| 1 | Supply, fixing & erection of following material as per site requirement and as per RESSPO norms. Including labour & overhead charge.STP Pole 11 MTR SP 72 |
| 2 | Stone Pad 300x300x75mm |
| 3 | Top channel 125x65x3200 mm 1 no with 2 nos clamps. |
| 4 | M/s. Angle iron 65x65x6mm with 2 nos bracing, 4 clamps. |
| 5 | Disc insulator B&S type 7000 Kg |
| 6 | Disc fitting for DOG |
| 7 | 33 KV Pin Insulator |
| 8 | 33 KV Pin with nut |
| 9 | P.G. clamp dog conductor |
| 10 | E Bracket for 33 KV |
| 11 | Barbed Wire |
| 12 | Aluminium Binding wire |
| 13 | Danger Board with clamp 33 KV |
| 14 | MS Nut Bolt with warshers all size |
| 15 | Earthing complete |
| 16 | Stay complete 11 KV |
| 17 | Aluminium Paint |
| 18 | Red oxide paint |
| 19 | Earth wire clamp with nut & bolts. |
| 20 | V Type Cross Arm with clamp |
| 21 | 11 KV pin insulator |
| 22 | F Bracket |
| 23 | Gaurding angle with clamp |
| 24 | GI Wire 10 SWG |
| 25 | GI Wire 8 SWG |
| 26 | Top channel M.S 100x50x2240 |
| 27 | Dropper Channel 100x50x2028 mm with 2 nos clamps |
| 28 | 11 KV Disc fittingDOG/RACOON |
| 29 | 11 KV Pin Insulator |
| 30 | 11 KV Pin with nut |
| 31 | P.G. clamp dog conductor |
| 32 | E Bracket for 11 KV |
| 33 | Number plate |
| 34 | Aluminium Tape |
| 35 | LT Insulator Pearsing connector |
| 36 | Insulator suspension clamp with I hook |
| 37 | Dead & clamp with I hook |
| 38 | Distribution Box with clamp |
| 39 | Tee of Channel |
| 40 | Top channel |
| 41 | M.S. Angle |
| 42 | Holding Clamp |
| 43 | 11 KV pin insulator with pin |
| 44 | 11 KV Disc insulator with fitting |
| 45 | TPMO Complete 11 KV |
| 46 | 11 KV DO Fuse Set |
| 47 | Danger Plate with Clamp |
| 48 | Concreting of support / Pole |
| 49 | Concreting of stay |
| 50 | ACSR Dog Conductor including 5% sagging. |
| 51 | 11 KV XLPE Cable 3Cx185 Sq.mm |
| 52 | GI Pipe 6\" Dia |
| 53 | 11 KV Cable Box O/D for 3*185 Sq,mm XLPE |
| 54 | HDPE Pipe (160 mm dia for undergroundlaying of 3C*300 Sq.mm 33 KV XLPE Cable (Pipe to be laid by HDD Method.) |
| 55 | Laying of HDPE Pipe underground minimum 3 mtr. Below by HDD method trunch less alongwith laying of 11 KV 3C*185 Sq.mm XLPE cable in HDPE Pipe. |
| 56 | Laying of 3C*185 Sq.mm 11 KV XLPE Underground Cable |
| 57 | LT ABC Cable (3x95+1x70+1x6) Sq.mm |
| 58 | LT Cable 3.5x70/150 Sq.mm |
| 59 | 25 KVA T/F |
| 60 | 63 KVA T/F |
| 61 | 33 KV XLPE Cable 3Cx300 Sq.mm |
| 62 | 33 KV Cable Box O/D for 3*300 Sq.mm XLPE |
| 63 | Laying of 3C*300 Sq.mm 33 KV XLPE Underground Cable |
| 64 | Received Back Material including loading, unloading & shifing from side to store complete labour & T&PACSR Conductor (Scrap) |
| 65 | 33 KV XLPE Cable 3x300 Sq.mm (Damage) |
| 66 | STP Pole 11 Mtr (Scrap) |
| 67 | Rail Pole (Scrap) |
| 68 | Iron Scrap |