}

Tender For Annual Maintenance Contract For Electrical Equipments Of Unit-7 And 8, Ptps, Panipat For A Period Of Two Years With An Extension Period Of Three Months., khurd-Haryana

Haryana Power Generation Corporation Limited has published Tender For Annual Maintenance Contract For Electrical Equipments Of Unit-7 And 8, Ptps, Panipat For A Period Of Two Years With An Extension Period Of Three Months.. Submission Date for this Tender is 23-01-2025. Electrical Products Tenders in khurd Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

46627973
Corrigendum : Tender For Annual Maintenance Contract For Electrical Equipments Of Unit-7 And 8, Ptps, Panipat For A Period Of Two Years With An Extension Period Of Three Months.
Open Tender
Indian
Haryana
Khurd
23-01-2025

Tender Details

Annual Maintenance Contract For Electrical Equipments Of Unit-7 And 8, Ptps, Panipat For A Period Of Two Years With An Extension Period Of Three Months.- 1 Part-A (1st year): Annual Maintenance Contract for Electrical Equipments of Unit-7 and 8, PTPS, Panipat 2 Part-A (2nd Year): Annual Maintenance Contract for Electrical Equipments of Unit-7 and 8, PTPS, Panipat 3 Part-B (1st year) (1.1) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To and Fro) for 5.6 kW to 20 kW 4 Part-B (1st year)(1.2) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To and Fro) for 20.1 kW to 50 kW 5 Part-B (1st year) (1.3) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To and Fro) for 50.1 kW to 100 kW 6 Part-B (1st year) (1.4) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To andFro) for 100.1 kW to 170 kW 7 Part-B (1st year) (2.1) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 500 kW 8 Part-B (1st year) (2.2) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 501 kW to 1000 kW 9 Part-B (1st year) (2.3) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 1001 kW to 2000 kW 10 Part-B (1st year) (2.4) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2001 kW to 2400 kW 11 Part-B (1st year) (2.5) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2401 kW to 4600 kW 12 Part-B (1st year) (3.1) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 500 kW 13 Part-B (1st year) (3.2) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 501 kW to 1000 kW 14 Part-B (1st year) (3.3) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 1001 kW to 2000 kW 15 Part-B (1st year) (3.4) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2001 kW to 2400 kW 16 Part-B (1st year) (3.5) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2401 kW to 4600 kW 17 Part-B (1st year) (4.1) Replacement of bearing (bearing can be of DE or NDE or Both) of HT motor up to 500 KW 18 Part-B (1st year) (4.2) Replacement of bearing (bearing can be of DE or NDE or Both) up to 501 KW to 1000 KW. 19 Part-B (1st year) (4.3) Replacement of bearing (bearing can be of DE or NDE or Both) up to 1001 kW to 2000 kW. 20 Part-B (1st year) (4.4) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2001 kW to 2400 kW. 21 Part-B (1st year) (4.5) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2401 kW to 4600 kW. 22 Part-B (1st year) (5.1) Shifting, Installation and commissioning of service transformer (Oil/Dry Type) of capacity above 200kVA to 2500kVA, from one site to other site within Plant (both side) 23 Part-B (1st year) (5.2) Shifting, Installation and commissioning of ESP, HVR transformer from one site to other site within Plant including lowering down to ground floor and loading up to the plinth of transformer. (Both side) 24 Part-B (1st year) (6.1) Dehydration/ filtration of oil in Service transformer 25 Part-B (1st year) (6.2) Dehydration/ filtration of oil in HVR Transformer 26 Part-B (1st year) (7.a.1) Laying of underground control cables 2.5 Sq mm up to 10 Cores (depth Max upto 3 feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable. 27 Part-B (1st year) (7.a.2) Laying of underground of control cables 2.5 Sq mm above 10 Cores (depth Max upto 3feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable 28 Part-B (1st year) (7.b.1)Laying of underground of power cables 2C/3C/4C up to size 25mm2 29 Part-B (1st year) (7.b.2)Laying of underground of power cables 2C/3C/4C size 25.1mm2 to 70mm2 30 Part-B (1st year) (7.b.3)Laying of underground of power cables 2C/3C/4C size 95.1mm2 to 150mm2 31 Part-B (1st year) (7.b.4)Laying of underground of power cables 2C/3C/4Csize 150.1mm2 to 240mm2 32 Part-B (1st year) (7.b.5)Laying of underground of power cables 2C/3C/4C above size 240mm2 33 Part-B (1st year) (8.1)Laying ofpower cables in cable trench/overhead 1C/2C/3C/4Csize above 95 mm2 to 240mm2 34 Part-B (1st year) (8.2)Laying ofpower cables in cable trench/overhead 1C/2C/3C/4C above size 240mm2 35 Part-B (1st year) (9)Painting of all Electrical equipments i.e. Motors, transformers, panels, cable structure etc. on basis of per square mtr. Enamel paint and consumables of reputed make will be in the scope of the contractor. 36 Part-B (1st year) (10.1)Supply of man power Skilled - A(unit asMandays) 37 Part-B (1st year) (10.2)Supply of man power Semi-skilled - A (unit as Mandays) 38 Part-B (2nd year) (1.1) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To and Fro) for 5.6 kW to 20 kW 39 Part-B (2nd year)(1.2) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To and Fro) for 20.1 kW to 50 kW 40 Part-B (2nd year) (1.3) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To and Fro) for 50.1 kW to 100 kW 41 Part-B (2nd year) (1.4) Opening of foundation boltsincluding removal and installation of motor end coupling andshifting of new as well as damaged LT motor(within plant) both sides (To andFro) for 100.1 kW to 170 kW 42 Part-B (2nd year) (2.1) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 500 kW 43 Part-B (2nd year) (2.2) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 501 kW to 1000 kW 44 Part-B (2nd year) (2.3) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 1001 kW to 2000 kW 45 Part-B (2nd year) (2.4) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2001 kW to 2400 kW 46 Part-B (2nd year) (2.5) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2401 kW to 4600 kW 47 Part-B (2nd year) (3.1) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 500 kW 48 Part-B (2nd year) (3.2) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 501 kW to 1000 kW 49 Part-B (2nd year) (3.3) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 1001 kW to 2000 kW 50 Part-B (2nd year) (3.4) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2001 kW to 2400 kW 51 Part-B (2nd year) (3.5) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2401 kW to 4600 kW 52 Part-B (2nd year) (4.1) Replacement of bearing (bearing can be of DE or NDE or Both) of HT motor up to 500 KW. 53 Part-B (2nd year) (4.2) Replacement of bearing (bearing can be of DE or NDE or Both) up to 501 KW to 1000 KW. 54 Part-B (2nd year) (4.3) Replacement of bearing (bearing can be of DE or NDE or Both) up to 1001 kW to 2000 kW. 55 Part-B (2nd year) (4.4) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2001 kW to 2400 kW 56 Part-B (2nd year) (4.5) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2401 kW to 4600 kW 57 Part-B (2nd year) (5.1) Shifting, Installation and commissioning of service transformer (Oil/Dry Type) of capacity above 200kVA to 2500kVA, from one site to other site within Plant (both side) 58 Part-B (2nd year) (5.2) Shifting, Installation and commissioning of ESP, HVR transformer from one site to other site within Plant including lowering down to ground floor and loading up to the plinth of transformer. (Both side) 59 Part-B (2nd year) (6.1) Dehydration/ filtration of oil in Service transformer 60 Part-B (2nd year) (6.2) Dehydration/ filtration of oil in HVR Transformer 61 Part-B (2nd year) (7.a.1) Laying of underground control cables 2.5 Sq mm up to 10 Cores (depth Max upto 3feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable. 62 Part-B (2nd year) (7.a.2) Laying of underground of control cables 2.5 Sq mm above 10 Cores (depth Max upto 3feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable 63 Part-B (2nd year) (7.b.1)Laying of underground of power cables 2C/3C/4C up to size 25mm2 64 Part-B (2nd year) (7.b.2)Laying of underground of power cables 2C/3C/4C size 25.1mm2 to 70mm2 65 Part-B (2nd year) (7.b.3)Laying of underground of power cables 2C/3C/4C size 95.1mm2 to 150mm2 66 Part-B (2nd year) (7.b.4)Laying of underground of power cables 2C/3C/4Csize 150.1mm2 to 240mm2 67 Part-B (2nd year) (7.b.5)Laying of underground of power cables 2C/3C/4C above size 240mm2 68 Part-B (2nd year) (8.1)Laying ofpower cables in cable trench/overhead 1C/2C/3C/4Csize above 95 mm2 to 240mm2 69 Part-B (2nd year) (8.2)Laying ofpower cables in cable trench/overhead 1C/2C/3C/4C above size 240mm2 70 Part-B (2nd year) (9)Painting of all Electrical equipments i.e. Motors, transformers, panels, cable structure etc. on basis of per square mtr. Enamel paint and consumables of reputed make will be in the scope of the contractor. 71 Part-B (2nd year) (10.1)Supply of man power Skilled - A (unit as Mandays) 72 Part-B (2nd year) (10.2)Supply of man power Semi-skilled - A (unit as Mandays)

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 03-01-2025 Corrigendum-I for Annual Maintenance Contract for maintenance of electrical equipments of 250MW, Unit-7 and 8, PTPS, Panipat Date 13-01-2025
2 16-01-2025 Corrigendum-II for Annual Maintenance Contract for maintenance of electrical equipments of 250MW, Unit-7 and 8, PTPS, Panipat. Date 23-01-2025

Key Value

Document Fees
INR 1180 /-
EMD
INR 139741.0 /-
Tender Value
INR 69.87 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail