}

Tender For Spr-27022069_Design Engineering For Revamping At Talegaon., pune-Maharashtra

Arcelor Mittal Nippon Steel India Limited has published Tender For Spr-27022069_Design Engineering For Revamping At Talegaon.. Submission Date for this Tender is 19-12-2024. Civil Consultancy Tenders in pune Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

46612975
Tender For Spr-27022069_Design Engineering For Revamping At Talegaon.
Open Tender
Indian
Maharashtra
Pune
19-12-2024

Tender Details

Tender For Spr-27022069_Design Engineering For Revamping At Talegaon. 27022069 10 10 10 ENGINEERING SERVICES FOR SERVICE CENTERS 1 LO Email : ASHISH.DUBEY5@AMNS.IN Contact : Name : Ashish Dubey Item Details : A DESIGN ENGINEERING <(>&<)> DETAILS Service Code Description Area Considered Unit Rate per Unit Amount Payments % At release of GFC Detailed Engineering Approved Drawings Remarks 3002557 1 Civil, Structural <(>&<)> Elevation Works 3,670.93 S.M. - 25% 2 Interior Works 1,775.20 S.M. - 20% 3 Electrical <(>&<)> Data Networking (IT) Works 2,905.93 S.M. - 15% 4 HVAC Works 1,604.20 S.M. - 10% 5 Plumbing Works 140.80 S.M. - 5% 6 Site Development Works 6,330.00 S.M. - 10% 7 Compound Walls 2,400.00 R.M. - 5% 8 After work complition <(>&<)> Handover project complition documents (sr no-1 to 7 all activity) 10% Total - 100% SCOPE OF WORKS - DETAIL DESIGN ENGINEERING <(>&<)> DETAILING A Architecture and Structural detail Designs Drawings 1 Architectural Drawings - Civil Works 2 Structural Drawings - RCC <(>&<)> Steel Structure Works 3 Toilet <(>&<)> Plumbing Works 4 Elevation Works B Interior Works detail design Drawings 1 On-site Works - Partitions, Doors, Ceiling, Colour, Upholstery, Graphics, etc. 2 Modular Works - Readymade Furniture, Chairs, etc. C MEP detail design Drawings 1 Electrical Works 2 Data <(>&<)> Networking Works 3 HVAC Works 4 Plumbing Works 5 Fire Pump Room Works D Site Development details design drawing Works 1 Compound Wall Works 2 Road Reworks 3 Landscape Works 4 Parking Area Works E Works Included 1 All Working Drawings ,Detail IFC Drawings , revision as per site requirement <(>&<)> all drg IFC approved by AMNS. 2 All Working Drawings <(>&<)> Detail Drawings to match 3D views. To revise 3D views, if the details differ due to working or site conditions. 3 Detail floor plans, elevations, sections <(>&<)> any other input drawing required for further detailing as per the approved scheme. 4 Preparation of execution GFC drawings for interior works and relevant drawings to all vendors 5 Finalising of work specifications, advising the client regarding the timing and schedule of procurement of bulk/long lead materials 6 Submitting working drawings to Vendor after approvals from Client. Getting the Shop-Drawings prepared by the vendor for specific required works (like structural works, PEB works, elevation works, etc. as per industry standards), review <(>&<)> approval of shop drawings. 7 Preparation of all Co-ordination Drawings (Civil, Interior, Electric, Data, HVAC, Plumbing, etc.) before start of works. a. Electrical And Lighting System b. HVAC systems Page 2 of 3 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd ( PUNE) Gat No 437 & 442, Golechiwadi, Ambi-Nigade Road,,MIDCTalegaon, Dist PUNE,410507,Maharashtra,India GSTIN 27AAACE1741P1ZH PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000125459 Date 09.12.2024 Submission Date 19.12.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Annapurna Kolluru Contact Email ANNAPURNA.KOLLURU@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details c. Fire Hydrant system d. Fire detection <(>&<)> alarm system e. Water storage <(>&<)> distribution System f. BMS System on specific mention 8 Preparation of drawing release schedule for entire scope in conjunction with signed off schedule of project execution. 9 Coordination with package vendors/suppliers, interfacing with existing setup for mechanical, electrical, Water lines, HVAC requir ements for receiving the facilities and incorporation of the requirements in the detailed execution drawings. 10 Preparation and submission of ‘AS BUILT’ drawings after works completion. Notes: 1 Detailed Scope of Work for Design Engineering <(>&<)> details attached. 2 Detailed Scope of Work for Project Management Consultancy attached. 3 Area Statement attached for reference. 4 All Taxes, inc. GST, shall be extra. 5 Above SOW Including selection of all material for revamping projects <(>&<)> External shop visits if required as per site. 6 Detail design Engineering works shall be completed withing 4 months (Civil, Structural <(>&<)> Elevation Works,Interior Works,Electrical <(>&<)> Data Networking (IT) Works,HVAC Works, Plumbing Works, Site Development Works,Compound Walls) from the date of issuance of work order. 7 Above SOW may be chnages as per actual site requirement. Item Note : 2 27022069 20 20 10 PROJECT MANAGEMENT CONSULTANCY 7 LE Email : ASHISH.DUBEY5@AMNS.IN Contact : Name : Ashish Dubey Item Details : B PROJECT MANAGEMENT CONSULTANCY - MONTHLY CHARGES Service Code Description Duration (approx.) Unit Rate per Unit Amount Payments % Remarks Rate per unit is for 1 person per month 3018642 1 Civil Works/ Interior Works/ MEP Works including site supervision as per SOW, External site visit required as per site pr ogress, travelling, accommodation, required medical, food, Project handover etc. Working hours <(>&<)> holidays whil project location shall be as per AMNS calendar. Unit = AU=Month Last month or days of a month billing shall be till the site completion records submisison to client with site closure report. Senior Engineer - @7 years experience 18 Month - 100% Payable every 02nd Date of Month as per attendance sheet on prorata basis. SCOPE OF WORKS - PROJECT MANAGEMENT CONSULTANCY (PMC) A PMC to Include: 1 Civil Construction Works. 2 Interior Works. 3 MEP Works - Electrical, Data, HVAC, Plumbing Works. B During Tendering process: 1 To Prepare Tender Documents. To include - Architectural Tender Drawings, BOQ, Specifications listing, Clients Documents, Safety Manuals, etc. 2 To study <(>&<)> review all the Tender Drawings alongwith Specifications. To assist Client in selection of material, if so requri ed by Client. 3 To assist Client in selection of Vendor, if required by Client. 4 To prepare Master Schedule of Works. To include Works Schedule <(>&<)> Cost Schedule before start of works in discussion with the Architect, Client <(>&<)> Vendor. C During Works Execution: 1 Full time supervision during the works execution. 2 Check issuance of Good for Construction Drawings from Design teams, Page 3 of 3 ArcelorMittal Nippon Steel India Limited AM/NS India Ltd ( PUNE) Gat No 437 & 442, Golechiwadi, Ambi-Nigade Road,,MIDCTalegaon, Dist PUNE,410507,Maharashtra,India GSTIN 27AAACE1741P1ZH PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000125459 Date 09.12.2024 Submission Date 19.12.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Annapurna Kolluru Contact Email ANNAPURNA.KOLLURU@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details with approvals from Client. 3 To ensure the progress of the works. To include - Qualitative Works <(>&<)> Quantitative Works. 4 To capture Specifications Variations, Drawings Variations, etc. To include change note management with approvals from Client <(>&<)> Architect. 5 Monitoring of the schedule and giving the weekly / monthly basis for Management Review. To provide mitigation plan/s for any delay casued. Regularly assess progress of project in terms of plan vs actual and analyse gap if any. Prepare corrective action plan in consultation with Architect, Client, Contractors and follow up for implementation. 6 Daily on site monitoring of safety norms adherence , quality of material and workmanship and work progress , 6 days a week . AMNS weekly off and holiday schedule is applicable . Personal leaves are to be compensated with prior mutual understanding except emergency. Absence more than 3 working days together, if unavoidable, then it’s to be compensated with alternate arrangement that maintains continuity of monitoring and management . 7 Use result oriented and value added approach to achieve project objectives 8 Support in overcoming operational issues in consultation with Seco project team , safety and compliance team , Architect or designers 9 Conducting review meeting with contractors to discuss issues and arrange feasible resolution . Publish MOM and track implementation . 10 Conducting weekly update meeting to apprise steering committee members on progress of project in terms of safety , quality , timeline 11 Measurement and bill certification. Contractor’s Bill Certification <(>&<)> variance analysis vis-à-vis PO/finalized contract <(>&<)> successful resolution of all open issues. This shall be done only if required by the Client. D After Works Completion: 1 To get the As-Built Drawings from Design Teams and prepare documentation for Clients Records. 2 Maintaining documentation for quality and financial audits. 3 Managing closure and handover documents. Prepare project closure report. Notes: 1 Detailed Scope of Work for Design Engineering <(>&<)> details attached. 2 Detailed Scope of Work for Project Management Consultancy attached. 3 Area Statement attached for reference. 4 All Taxes, inc. GST, shall be extra. 5 Above SOW Including selection of all material for revamping projects <(>&<)> External shop visits if required as per site. 6 Detail design Engineering works shall be completed withing 4 months (Civil, Structural <(>&<)> Elevation Works,Interior Works,Electrical <(>&<)> Data Networking (IT) Works,HVAC Works, Plumbing Works, Site Development Works,Compound Walls) from the date of issuance of work order. 7 Above SOW may be chnages as per actual site requirement.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail