}

Tender For Air Conditioning And Ventilation System And Pumps For Water System, bhilai-Chhattisgarh

Mecon Limited has published Tender For Air Conditioning And Ventilation System And Pumps For Water System. Submission Date for this Tender is 29-11-2024. Air Conditioner Tenders in bhilai Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

46068202
Corrigendum : Tender For Air Conditioning And Ventilation System And Pumps For Water System
Open Tender
Indian
Chhattisgarh
Bhilai
29-11-2024

Tender Details

Air Conditioning And Ventilation System And Pumps For Water System Air Conditioning And Ventilation System And Pumps For Water System Required Against Project For Replacement Of Converter Vessels Trunnion Rings Support System And Installation Of Secondary Emission Control System For 3 Converters In Sms Ii , Part A(Acvs) , Air Conditioning System (Supply) , Water Cooled Packageair Conditioners , Water Cooled Package Ac Unit 20 Or 21Tr Nominal Capacity, Consisting Of Scroll Compressor, Cooling Coil, Refrigerant Circuit, Condenser, Thermostatic Expansion Valve, Blower, Air-Filter, Mcc, Electric Drives, Instruments & Control And Other Standard Accessories Assembled In A Steel Cabinet. , Induced Draft Cooling Tower& Accessories (135 Tr Minimum), , Condenser Cooling Pumps & Accessories 100 M3/Hr, Head 30M , In-Line Booster Fan & Accessories , Gi Ducting With Supports, Grill, Diffuser, Fittings, Etc. , Balancing Valve At Package Ac Return Line , Ms Heavy Class Condenser, Make Up Water & Drain Piping, Pipe Fittings, Valves & Strainer Etc. , Make-Up Air Filter, Dampers, Cowl & Bird Mesh , Return Air Grill , Strip Heater , Pan Humidifier With Piping & Controls , Instruments & Controls, Pressure Gauge Thermometer, Thermostat,Humidistat , Geyser Stat, Water Flowswitch, Etc. , Acoustic And Thermal Duct Line Insulation /Gi Cladding , Under Deck Thermal Insulation Of The Exposed Roof Of Air Conditioning Premises , Sub Total For Supply Of Air Conditioning System , Air Conditioning System(Erection) , Water Cooled Packageair Conditioners , Water Cooled Package Ac Unit 20 Or 21Tr Nominal Capacity, Consisting Of Scroll Compressor, Cooling Coil, Refrigerant Circuit, Condenser, Thermostatic Expansion Valve, Blower, Air-Filter, Mcc, Electric Drives, Instruments & Control And Other Standard Accessories Assembled In A Steel Cabinet. , Induced Draft Cooling Tower& Accessories (135 Tr Minimum), , Condenser Cooling Pumps & Accessories 100 M3/Hr, Head 30M , In-Line Booster Fan & Accessories , Gi Ducting With Supports, Grill, Diffuser, Fittings, Etc. , Balancing Valve At Package Ac Return Line , Ms Heavy Class Condenser, Make Up Water & Drain Piping, Pipe Fittings, Valves & Strainer Etc. , Make-Up Air Filter, Damper, Cowl & Bird Mesh , Return Air Grill , Strip Heater , Pan Humidifier With Piping & Controls , Instruments & Controls, Pressure Gauge Thermometer, Thermostat,Humidistat , Geyser Stat, Water Flowswitch, Etc. , Acoustic And Thermal Duct Line Insulation /Gi Cladding , Under Deck Thermal Insulation Of The Exposed Roof Of Air Conditioning Premises , Sub Total For Erection Of Air Conditioning System , Total For Supply And Erection Of Air Conditioning System , Ventilation System(Supply) , 1. Lt Switchgear/Mcc Room:Washed Air Ventilation System , Washer Air Pressurized Ventilation System( Spray Type) Of Capacity 1X22,500 M3/Hr(Min)With Centrifugal Fans, Centrifugal Pumps, Ducting, Grillsetc. , Battery Room- Exhaust Ventilation , Wall Mounted Tube Axial Fan, Bifurcated Type (1X1500cmh @ 15Mmwc) Based Exhaust Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screen Etc. , Transformer Rooms- Exhaust Ventilation , Wall Mounted Tube Axial Fan (1X13500cmh @ 15Mmwc) Based Exhaust Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screenetc. , Cable Cellar-Push Pull Type Ventilation System , Wall Mounted Supply Tube Axial Fan (1X6000cmh @ 25Mmwc) Based Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screenetc. , Wall Mounted Supply Tube Axial Fan (1X6000cmh @ 15Mmwc) Based Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screen Etc. , Toilet- Exhaust Ventilation , Wall Mounted Propeller Fan (1X1100cmh) Based Exhaust Ventilation System With Motor,Bird Screen Etc. , Electrical Power Requirement/Provisions Of Acvs And Pumps For Water System Consisting Of All Items As Indicated In Underclause No. 14.00(2)Of Technical Specification , Sub Total For Ventilation System(Supply) , Ventilationsystem(Erection) , Lt Switchgear/Mcc Room:Washed Air Ventilation System , Washer Air Pressurized Ventilation System( Spray Type) Of Capacity 1X22,500 M3/Hr(Min)With Centrifugal Fans, Centrifugal Pumps, Ducting, Grills, Electrics Etc. , Battery Room- Exhaust Ventilation , Wall Mounted Tube Axial Fan, Bifurcated Type (1X1500cmh @ 15Mmwc) Based Exhaust Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screenetc. , Transformer Rooms- Exhaust Ventilation , Wall Mounted Tube Axial Fan (1X13500cmh @ 15Mmwc) Based Exhaust Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screenetc. , Cable Cellar-Push Pull Type Ventilation System , Wall Mounted Supply Tube Axial Fan (1X6000cmh @ 25Mmwc) Based Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screen Etc. , Wall Mounted Supply Tube Axial Fan (1X6000cmh @ 15Mmwc) Based Ventilation System With Motor, Common Fixing Frame, Cowl, Bird Screen Etc. , Toilet- Exhaust Ventilation , Wall Mounted Propeller Fan (1X1100cmh) Based Exhaust Ventilation System With Motor,Bird Screen Etc. , Electrical Power Requirement/Provisions Of Acvs And Pumps For Water System Consisting Of All Items As Indicated In Underclause No. 14.00(2)Of Technical Specification , Sub Total For Ventilation System(Erection) , Total For Supply And Erection Ofventilation System , Part B Water System , Water System (Supply) , Motor Driven Booster Pump-Motor Sets For Fire Fighting System- Flow-137 M3/Hr, Head-70Mwc , Diesel Engine Driven Fire Water Pump Sets For Fire Fighting System- Flow-137 M3/Hr, Head-70Mwc , Pump-Motor Sets For Drinking Water System- Flow-2M3/Hr, Head-25Mwc , Rubber Expansion Joints, Dn200 , Rubber Expansion Joints, Dn150 , Wrapping Coating Material , Sub Total Of Water System(Supply) , Water System (Erection) , Booster Pump-Motor Set For Fire Fighting System- Flow-137M3/Hr, Head-70Mwc , Booster Pump- Diesel Engine Driven Set For Fire Fighting System- Flow-137M3/Hr, Head-70Mwc , Pump-Motor Sets For Drinking Water System- Flow-2M3/Hr, Head-25Mwc , Rubber Expansion Joints, Dn200 , Rubber Expansion Joints, Dn150 , Wrapping Coating Material , Gate Valve , Dn40 , Dn150 , Dn200 , Non-Return Valve , Dn150 , Dn40 , Float Valve , Dn50 , Pipe And Pipe Fittings , Pressure Gauges With Isolation Valve , Pressure Switches With Isolation Valve , Drain Valve , Dn25 , Sub Total Of Water System (Erection) , Total For Supply And Erection Water System , Part C Operation & Maintenance , All Inclusive” Operation & Maintenance Of The Acvs System/Equipment, Which Includes Any Kind Of Refurbishment / Replacement Of Parts Or Components Or Equipment, Spares, Consumables, Manpower And Services As May Be Required From 1St Converter Commissioning Till Integrated Commissioning (With3 Nos. Converter & Lf1), Pg Test Of Acvs System And Handing Over Of Acvs System To Client (Bsp)During Expected Time Period Of 10 Months (As Per Implementation Schedule). , All Inclusive” Operation & Maintenance Of The Water Pumping System , Which Includes Any Kind Of Refurbishment / Replacement Of Parts Or Components, Spares, Consumables, Manpower And Services Required For Smooth Operation Of Pump Sets, Valves, Rubber Expansion Joints Etc. From 1St Converter Commissioning Till Integrated Commissioning (With3 Nos. Converter , Lf1 Alonwith Sec) S, Pg Test Of Water Pumping System Andhanding Over To Client (Bsp) During Expected Time Period Of 10 Months (As Per Implementation Schedule). , Total Of Operation & Maintenance , Part D (Air Piping Around Converter)-Only Suppy , Pipe 200A Ansi B36.1, Sch40; (Carbon Steel) , Pipe 150A Ansi B36.1, Sch40; (Carbon Steel) , Pipe 50A Ansi B36.1, Sch40; (Carbon Steel) , Short Elbow 150A Ansi B16.9 Sch40 (Carbon Steel) , L75x75x6 (E250a Is 2062) , L50x50x6 (E250a Is 2062) , Flat 6 X 50 (E250a Is 2062) , Pl 6 (E250a Is 2062) , Pl 20 (E250br Is 2062) , Pl 16 (E250br Is 2062) , Pl 12 (E250br Is 2062) , Pl 10 (E250a Is 2062) , Pl 8 (E250a Is 2062) , Round Ø18 (E250a Is 2062) , Round Ø12 (E250a Is 2062) , Hex Screw M16x40; Is 1364 P2 (Gr 8.8 Is 1367) , U-Bolt M20 For 200Nb Pipe (Carbon Steel) , U-Bolt M16 For 150Nb Pipe (Carbon Steel) , Hex Nut M16 Is 1364 P3 (Gr 8 Is 1367) , Spring Washer M16 Is 3063 (Spring Steel Is 4072) , Washer M16 Is2016 (Carbon Steel) , Packing Sheet 3 Mm Thk (Nbr) , Packing Sheet 3 Mm Thk (Non-Asbestos Packing Sheet) , Packing Sheet 3 Mm Thk (Ptfe) , Flange Plate 12 Thk (E250br Is 2062) , Blind Plate 10 Thk (E250br Is 2062) , End Plate 5 Thk (E250a Is 2062) , End Plate 6 Thk (E250a Is 2062) , Sub Total For Part D (Air Piping Around Converter)-Only Suppy , Note:Wrapping Coating Materialagainst Sl. No. 14.06 In The Price Schedule Format Quantityis Tentative Which May Change As Per Site Condition. Payment Shall Be Done Based On The Firm Unit Rate And Total Quantity Executed

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 14-11-2024 Corrigendum 1 BOQ 27-11-2024
2 27-11-2024 Corrigendum Date 29-11-2024

Key Value

Document Fees
Refer document
EMD
INR 50000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail