| 1 | Excavating and removing silt from storm water drain of 280 cm average girth, depth of silt and mud from 5 cm to 20 cm and averaging 12.5 cm (lying uneven on bottom and sides of drains) including from all sorts of grass bushes and under growth hedge/ grass and removing all rubbish material obtained from drain cleaning to a distance exc. 1.50 km but not exc. 5 km away from site, complete all as specified and as directed by Engineer in Charge.Note: (a) Works shall be executed as direction given by Engineer in Charge in Works Site order Book. Penalty @Rs 15 Per RM shall be recovered if work not executed within 48 hours after written order given by Engineer in Charge.(b) Site order book shall be produced along with every RAR and Final Bill for payment. |
| 2 | All as per srl item No. 1 (here-in-before) but depth of silt and mud from 20cm to 30 cm and averaging 25 cm complete all as specified and as directed by Engineer in Charge.Note: (a) Works shall be executed as direction given by Engineer in Charge in Works Site order Book. Penalty @Rs 15 Per RM shall be recovered if work not executed within 48 hours after written order given by Engineer in Charge.(b) Site order book shall be produced along with every RAR and Final Bill for payment. |
| 3 | Dismantling ofBricks or Brick tiles (laid flat or on edge) as in floors, channels, kerbs, aprons etc each layer laid dry and pointed and removing from site complete all as specified and as directed. |
| 4 | M&L for Bricks, sub class \"B\" , laid flat in floors, using old size bricks, laid dry and pointed in cement and sand mortar (1:3) etc complete all as specified and directed by Engineer-in-charge after demolition of old brick floors, Channels etc complete all as specified and directed by Engineer in Charge. |
| 5 | M&L for Bricks, sub class \"B\" , laid on edge in floors, using old size bricks, laid dry and pointed in cement and sand mortar (1:3) etc complete all as specified and directed by Engineer-in-charge after demolition of old brick floors, Channels etc |
| 6 | Demolition of Cement concrete of existing pavements (un-reinforced) of any description and in any position of runway or pavements and removing demolished material from site to a distance exceeding 1.50 Km and not exceeding 5 Km and depositing where directed by Engineer-in-Charge. |
| 7 | M&L for Cement Concrete (1:3:6) type C-1 using 20 mm graded stone agreate, as in surface channel or drain etc complete all as specified and directed by Engineer-in-charge. |
| 8 | SGA Ploughing by tractor with driver, in air field maintenance and levelling to required gradient complete all asdirected by Engineer-in-Charge.Note:(a) Works shall be executed as direction given by Engineer in Charge in Works Site order Book. (b) Contractor shall submit Gate passes of the Tractor in & out from the Technical area/ Air Force Main Gate alonh with time and duration remained inside Technical area duly signed by Engineer-in-Charge, JE & Contractor completely mentioning the vehicel Registration number and all the documents should be submitted with RAR and Final Bill for Payment. |
| 9 | Raking out joints/ pointing scrubbing down with water etc from bricks/ brick tiles work built in cement and sand mortar, laid flat, in floor, surface channels etc complete all as specified and directed by Engineer-in-Charge. |
| 10 | All as per srl item 9 above but laid on edge etc complete all as specified and directed by Engineer-in-Charge. |
| 11 | M&L for Flush pointing to bricks laid flat or brick tiles in paving/ channel etc in cement and sand mortar (1:3) etc complete all as specified and directed by Engineer-in-Charge. |
| 12 | All as per srl item 11 above but laid on edge etc complete all as specified and directed by Engineer-in-Charge. |