Providing Bt Road At Chettiswaran Kovil Street, Perumal Koil Street, Old Police Station Street, Kuppunayakkan Street And Katchiappachetti Street In Vikkiravandi Town Panchayat. , Providing For Dismantling Plain Cement Concrete Including Cost And Conveyance Of All Labour Charges As Per Std Specification , Providing And Laying, Spreading And Compacting Graded Stone Aggregates To Wet Mix Macadam 250Mm Thick Specification Including Premixing The Materials With Water At Omc In Mechnanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers With Pavers In Sub Base/ Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Acheive The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc.,Complete As Per Clause 406 Of Morth , Providing And Laying Prime Coat Over Wbm/ Wmm Surface Using 7Kg Of Emulsion Bitumen (Ssi)Per10 Sqm For Preparatory To Another Bituminous Construction Over It, Including Cost Of Material,Labour Charges, Rentals For Machinery,Fuel And All Other Incidental Charges Etc., Complete As Per Clause 502 Of Morth Rev-5 , Providing And Laying Tack Coat Over Wbm/ Wmm Surface (Treated With Primer) Using 2.50 Kg Of Bitumen Emulsion (Rs1)Per10 Sqm For Preparatory To Another Bituminous Construction Over It, Including Cost Of Material,Labour Charges, Rentals For Machinery,Fuel And All Other Incidental Charges Etc., Complete As Per Clause 503 Of Morth Rev-5 , Providing And Laying 50Mm Consolidated Thick Dense Bituminous Macadam Using 0.24Cum Of 26.50-13.20Mm,0.25Cum Of 13.20-2.36Mm And 0.23Cum Of 2.36Mm & Below And With 53.20Kgs Of Vg30/Vg40 Bitumen For Premixing Per 10Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregate To Required Temperature And Mixing The Min Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Conveying The Mix By Tipper Trucks To Work Site, Spreading The Mix To Uniform Thickness Of 50Mm With Paver To The Specified Grades And Cross Sections And Compacted By Vibratory/Pneumatic Roller To The Required Density Etc., Including Labour For Attending To Paver At Site Etc., Including Hire Charges And Fuel Charges For 20-30T Cmp With Bitumen Boiler, Tipper Trucks, Paver Finisher/9M Paver Finisher, Vibratory/Pneumatic Rollers And All Other Tools And Plant Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clause 505 Morth Rev-5 , Providing And Laying Bituminous Concrete 30Mm Consolidated Thick Using 0.13 Cum Of 19.00 – 9.50Mm,0.17 Cum Of 9.50-2.36Mm And 0.26 Cum Of2.36 Mm & Below With 46.28 Kg Of 60/70 Grade Bulk Bitumen And 4.02 Kg Of Shreded Plastic Waste For Premixing Per 10 Sqm Including Cost And Conveyance Of All Materials To Cmp Site, Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20 – 30 Ton Capacity, Conveying The Mix By Tipper Trucks To Paver Site, Spreading Themix To Uniform Thickness Of 40 Mm With Mechanical Pavers To The Specified Grades And Cross Sections And Compaction By Vibratory/Pneumatic Rollers To The Required Density Etc., Including Labour For Loading Bitumen Into Bitumen Tank And Metal To Feeder Unit,Labour For Attending To Paver Site Etc., Including Hire Charges And Fuel Charges For 20 – 30 Ton Cmp With Bitumen Boiler Tipper,Trucks, Paver Finisher/9M,Vibrator Rollers And All Other Tools And Plants Required,Including All Other Incidental Charges Etc., Complete As Per Standard Specification Using Cmp Clause 507 Of Morth Rev-5