Construction Of Fstp 2.0 At Rajgangpur Municipality - Earth work excavation in all kind of soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and leveling the bed...etc complete in all respect and as per the direction of Engineer-in-charge. 2 Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. 3 C.C (1:4:8) with 4cm size HG Crusher BROKEN metal including all cost, conveyance,royalty & taxes etc.comp.to work site as per specification approved by the department & direction of E.I.C. 4 Brick work with Fly Ash bricks of size 25cmx12cmx8cm and crushing strength not less than 75 kg/cm2 in C.M.(1:4) in foundation and plinth including all charges. 5 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(a)Colum Footing 6 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(b)Column ground Floor 7 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(b)Column First Floor 8 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(b)Column Second Floor 9 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(c)Plinth Bed 10 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(d) Lintel Ground Floor 11 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(d) Lintel First Floor 12 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(d) Lintel SecondFloor 13 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(e) Roof Beam Ground Floor 14 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(e) Roof Beam First Floor 15 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(f) RoofSlab Ground Floor 16 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(f) Roof Slab First Floor 17 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(f) Roof Slab Second Floor 18 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(g) Chhaja Ground Floor 19 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(g) Chhaja First Floor 20 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(g) Chhaja Second Floor 21 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(h) Stair Case Ground Floor 22 Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries, T&P required for the work etc. completeinall respectbutthe excluding cost &conveyanceof M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc.ofM.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge.(h) Stair Case Second Floor 23 Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only..(a) Ground Floor 24 Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only..(a) First Floor 25 Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:6) in superstructure per cum.(a) Ground Floor 26 Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:6) in superstructure per cum.(a) FirstFloor 27 Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:6) in superstructure per cum.(a) SecondFloor 28 Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:4) in superstructure per cum.(A) Ground Floor 29 Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:4) in superstructure per cum.(A) first Floor 30 Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge.(a) Ground Floor 31 Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge.(a)First Floor 32 Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge.(a) Second Floor 33 16mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm.(a)Ground Floor 34 16mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm.(a)First Floor 35 16mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm.(a) Second Floor 36 6mm thick cement plaster (1:4) onRCC concrete drain work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm.(a) Ground Floor 37 6mm thick cement plaster (1:4) onRCC concrete drain work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm.(b) First Floor 38 6mm thick cement plaster (1:4) onRCC concrete drain work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm.(c)Second Floor 39 Wall painting 2 coats with weather coat over a coat of primer to inside and out side smooth surface with all cost of labour, T&P material etc complete.(a) Ground Floor 40 Wall painting 2 coats with weather coat over a coat of primer to inside and out side smooth surface with all cost of labour, T&P material etc complete.(b) First Floor 41 Wall painting 2 coats with weather coat over a coat of primer to inside and out side smooth surface with all cost of labour, T&P material etc complete.(c) Second Floor 42 Wall painting 2 coats with Plastic emulsion paint of approved shade over a coat of primer on new work to give an even shadewith all cost of labour, T&P material etc complete.(a) Ground Floor 43 Wall painting 2 coats with Plastic emulsion paint of approved shade over a coat of primer on new work to give an even shadewith all cost of labour, T&P material etc complete.(b) First Floor 44 Wall painting 2 coats with Plastic emulsion paint of approved shade over a coat of primer on new work to give an even shadewith all cost of labour, T&P material etc complete.(c) Second Floor 45 M.S. Grill gate made out of M.S. flat conforming to IS 2062/20006 painted with red oxide primer as pe the design approved. 46 Painting two coats with approved synthetic enamel paints of Asian / Berger/Dulox makeand of approved colour, shade to new Iron including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Paint & Primer shall be approved before procurement and use. 47 Dressed and Seasoned Sal wood work for door frames. 48 Supplying, fitting and fixing of 32mm thick flush door shutter with approved quality of 30mm thick BWR block board pasted with 1mm thick sunmica on both side of approved design and quality including cost of all door fitings and fixtures etc. complete. (SR-2022 New Miscellaneous Item-9 , Page-234). 49 Providing, fitting,fixing of Aluminium Door with OEL anodized aluminium door section of 9202 as vvertical member,9201 as top member and 9200 as bottom and middle member and 12mm thick prelaminated board fixed on door frame by means of tapered clipNo.4660 and frame to becompleted by means of jointing angle No.1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc.complete 50 Supplying, fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fittings and fixtures.(SR-2022 New Miscellaneous Item-12 , Page-235). 51 Fixing vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete.(a)Ground Floor 52 Fixing vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete.(b)First Floor 53 Fixing vetrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixedwith pigments to match the shade of the tiles including rubbing and polishing complete..(a)Ground Floor 54 Fixing vetrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixedwith pigments to match the shade of the tiles including rubbing and polishing complete..(b)First Floor 55 Fixing of ceramic floor tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete.(a)Ground Floor 56 Fixing of ceramic floor tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete.(b)First Floor 57 Fixing Ceramic wall tilesin dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixedwith pigments to match the shade of the tiles including rubbing and polishing complete.(a)Ground Floor 58 Fixing Ceramic wall tilesin dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixedwith pigments to match the shade of the tiles including rubbing and polishing complete.(b)First Floor 59 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips complete all as per direction of Engineer-in-Charge.(a) First Floor 60 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips complete all as per direction of Engineer-in-Charge.(b) Second Floor 61 Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. 62 Drilling suitable holes in reinforcement or plain cement concrete with powerdriven drill machine to a minimum depth of 100 mm upto 200 mm in RCCbeams, lintels, columns and slabs to introduce steel bars forsunshades/balconies including fixing the steel bars in position using epoxyresin anchor grout of approved make but excluding the cost of reinforcement,all complete as per direction of Engineer-in-charge.Ground Floor 63 Dismantling and reinstallation work of 10KW roof top Solar Power plant from First floor to Second floor with dismantling of solar pannels,blocks, module rewiring, civil foundation for inverter, inverter installation, AJB reinstallation, installation and commissioning of system, solar log activation and monitoring, any other additional items required.Ground Floor 64 Supply and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP- 63:2018. (SR-2022 New Miscellaneous Item-2 , Page-233). 65 Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. 66 C.C (1:4:8) with 4cm size HG Crusher BROKEN metal including all cost, conveyance,royalty & taxes etc.comp.to work site as per specification approved by the department & direction of E.I.C. 67 Supplying and fixing of Pre cast kerb stone of size 600mm x 300mm x 150mm of M-30 grade of approved make, design, colour and size made by Block making machine with proper compaction fixed in required pattern etc. complete in all respect conforming to IS 5758: 1984.(SR-2022 New Miscellaneous Item-4 , Page-234) 68 PH & Sanitary Works @10% Of Civil Works 69 Electrical Works @10% Of Civil Works 70 Adding 18% for GST