}

Tender For For The Different Work Of Electrification At Various Place Under Full Deposit Scheme 2024-25 Under Eudd-Iii Bareilly - For The Work Ofshifting Of 01 No. Pcc Pole Of Mr. Mahaveer Singh, Rajendra Nagar,Bareillyfull Deposited Fund-2024-25 Under Eu, bareilly-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For For The Different Work Of Electrification At Various Place Under Full Deposit Scheme 2024-25 Under Eudd-Iii Bareilly - For The Work Ofshifting Of 01 No. Pcc Pole Of Mr. Mahaveer Singh, Rajendra Nagar,Bareillyfull Deposited Fund-2024-25 Under Eu. Submission Date for this Tender is 06-12-2024. Electrification Work Tenders in bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

46338617
Tender For For The Different Work Of Electrification At Various Place Under Full Deposit Scheme 2024-25 Under Eudd-Iii Bareilly - For The Work Ofshifting Of 01 No. Pcc Pole Of Mr. Mahaveer Singh, Rajendra Nagar,Bareillyfull Deposited Fund-2024-25 Under Eu
Open Tender
Indian
Uttar Pradesh
Bareilly
06-12-2024

Tender Details

Tender For The Different Work Of Electrification At Various Place Under Full Deposit Scheme 2024-25 Under Eudd-Iii Bareilly - For the work ofShifting of 01 No. PCC Pole of Mr. Mahaveer Singh, rajendra Nagar,BareillyFull deposited fund-2024-25 under EUDD-III, Bareilly. 2 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 3 PCC Pole (8.5 Mtr. Long) 4 L.T Distribution Box (03 Phase) 5 Erection Work 6 Erection ofPCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete 7 Fixing L.T Distribution Box (03 Phase) and making all connections . 8 Supply & Fixing of LT Clamps with Nut & Bolts 9 For the work ofShifting of 01 No. PCC Pole of Mr. Umesh Gangwar,Sanjay Nagar Byepass BareillyFull deposited fund-2024-25 under EUDD-III, Bareilly. 10 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 11 PCC Pole (8.5 Mtr. Long) 12 L.T Distribution Box (03 Phase) 13 M.S Erathing Rod 14 Erection & Fixing 15 Erection ofPCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete 16 Fixing L.T Distribution Box (03 Phase) and making all connections . 17 Earthing of Pole by M.S Erathing rod 18 Supply & Fixing of DistributionClamps with Nut & Bolts 19 For the work of Electrification of Commercial Building of Mr. Akeel Ahmad, Ekta nagar, Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly. 20 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 21 ST Pole (11 Mtr. Long) 22 11 KV XLPE Cable (3x70sqmm) 23 11 KV Cable Jointing Kits O/D (3x70sqmm) 24 New 100 KVA T/F 25 M.S Erathing Rod 26 11 KV Pin Insulator With Pin 27 ACSR Weasal Conductor 28 Top Channel 29 S/s Base Angle 30 Erection Work 31 Erection ofST.D/ Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete. 32 Laying of 11 KV XLPE Cable (3x70sqmm) 33 Filling 11 KV Cable Jointing Kits O/D (3x70sqmm) 34 Hoisting of30 meter 11 KV XLPE Cable (3x70 Sqmm) on double pole boat with GI pipe of size 6 dia including the jumpering complete with clamps , nut and bolts 35 Mounting of 100 KVA T/F on D/polealongwith making all connections . 36 Chemical Erathing of 100 KVA T/F Body & Neautral 37 Erthing of ST Poles by MS Earhing Rod 38 Fixing 11 KV Pin Insulator With Pin . 39 ACSR Weasal Conductor 40 Top Channel 41 S/s Base Angle 42 Supply of Following Materials 43 G.I Pipe 6 Dia 44 Holding clamps with nut & Bolts 45 Stone Pad 46 Fot the giving of Temporay Connection to Mr. Deepak Gupta, rajendra Nagar, Bareilly under under Full deposited fund-2024-25 under EUDD-III, Bareilly 47 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 48 PCC Pole (8.5 Mtr.) 49 L.T Distribution Box (03 Phase) 50 A.B Cable (3X50 sqmm) 51 M.S Erathing Rod 52 Erection Work 53 Erection ofPCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete 54 Fixing L.T Distribution Box (03 Phase) and making all connections . 55 Earthing of Pole by M.S Erathing rod . 56 Laying of A.B. Cable (3x50sqmm) 57 Supply of Following Materials 58 LT Clamps with nut & Bolts 59 For the work of Sifting of Electyrical Infrastruture from Gate no. 04 to 05 of Gangasheel Hospital, D.D.Puram Bareilly 60 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 61 ST Pole (11 Mtr. Long) 62 11 KV XLPE Cable (3X120 sqmm) 63 11 KV Cable Jointing Kit (3x120SQMM) 64 ACSR Weasal Condcutor 65 11 KV Pin Insulator with Pin 66 S/s Base Angle 67 M.S Erathing Rod 68 TOP Channle 69 Stay Set Complete 70 Erection Work 71 Erection ofST.D/ Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete 72 Laying 11 KV XLPE Cable (3X120 sqmm) 73 Filling of 11 KV Cable Jointing Kit (3x120SQMM) 74 Laying of ACSR Weasal Condcutor. 75 Earthing ofPoles by M.S Erathing Rod . 76 Fixing of 11 KV Pin Insulator with Pin 77 Fixing of S/s Base Angle 78 Fixing ofTOP Channle 79 Erection & Fixing of Stay Set Complete . 80 Chemical erathing of 11 KV Metering Cubical (all Materails supllied by Contractor) 81 Dismentling & Sfitingof Exisiting of Metering Cubical . 82 Dismentling of old D/Pole and recived back to Central Store C.B Ganj,Bareilly 83 Supply of Following Materials 84 G.I.Pipe6 Dia 85 For the work ofShifting of 01 No. PCC Pole of Mr. Prem Babu Sharma , Block-C-285,Rajendra Nagar , BareillyFull deposited fund-2024-25 under EUDD-III, Bareilly. 86 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 87 PCC Pole (8.5Mtr. Long) 88 PCC Pole (8.5Mtr. Long) 89 03 Phase Distribution Box (03 Phase) 90 Erection Work 91 Erection ofPCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete 92 Fixing L.T Distribution Box (03 Phase) and making all connections . 93 Supply & Fixing of LT Clamps with Nut & Bolts 94 For the work ofShifting of02 No. STP Pole of Smt.Swati Khandelwal , C-48,Rajendra Nagar , Bareilly Full deposited fund-2024-25 under EUDD-III, Bareilly. 95 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 96 ST Pole (11Mtr. Pole ) 97 LT XLPE Cable Al(3.5x150 sqmm) 98 M.S Erathing Rod 99 Top Channel 100 S/s Base Angle 101 Erection Work 102 Erection ofST Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete. 103 Laying ofU/G LT XLPE Cable Al(3.5x150 sqmm) 104 Hoisting of70 meter LT XLPE Cable Al(3.5x150 sqmm) on pole boat with GI pipe of size 6 dia including the jumpering complete with clamps , nut and bolts 105 Erathing of Poles by M.S Earthing rod 106 Fixing of Top Channel 107 Fixing of S/s Base Angle 108 Supply of Following Materials 109 Holding Clamps with nuts & Bolts 110 GI pipe of size 6 dia 111 For the work of Giving LMV-11connection a t Bajrang Auto Service Shahjanpur Road, Bareilly Full deposited fund-2024-25 under EUDD-III, Bareilly.ly. 112 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 113 ST Pole 11 Mtr. Long 114 11 KV XLPE Cable (3x70sqmm) 115 11 KV Cable Jointing Kit O/D 116 100 KVA T/F 117 ACSR Weasal Conductor 118 MS Erathing Rod 119 Stay Set Complete 120 Top Channel 121 11 KV Pin Insulator with Pin 122 S/s Base Angle 123 Erection Work 124 Erection ofST D/Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete. 125 Under Ground Laying of 11 KV XLPE Cable (3x70sqmm) by digging method . 126 Filling of 11 KV Cable Jointing Kit O/D 127 Hoisting of40 meter 11 KV XLPE Cable (3x70sqmm)on pole boat with GI pipe of size 6 dia including the jumpering complete with clamps , nut and bolts 128 Mounting of 100 KVA T/f on D/Pole alongwith making all connections . 129 Chemical Erathing of 100 KVA T/F ( all required materails supplied by contractor). 130 Laying of ACSR Weasal Conductor 131 Erection of Stay Set Complete in all respect. 132 Fixing of Top Channel 133 Erathing of Poles by MS Earthing rod 134 Fixing of 11 KV Pin Insulator with Pin 135 Fixing S/s Base Angle 136 Supply of Following Materials 137 Holding Clamps with nuts & Bolts 138 GI pipe of size 6 dia 139 Stone PAD 140 Al Paint 141 Red Oxide Paint 142 For the work of replacement of damaged XLPE Cable of SDO,BSNL,Rajendra Nagar ,Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly. 143 Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading . 144 11 KV XLPE Cable (3x120sqmm) 145 11 KV Cable Jointing Kit O/D(3x120sqmm) 146 Erection Work 147 Under ground Laying of11 KV XLPE Cable (3x120sqmm) by digging method . 148 Filling of 11 KV Cable Jointing Kit O/D(3x120sqmm) 149 Hoisting of30 meter 11 KV XLPE Cable (3x120sqmm)on pole .

Key Value

Document Fees
INR 1180 /-
EMD
INR 4400.0 /-
Tender Value
INR 4.40 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail