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 106 Supplying all labour, T&P and materials and providing R.R. H.G.Stone masonary with C.M.(1:6) in foundation and plinth with granite stone including cost, conveyance, labour, tax, royalty of materials to worksite complete as directed by the Engineer-in-charge. 107 Supplying all wirks labour T&P for making of concrete road with CC(1:2:4) work using 12 mm size hard blaxk broken granite stone chips including cost, conveyance, royalty & taxes etc, completed in all respect but excluding cost of MS rods or Tor steel and binding wires of 18 to 20 gauge as per specification and direction of the Engineer in Charge. 108 Supplying all labour T & P and materials for providing rigid and smooth centering and shuttering for RCC works including flase work and dismentalling them after casting etc complete as per the direction of the Engineer in Charge. 109 Straightening bend up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor Steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works including cost, conveyance and taxes of M.S. Rods or Tor Steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc, complete in all floors as per specification and direction of the Engineer-in-charge. 110 Supplying all materials, labour, T&P and providing 20mm (3/4) thick cement plaster (1:4) finished smooth to out side of stone work after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P ,all taxes and royalties etc., complete in all respect in all floors as per specification and direction of the Engineer-in-charge. 111 Supplying all labour, T&P and materials and providing 20mm. thick cement flush pointing in cement mortar (1:3) for stone workand conveyance of all materials as per specification and direction of the Engineer-in-charge. 112 Supplying all labour, T&P material for re-filling in foundation & plinth withexcavated earth after laying of pipes properly laid in stoney earth including watering and ramming as per the directionEngineer-in-charge. 113 Supplying all materials, labour, T&P and welding machine for making cover of the dry R.R Masoanry well with MS plate of 16 gauge including fixing of 100 x 100 mm angle iron main support and cross supports etc, all complete including painting the cover with anti corrosive paint and fixing rigidly to the top of well staining with provision of chain pully stand and door at the top below the pully stand including locking arrangementetc, all complete as per direction of the Engineer-in-charge. 114 Dewatering during excavation including hire, carriage, running charges of diesel pump. ( to be paid as per actual) 115 Supplying all labour, T&P and materials and providing Cement Concrete (1:4:8) in foundation and plinth with 4cm. H.G.Stone metalwith cost, conveyance, royalty, taxes of all materials required for the work as per specification & direction of the Engineer-in-charge.