Name of Work: foRrh; o\"kZ 2024&25 esa dqjhZdwik :iliqj ls lqtk;rx<+ uknZu ok;k ua0 vk\"kk ekxZ ij uohuhdj.k dk dk;ZA
Sl. No.
Item Description
1
PART-A ROAD WORKWBM (G-3) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in required thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required density grading 3 as per technical specification clause-405
2
Providing and applying tack coat with bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleanced as per Technical Specification Clause 503. (Including cost of Bitumen)
3
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using VG-10 Bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.(Including cost of Bitumen)
4
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingType C as per Technical Specification Clause 510(Including cost of Bitumen)
5
PART-B MAINTENANCE WORKMaintenance work for second year
6
Maintenance work for third year
7
Maintenance work for fourth year
8
Maintenance work for fifth year
9
Note - 1. Cost of maintenance of road for five years will be paid as per G.O. No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Date 16-01-2024 2. The departmental road roller if spare, shall be made available to the contructior at site @ Rs. 2500 per day shall be made from contractor\"s bell for idle period 3.Payment of maintenance shall be made as per final execution of civil work wich may vary from the BOQ.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.