}

Expression Of Interest (Eoi) For Rcil Upsldc Bid On Back To Back Basis, Lucknow-Uttar Pradesh

Government Departments has published Expression Of Interest (Eoi) For Rcil Upsldc Bid On Back To Back Basis. Submission Date for this Tender is 04-12-2024. Computer Server Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

46423521
Expression Of Interest (Eoi) For Rcil Upsldc Bid On Back To Back Basis
EOI
Indian
Uttar Pradesh
Lucknow
04-12-2024

Tender Details

Expression of interest (eoi) for rcil upsldc bid on back to back basis - Servers for Core Applications:- Specs: S1022 - 2*12C, 24 Core activated, 1 TB RAM (16*64 GB), 4*800GB NVMe, 4*2P 10G SR Optics+ Adapter, 4*2P 32G Fiber Adapter, AIX Standard-24C, PHA Standard - 24C, PVM, HMC + TFT for Management (1 DC and 1 DR) SAN Storage :- Storage with 12x9.6TB FCM4 or equivalent + 512 GB or better Cache, 8* 32Gbps FC Ports = 80 TB Usable Space. Minimum RAID06 to be configured and keep provision for hot spare drives. Storage Management software should be inbuilt / provided along with the software. SAN Switch :- SAN switch with 8*16 Gbps and 16 x 32Gbps FC ports OR 24* 32Gbps by checking all device compatibility with required loaded SFP+ 24*minimum 5m FC cable, Ensure a minimum of 24 ports Switch. The assessment of ports should be done meticulously, considering the entire infrastructure and including the migration of the existing setup. Backup Storage :- Ensure a minimum of 28TB (13 or 14 SAS drives) of usable space with a 32GB cache and 8*16Gbps/32Gbps Fiber Channel (FC) ports. RAID06 should be configured and keep hot spare drive. The licensing should be evaluated carefully. Note that the backup storage will be separate from the primary Server SAN storage. Additionally, there should be provisions to double the storage capacity if required in the future. Servers for Non-Core Applications/ Workload :- Dual Intel 5th Gen Xeon Gold/Platinum 8562Y+ 2.8 GHz 60MB Cache, 32 Cores or Higher processor * 2 sockets = 64Cores /1024 Gb Memory / OS Boot Drive – 2 X 1.92TB SSD or higher SSD / Network Port - Quad Port 1 GbE BASE – T & Six Port 10G Fiber MM with required Optics and cables / Dual Port 16G/32G FC HBA / Management port dedicated 1 G base- T. Server Mgt software License from same OEM. Storage for Logs :- 10 TB Usable Space for logger backup with RAID configured with dual port connectivity on both Primary and Secondary SAN Switch. (Extendable up to 20 TB in future) Tape Library: - Tape Library with min 10G Fiber Connectivity with backup software. 2xLTO9 HH tape drives +2x 25m OM3 LC cables+ 32xLTO9 cartridges unlabeled + 8xCleaning cartridges. Tape cartridges fireproof safe: - Two fireproof safes should be installed at both the DC and DR locations for the purpose of backup tape storage. Software License Linux Operating System :- Supporting enterprise-grade Linux operating system with comprehensive premium support services. The chosen OS must meet stringent enterprise standards, Licensed, OEM based SLA based Premium support with regular security patches. Windows OS :- Windows Server 2022 Standard Edition 64 Core for Non-Critical Server VMs DC: 64 cores*3 =192 cores DR: 64 cores*2 =128 cores Virtualization Software: - Hypervisor Standard Subscription for all non-core application physical server and Hypervisor Manager standard (one for DC and one at NDR) 6-year Subscription and premium support. No. of licenses shall be as per the physical cores for non-core servers mentioned item no.5 (Servers for Non-Core Applications/ Workload). DC: 64 cores*3 =192 cores. DR: 64 cores*2 =128 cores Total: 320 Oracle DB :- Oracle Enterprise Editions for Production Database 1. Production DB (DC and DR) = 6 2. RAC (DC)- 4 3. Active Data (DC and DR) = 6 4. Partitioning (DC and DR)- 6 Oracle Database Standard Edition 2 with – 30 NUPs (For DC and DR for Third party AMR DB and Testing DB at DC) Annual Technical Support (ATS)/Product update for all Oracle products listed on sl. no. 11 and 13 for 5 years DB License – Enterprise :- Standard License for Database of Antivirus server/HIPS Antivirus Software :- For all Physical and Virtual servers NMS (Network Monitoring System) :- Tool for Infrastructure Monitoring Monitoring of both DC and DR infrastructure from single location at DC. Tool for Security Monitoring :- Alerts/ Monitoring Tool for log viewer / analysis Remote Connectivity Software :- Minimum 5 separate active meeting License with minimum 50 users in single meeting. Network & Security External Firewall :- Must provide a minimum of 10 Gbps throughput, supporting at least 100,000 concurrent sessions and 20,000 new sessions per second. Must deliver at least 2 Gbps of IPSEC VPN throughput and 2 Gbps of NGFW performance. Must include 8x1G copper ports and 4x10 Gbps SFP+ ports from day 1, with minimum 480 GB internal storage for raw logs. The appliance must be the latest model, released within the last 2 years, to ensure a good hardware lifecycle. Internal Firewall (Different OEM) :- Provide a minimum of 7.2 Gbps throughput for threat prevention, supporting 100,000 concurrent sessions and 20,000 new sessions per second. Deliver at least 6 Gbps of IPSEC VPN throughput and 7.2 Gbps of NGFW performance. Include dedicated HA ports, 81/10G copper ports, and 8x10 Gbps SFP+ ports from day 1, with the capability to support 4*25G ports in the future, and 480 GB of internal storage for raw logs. The appliance must be the latest model, released within the last 2 years, to ensure a good hardware lifecycle. Network Switch L2 for Network path :- The switch should have minimum of 48 nos. 10/100/1000 Ethernet Ports and in addition 8 nos. of 10Gig SFP+ uplink ports. L2 and L3 Switch should be from same OEM. Fully loaded with SFP/SFP+/QSFP/QSFP+ whichever applicable along with fiber and ethernet cables. Network Switch L2 OOB (mgmt.) :- Should support a minimum of 48 nos. 10/100/1000 Ethernet Ports Should support a minimum of 4*10G SFP+ Uplinks Should support 1G/10G trans receivers for uplink ports. Should support Switching bandwidth of Min 176 Gbps Should support 64-Byte Packet Forwarding Rate of Min 130 Mpps Should support multi Core CPU Should support minimum 2 GB of Flash memory Should support minimum of 2 GB of DRAM Should support 4K Active VLANs Should support Jumbo frames of 9K bytes Should support up optimum number of Unicast MAC addresses and stacking Network Switch L3 :- The switch should have minimum of 48 nos. 1/10/25G Gigabit Ethernet Ports and in addition 4 nos. of 40/100 Gig Uplink Ports. Switch should be loaded with 32x 10G Multi Mode SFP+, 8x 1G Multimode SFP and 8x 1G Copper SFP Modules from day 1. L2 and L3 Switches should be from same OEM. Switch shall have 16 GB RAM and 16 GB Flash Switch should support optional 240 SSD to host 3rd party container- based application. Switching system shall have minimum 1.5 Tbps of switching fabric and minimum 1Bpps of forwarding rate. Switching system shall have minimum 60K MAC Addresses and 1K VLANs. Switch should support minimum 18K ACLs, 16K Multicast Routes and 64K IPv4 Routes, 32K IPv6 Routes. Switch shall support application visibility and traffic monitoring with minimum 60 K sflow/jflow/netFlow entries. Packet buffer: 32 MB Eight egress queues per port Fully loaded with SFP / SFP+ / QSFP / QSFP+ whichever applicable along with fiber and ethernet cables. Load Balancer, WAF with reverse Proxy :- Minimum 02 nos. 40Gig ports and at least 02 nos. 25Gig ports, 4 x 10G and 2 x 25G and 2 x 40G Transceivers module/SFP populated from day 01. Minimum 10 Gbps L4-L7 throughput. Minimum 10 Million concurrent TCP connections. Minimum 100K L4 TCP connections / second. Minimum 500k HTTP request / second. 2K RSA and 2K ECC SSL transactions per second. SLL TPS rating specify the number of new SSL connections (Key exchanges) per second without session key reuse. Minimum of 3 Gbps SSL throughput and hardware compression of 3Gbps.. Data Center Devices RACK with PDUs :- RACK 42U. Each rack should be equipped with a Dual Power Supply Automatic Transfer Switch (ATS) to support devices with single power supplies, enabling connection for a minimum of 1 such devices per Rack. Inbuilt power management, Humidity Sensor and Temperature sensor and Smoke Detector. Patch Panel, Cabling and Connectivity cabling, Tie, tagging, Power cables and other accessories :- Cat6e Cabling, Patch cords, Fiber cabling and patch cords along with required SFP/SFP+/QSFP/QSFP+ and power Cables for setting up DC and DR Infra UPS with Battery Bank :- Online UPS Workstation :- Processor 13th Generation Intel Core i7 processor with 30 MB cache, 16 cores 3.4GHz Base Chipset Intel W680 Chipset or better Memory 32 GB,256 GB SSD,DDR4 RAM 4400 MHz ECC Memory expandable up to 128 GB, Min. 4 DIMM Slots Service and Support Installation, configuration, migration, DC-DR set-up and overall system integration. Services: - All warranties, licenses, and support should be premium, as provided by the Original Equipment Manufacturer (OEM), ensuring the shortest possible waiting period and the highest level of onsite support available. All warranties and licenses should be secured for a total duration 5 years, without requiring annual renewals or mutual discussion with the client. Manpower: - Onsite minimum one resources deployment for 5 years both at DC and DR location. Rest of the team can be in-house to SI.

Key Value

Document Fees
Refer document
EMD
INR 6500000.0 /-
Tender Value
INR 30.25 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail