| 1 | Stay clamp with N&B |
| 2 | Cable holding G-I Clamp |
| 3 | LT(Unam).XLPE Insulated cable 1x70sq mm |
| 4 | AL CRIMPING TYPE LUGS 95 SQ MM |
| 5 | AL CRIMPING TYPE LUGS 150 SQ MM |
| 6 | AL CRIMPING TYPE LUGS 120 SQ MM |
| 7 | AL CRIMPING TYPE LUGS 70 SQ MM |
| 8 | AL CRIMPING TYPE LUGS 300 SQ MM |
| 9 | Insulated peircing connector for 120X120 |
| 10 | Total (A) |
| 11 | LABOUR |
| 12 | CONSTRUCTION OF RETURNING WALL & PLINTH |
| 13 | CHEMICAL EARTHING |
| 14 | ERRECTION OF EARTHING ROD |
| 15 | Fabrication of Steel |
| 16 | Excavation of Pit for Stay Set |
| 17 | Erection of LT Stay Set |
| 18 | Erection of 11 KV Stay Set |
| 19 | Grouting of Stay Set |
| 20 | Excavation of PIT for Pole |
| 21 | Erection of Single PCC Pole |
| 22 | Erection of PCCDouble Pole |
| 23 | Erection of Single SP-55 Pole |
| 24 | Dismentaling of 63KVA DTR |
| 25 | Dismentaling of 100 KVA DTR |
| 26 | Fencing of DTR |
| 27 | Inst. Of 100KVA DTR on Pole structure |
| 28 | Inst. Of 250KVA DTR on Plinth |
| 29 | Fixing for LT Fuse Set |
| 30 | Fixing for Fuse Set |
| 31 | Fixing of lightening Arrester |
| 32 | T-Off connection complete 11 KV Line |
| 33 | Making of Section Pole |
| 34 | Cartage PCC Pole, 21-50 KM |
| 35 | Cartage of SP-55Pole, 21-50 KM |
| 36 | Cartage of Petty Material, 21-50Km |
| 37 | Cartage of 63 KVA DTR, 21-50 Km |
| 38 | Cartage of 100 KVA DTR, 21-50 Km |
| 39 | Cartage of 250KVA DTR, 21-50 Km |
| 40 | Head Load cartage of PCC Pole(0-1 km) |
| 41 | Head Load cartage of material (0-1 km) |
| 42 | Head Load cartage of 100 KVA DTR(0-1 km) |
| 43 | Laying of LT XLPE ABC 3x95+1x70Sq. |
| 44 | Laying of LT XLPE ABC 3x120+1x95+1x16Sq. |
| 45 | Straightening of tilled PCC Poles |
| 46 | Disconnection & Reconnection ofconsumers |
| 47 | Inst. OF DANGER BOARD/Number Plate |
| 48 | Sagging/resagging of ACSR /ABC LT Line |
| 49 | Laying & fixing of LT XLPE Cable |
| 50 | Fixing of PIERCING CONNECTOR 42L 120-120 |
| 51 | Jumfer of section Pole |
| 52 | Supply & fixing of X-ARM Holding clamp SP-55 |
| 53 | Supply & fixing of Stay clamp for PCC Pole |
| 54 | Supply & fixing of Stay clamp SP-55 |
| 55 | Laying of1x35 sq mm XLPEInsulated Cable |
| 56 | Renozzeling & fixing of Stay Set |
| 57 | Supply & fixing of 3P Distribution box |
| 58 | Fixing of PIERCING CONNECTOR 120-95 |
| 59 | Supply & FixingSuspension Clamp |
| 60 | Supply & FixingDead EndClamp |
| 61 | Supply & Fixing AL LUG 1X70SQ MM |
| 62 | Supply & Fixing AL LUG 1X120SQ MM |
| 63 | Supply & Fixing AL LUG 1X400SQ MM |
| 64 | Supplyof MS NUT & BOLT OFF SIZE |
| 65 | Looping & chopping of Tree Branches |
| 66 | Laying of LT PVC Cable (up to 150sq mm) |
| 67 | Errection of bracket in LT Line |
| 68 | Laying of weasel conductor in HT Line |
| 69 | Resagging of 11KV Line |
| 70 | Resagging ofLT AB Cable |
| 71 | Jumfering of D/P TPMO, FUSE SET AND T/F |
| 72 | Renozzeling OF Existing of Stay Set |
| 73 | Supply & fixing PRC L2L 95-95 |
| 74 | Supply & fixing PRC L2L 120-120 |
| 75 | Supply & fixing PRC L2L 95-95 |
| 76 | Supply & fixing of LT XLPE AB CABLE 1X50SQ MM |
| 77 | Supply & fixing of LT XLPE AB CABLE 1X400SQ MM |
| 78 | Company/Firm Name |
| 79 | Name |
| 80 | Designation |
| 81 | Date |