| 1 | Part-A (CC Work)Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4 to 53 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Clause 405(3) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. |
| 2 | Construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. (CH-20, Sl.No.20) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted Earth) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. |
| 4 | Part-B (Drain Work)Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/ manual means. For Building/ Drain work only. & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.As per SOR (CH-4, Sl.No.-251) |
| 5 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.As per SOR (CH-5, Sl.No.-275(a)) |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. As per SOR (CH-6, Sl.No.-1) |
| 7 | 12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level) (I) 1:4 (1 cement : 4 coarse sand) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.As per SOR (CH-13, Sl.No.-584) |
| 8 | Providing and laying cement concrete in 1:2:4 (1 Cement : 2 Coarse sand : 4 graded stone aggregate 20 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. All work upto plinth level. & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.As per SOR (CH-5, Sl.No.-279) |
| 9 | Part-B (CC Work) 05 Year Maintenance Charge @ 2.50%Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)1-1st Year @ Nill |
| 10 | 2nd Year @ 0.25% |
| 11 | 3rd Year @ 0.50% |
| 12 | 4th Year @ 0.75% |
| 13 | 5th Year @ 1.00% |